Battery Engineering Platform - Proposed Baseline Rev 0.1
The product shall provide a replaceable 12.8 V nominal rechargeable energy source.
4S1P LFP reference architecture reviewed against intended load.
Review
Validation
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
The product shall support an agreed load and charger envelope.
Electrical load profile and charger profile approved with voltage/current/pulse ranges.
Review
Validation
V1-12V
Must
Unassigned
Engineering target - proposed
HZ-005
Not Run
The product shall prevent hazardous electrical and thermal operating states.
Hazard review identifies controls and verification for each unacceptable risk.
Review
Validation
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
- CAD-006 CAD-006 - CAD (derives_from)
- SIM-009 SIM-009 - Simulation (derives_from)
- PLT-001 PLT-001 - Platform (derives_from)
- PLT-002 PLT-002 - Platform (derives_from)
- PLT-003 PLT-003 - Platform (derives_from)
- PLT-005 PLT-005 - Platform (derives_from)
- PLT-007 PLT-007 - Platform (derives_from)
- PLT-008 PLT-008 - Platform (derives_from)
- PLT-009 PLT-009 - Platform (derives_from)
- PLT-012 PLT-012 - Platform (derives_from)
- PLT-014 PLT-014 - Platform (derives_from)
The engineering platform shall allow remote access to released engineering designs.
Authorized browser can retrieve released CAD view, requirements, BOM, and reports.
Demo
Validation
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
- SYS-010 SYS-010 - System (derives_from)
- FW-010 FW-010 - Firmware (derives_from)
- CAD-001 CAD-001 - CAD (derives_from)
- CAD-007 CAD-007 - CAD (derives_from)
- SIM-001 SIM-001 - Simulation (derives_from)
- SIM-002 SIM-002 - Simulation (derives_from)
- SIM-003 SIM-003 - Simulation (derives_from)
- SIM-004 SIM-004 - Simulation (derives_from)
- SIM-005 SIM-005 - Simulation (derives_from)
- SIM-010 SIM-010 - Simulation (derives_from)
- PLT-004 PLT-004 - Platform (derives_from)
- PLT-006 PLT-006 - Platform (derives_from)
- PLT-010 PLT-010 - Platform (derives_from)
- PLT-011 PLT-011 - Platform (derives_from)
- PLT-013 PLT-013 - Platform (derives_from)
- VER-001 VER-001 - Verification (derives_from)
- VER-002 VER-002 - Verification (derives_from)
- VER-003 VER-003 - Verification (derives_from)
- VER-004 VER-004 - Verification (derives_from)
- VER-005 VER-005 - Verification (derives_from)
- VER-006 VER-006 - Verification (derives_from)
- VER-007 VER-007 - Verification (derives_from)
- VER-008 VER-008 - Verification (derives_from)
- VER-009 VER-009 - Verification (derives_from)
- VER-010 VER-010 - Verification (derives_from)
- MFG-003 MFG-003 - Manufacturing (derives_from)
- MFG-006 MFG-006 - Manufacturing (derives_from)
The platform shall trace design decisions to requirements and verification evidence.
Sample 10 requirements traced bidirectionally through implementation and test reports.
Inspection
Validation
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
- CAD-005 CAD-005 - CAD (derives_from)
- BOM-001 BOM-001 - BOM (derives_from)
- BOM-002 BOM-002 - BOM (derives_from)
- BOM-003 BOM-003 - BOM (derives_from)
- BOM-004 BOM-004 - BOM (derives_from)
- BOM-005 BOM-005 - BOM (derives_from)
- BOM-006 BOM-006 - BOM (derives_from)
- BOM-007 BOM-007 - BOM (derives_from)
- MFG-001 MFG-001 - Manufacturing (derives_from)
- MFG-004 MFG-004 - Manufacturing (derives_from)
The project shall maintain a costed production BOM and approved alternatives.
100% of released purchasable parts have source, quantity, cost and lifecycle status.
Inspection
Validation
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
- CAD-002 CAD-002 - CAD (derives_from)
- SCL-001 SCL-001 - Scale-up (derives_from)
- SCL-002 SCL-002 - Scale-up (derives_from)
- SCL-003 SCL-003 - Scale-up (derives_from)
- SCL-004 SCL-004 - Scale-up (derives_from)
- SCL-005 SCL-005 - Scale-up (derives_from)
- SCL-006 SCL-006 - Scale-up (derives_from)
- SCL-007 SCL-007 - Scale-up (derives_from)
- SCL-008 SCL-008 - Scale-up (derives_from)
The product family shall support 24 V, 48 V and 72 V-class variants through controlled reuse.
Family architecture defines reusable and variant-specific assets with no safety assumptions inherited implicitly.
Review
Validation
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
The product shall be serviceable using documented diagnostics and replaceable assemblies.
Documented diagnostic workflow identifies each specified field-replaceable assembly.
Demo
Validation
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
The product shall meet the environmental and mechanical needs of its intended use.
Environmental profile and corresponding qualification plan approved.
Review
Validation
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
The project shall support independent review and controlled engineering releases.
Each released baseline carries approver, version, date and evidence manifest.
Inspection
Validation
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
The V1 pack shall contain four LFP cells connected in series.
As-built cell count=4 and measured polarity/topology matches schematic.
Inspection
System
V1-12V
Must
Unassigned
Engineering target - proposed
TR-001
Not Run
The V1 reference energy shall be 256 Wh nominal.
4 × 3.2 V × 20 Ah = 256 Wh in approved reference model.
Analysis
System
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
The V1 pack shall support 20 A continuous discharge at the specified ambient and SOC.
Validated steady-state load profile maintained without exceeding approved electrical/thermal limits.
Test
System
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
The V1 pack shall support 10 A charging where the cell supplier permits.
Charge test at 10 A passes supplier temperature, voltage, and current limits.
Test
System
V1-12V
Must
Unassigned
Engineering target - proposed
HZ-005
Not Run
- ELE-001 ELE-001 - Electrical (derives_from)
- ELE-002 ELE-002 - Electrical (derives_from)
- ELE-003 ELE-003 - Electrical (derives_from)
- ELE-004 ELE-004 - Electrical (derives_from)
- ELE-009 ELE-009 - Electrical (derives_from)
- ELE-011 ELE-011 - Electrical (derives_from)
- FW-001 FW-001 - Firmware (derives_from)
- FW-002 FW-002 - Firmware (derives_from)
- FW-007 FW-007 - Firmware (derives_from)
- FW-008 FW-008 - Firmware (derives_from)
- FW-011 FW-011 - Firmware (derives_from)
- THM-006 THM-006 - Thermal (derives_from)
- THM-007 THM-007 - Thermal (derives_from)
The pack shall interrupt charge/discharge according to the approved protection state table.
Each listed fault produces expected output state and recorded event.
Test
System
V1-12V
Must
Unassigned
Engineering target - proposed
TR-004, TR-005
HZ-001
Not Run
Pack overcurrent/short-circuit protection shall not depend on a cloud connection.
Connectivity removed; hardware protection remains functional in supervised bench test.
Test
System
V1-12V
Must
Unassigned
Engineering target - proposed
TR-007
HZ-002
Not Run
The pack shall incorporate a coordinated fuse and electronic protection concept.
Safety review validates fuse ratings, FET SOA, fault energy, wiring, and disconnection behavior.
Analysis
System
V1-12V
Must
Unassigned
Engineering target - proposed
HZ-002, HZ-007
Not Run
The pack shall expose a defined service interface for diagnostics.
All protocol commands pass interface conformance tests.
Test
System
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
- CEL-003 CEL-003 - Cell (derives_from)
- CEL-004 CEL-004 - Cell (derives_from)
- CEL-007 CEL-007 - Cell (derives_from)
- ELE-008 ELE-008 - Electrical (derives_from)
- MEC-002 MEC-002 - Mechanical (derives_from)
- MEC-004 MEC-004 - Mechanical (derives_from)
- MEC-005 MEC-005 - Mechanical (derives_from)
- MEC-008 MEC-008 - Mechanical (derives_from)
- MEC-009 MEC-009 - Mechanical (derives_from)
The pack shall comply with an approved system operating envelope.
Operating envelope table approved and full boundary-condition test coverage assigned.
Review
System
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
Every completed system test shall identify the tested hardware and firmware revisions.
Test artifacts contain immutable HW rev, FW hash, instrument calibration, date.
Inspection
System
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
Each cell shall be traceable to an approved manufacturer and part number.
Serial/lot, source datasheet and supplier documented for every prototype cell.
Inspection
Component
V1-12V
Must
Unassigned
Engineering target - proposed
HZ-003
Not Run
The selected cell shall provide at least 20 Ah nominal capacity under its specified conditions.
Manufacturer spec confirmed and capacity acceptance test method approved.
Test
Component
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
The design shall prevent cell operation outside supplier charge temperature limits.
Boundary test inhibits charge as required by frozen cell specification.
Test
Component
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
The design shall prevent cell operation outside supplier discharge temperature limits.
Boundary test inhibits discharge as required by frozen cell specification.
Test
Component
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
Cell model parameters shall identify manufacturer, chemistry, revision and test conditions.
Model dataset contains provenance and temperature/current metadata.
Inspection
Component
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
Cell selection shall include a defined matching and incoming quality procedure.
Incoming inspection evaluates approved capacity, resistance and visual criteria.
Test
Component
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
Cell compression and orientation shall conform to supplier mechanical limits.
Approved fixture and compression specification reviewed against supplier data.
Inspection
Component
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
The system shall measure every series-cell voltage independently.
Four channels mapped and calibrated against reference instrument.
Test
Subsystem
V1-12V
Must
Unassigned
Engineering target - proposed
TR-002
HZ-001
Not Run
Cell voltage measurement error shall remain within the approved error budget.
Measured worst-case absolute error <= frozen sensing accuracy budget.
Test
Subsystem
V1-12V
Must
Unassigned
Engineering target - proposed
TR-003
Not Run
Pack current shall be measured in both charge and discharge directions.
Calibrated positive and negative currents within approved sensing error budget.
Test
Subsystem
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
The system shall detect an open cell-sense lead or enter a defined safe state.
Each applicable sense-lead disconnect produces mapped fault/safe state.
Test
Subsystem
V1-12V
Must
Unassigned
Engineering target - proposed
TR-006
HZ-008
Not Run
Protection switches shall withstand approved continuous, pulse and fault operating cases.
Thermal, SOA and transient calculations signed off; representative tests pass.
Analysis
Subsystem
V1-12V
Must
Unassigned
Engineering target - proposed
HZ-007
Not Run
The battery shall have a fuse coordinated with conductor and fault energy limits.
Fuse I²t, expected prospective short current and conductor limits reviewed.
Analysis
Subsystem
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
Diagnostic connector pinout shall be keyed and defined.
ICD and physical inspection show no ambiguous voltage/polarity connections.
Inspection
Subsystem
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
PCB creepage, clearance and trace geometry shall meet the approved design rules.
Automated DRC zero blockers; independent safety spacing review passed.
Inspection
Subsystem
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
The BMS shall support a documented balancing strategy.
Balancing activation, inhibition, current and thermal budget tested.
Test
Subsystem
V1-12V
Must
Unassigned
Engineering target - proposed
TR-011
Not Run
Battery positive and negative polarity shall be unambiguous at external terminals.
Drawing, labels and as-built inspection agree.
Inspection
Subsystem
V1-12V
Must
Unassigned
Engineering target - proposed
HZ-004
Not Run
BMS power consumption shall remain within an approved storage and standby budget.
Measured operating/sleep current versus frozen current budget.
Test
Subsystem
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
The firmware shall implement explicit INIT, IDLE, CHARGE, DISCHARGE, FAULT and SLEEP states.
All allowed and forbidden transitions covered by automated state table tests.
Test
Software
V1-12V
Must
Unassigned
Engineering target - proposed
TR-008
Not Run
The firmware shall not override autonomous hardware protection to enable unsafe current.
Fault injection demonstrates external commands cannot bypass hardware protection.
Test
Software
V1-12V
Must
Unassigned
Engineering target - proposed
TR-009
HZ-012
Not Run
The firmware shall acquire and validate per-cell voltage samples.
Unit tests cover scaling, range checking, invalid data and stale samples.
Test
Software
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
The firmware shall maintain a signed coulomb-counting current integral.
Synthetic charge/discharge traces reproduce expected integrated Ah within numerical tolerance.
Test
Software
V1-12V
Must
Unassigned
Engineering target - proposed
TR-010
Not Run
The firmware shall expose versioned diagnostic telemetry.
Protocol tests validate schema, units, timestamps and version negotiation.
Test
Software
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
The firmware shall inhibit balancing under disallowed thermal/electrical states.
State-based tests cover all balancing inhibit conditions.
Test
Software
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
The firmware shall retain a fault cause across a reset when specified by fault policy.
Reset/power-cycle test demonstrates event persists until authorized clearing.
Test
Software
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
The firmware shall detect stalled critical tasks through watchdog supervision.
Injected task stall leads to defined fail-safe outcome.
Test
Software
V1-12V
Must
Unassigned
Engineering target - proposed
HZ-012
Not Run
The firmware shall reject malformed or unauthorized configuration commands.
Protocol negative and authorization tests reject invalid writes.
Test
Software
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
Every firmware release shall retain build provenance and checksum.
Rebuild from pinned inputs reproduces version metadata and artifact hash policy.
Inspection
Software
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
The firmware shall detect stale or invalid temperature data.
Loss/stuck-sensor simulated; safe-state policy passes all defined cases.
Test
Software
V1-12V
Must
Unassigned
Engineering target - proposed
HZ-006
Not Run
The firmware shall support a controlled calibration data procedure.
Calibration revision and CRC verified; corrupt configuration rejected.
Test
Software
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
The pack shall secure four cells in the declared CAD orientation.
Assembly fit-check agrees with released drawing and stack tolerances.
Inspection
Subsystem
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
Cell restraints shall comply with the manufacturer compression limits.
Worst-case tolerance and clamping force verified against supplier envelope.
Analysis
Subsystem
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
Electrical insulation shall prevent accidental busbar-enclosure contact in all specified tolerances.
CAD clearance check and physical inspection against frozen spacing standard.
Inspection
Subsystem
V1-12V
Must
Unassigned
Engineering target - proposed
HZ-003
Not Run
The enclosure shall withstand the approved static mounting loads.
FEA and representative physical fixture test meet displacement/stress criteria.
Test
Subsystem
V1-12V
Must
Unassigned
Engineering target - proposed
HZ-010
Not Run
The mounting design shall avoid unacceptable resonances in the operational vibration profile.
Modal test correlated to model; resonant response compared to approved limits.
Test
Subsystem
V1-12V
Must
Unassigned
Engineering target - proposed
TR-013
HZ-009, HZ-010
Not Run
Busbar fastening shall use controlled fastener and torque specifications.
Assembly inspection documents torque procedure, washer and locking approach.
Inspection
Subsystem
V1-12V
Must
Unassigned
Engineering target - proposed
TR-014
HZ-009
Not Run
Serviceable components shall be accessible without disturbing cell terminals unintentionally.
Service procedure dry-run demonstrates defined replacement and isolation sequence.
Demo
System
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
Mechanical BOM mass shall match CAD estimate within the approved discrepancy limit.
As-built pack mass reconciled to CAD/material mass budget.
Test
System
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
Critical dimensions and tolerances shall be present in manufacturing drawings.
Drawing review verifies dimensions, datum strategy, tolerances and revision labels.
Inspection
Subsystem
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
The thermal model shall represent resistive losses in cells and power path.
Energy balance and I²R term unit tests pass.
Analysis
Model
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
The thermal model shall represent ambient convection and thermal contact paths.
Parameters and boundary conditions documented with units and sources.
Inspection
Model
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
Thermal response shall be estimated for nominal load and agreed duty cycle.
Transient prediction and assumptions exported for each approved scenario.
Analysis
Model
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
The hottest measured cell location shall be included in a validation plan.
Thermocouple map identifies expected hotspot and representative measurements.
Inspection
System
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
Thermal simulation accuracy shall be assessed against measured pack temperatures.
Correlation error and uncertainty reported across >= 3 agreed load profiles.
Test
System
V1-12V
Must
Unassigned
Engineering target - proposed
TR-012
HZ-011
Not Run
The BMS shall block charging outside the permitted cell thermal range.
Boundary fault test shows expected cutoff and recovery behavior.
Test
System
V1-12V
Must
Unassigned
Engineering target - proposed
HZ-006
Not Run
The BMS shall block discharge outside the permitted cell thermal range.
Boundary fault test shows expected cutoff and recovery behavior.
Test
System
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
Cell balancing heat shall be represented in BMS thermal budget.
Worst-case balancing condition analysed and design review approved.
Analysis
Subsystem
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
The master model shall generate the declared pack geometry from controlled parameters.
Regenerate 4S nominal variant without manual topology repair.
Demo
Model
V1-12V
Must
Unassigned
Engineering target - proposed
TR-015
Not Run
The CAD generator shall support independent series count and cell dimensions within permitted families.
Parameterized 4S/8S/16S geometries generated; invalid combinations rejected.
Test
Model
V1-12V
Must
Unassigned
Engineering target - proposed
TR-016
Not Run
Each CAD cell shall reference an approved part geometry and tolerance set.
Part ID and dimensions match supplier drawing and imported material record.
Inspection
Model
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
The CAD assembly shall include terminals, busbars, BMS board, restraints and enclosure.
Released exploded assembly lists every defined subassembly.
Inspection
Model
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
CAD part quantities shall be reconciled with the engineering BOM.
All released CAD component IDs map to counted BOM positions.
Test
Model
V1-12V
Must
Unassigned
Engineering target - proposed
TR-017
Not Run
The build pipeline shall publish a browser-inspectable 3D derivative.
GLB/glTF derivative opens in target browsers with part IDs and units intact.
Test
Platform
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
CAD outputs shall identify generator version and input parameter revision.
Manifest links source file, hash, parameter set and derived file hash.
Inspection
Platform
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
CAD automation shall detect electrical/physical clearance rule violations.
Synthetic interference test produces blocked release and exception record.
Test
Model
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
The digital twin shall expose a 4-cell electrical equivalent-circuit model.
Model responds deterministically to frozen input scenario with baseline output.
Test
Model
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
Each model run shall record parameter set, solver version and boundary conditions.
100% sampled runs reproduce metadata manifest and result hashes.
Inspection
Model
V1-12V
Must
Unassigned
Engineering target - proposed
HZ-011
Not Run
The simulator shall distinguish model predictions from measured test data.
UI and exported report mark data origin at sample and series level.
Test
Platform
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
The pack model shall report voltage, current, SOC, power and accumulated energy.
Numerical conservation/reference checks and display unit tests pass.
Test
Model
V1-12V
Must
Unassigned
Engineering target - proposed
TR-018
Not Run
The pack model shall evaluate per-cell imbalance.
Unbalanced cell synthetic case generates distinct cell states and alerts.
Test
Model
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
The simulation pipeline shall support parameter calibration without overwriting original measurement data.
Calibrated model version and input dataset hashes recorded separately.
Inspection
Model
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
The structural model shall support eigenfrequency/modal analysis.
Solver exports frequencies and modes with mesh, materials, constraints manifest.
Demo
Model
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
The structural solver shall support mesh convergence assessment.
At least three controlled mesh densities compared for critical response.
Analysis
Model
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
Interactive simulation shall return a useful lightweight response within the target UI budget.
95th percentile local scenario calculation <2 seconds on target test workstation.
Test
Platform
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
Invalid model parameters shall be rejected before execution.
Schema/physics guards reject negative resistance, zero mass, bad series count.
Test
Platform
V1-12V
Must
Unassigned
Engineering target - proposed
TR-019
Not Run
Authorized users shall access released projects through modern browsers.
Desktop and mobile browser acceptance matrix passes.
Test
Platform
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
Project access shall require authenticated identity and role authorization.
Negative tests deny unauthenticated and cross-project access.
Test
Platform
V1-12V
Must
Unassigned
Engineering target - proposed
TR-020
Not Run
Large CAD and simulation artifacts shall be stored in Google Cloud Storage.
Artifact upload/download integrity hash matches and metadata indexed.
Test
Platform
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
Requirement documents shall be managed as Git-versioned text sources.
A change is traceable to commit, author, diff and review decision.
Inspection
Platform
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
The UI shall display read-only released CAD model derivatives.
Released revision loads and independent user cannot mutate master CAD.
Test
Platform
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
Each simulation result shall reference immutable input and executable versions.
Run manifest contains source commit, params checksum, solver version.
Inspection
Platform
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
Long simulation jobs shall execute outside synchronous web requests.
Job survives browser disconnect; status and result remain retrievable.
Test
Platform
V1-12V
Must
Unassigned
Engineering target - proposed
TR-021
Not Run
Cloud storage objects shall be recoverable under the approved backup policy.
Documented restore drill recovers deliberately removed test dataset.
Test
Platform
V1-12V
Must
Unassigned
Engineering target - proposed
TR-022
HZ-015
Not Run
Remote application secrets shall not be embedded in downloaded browser assets.
Security review and secret scanning identify no exposed credentials.
Inspection
Platform
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
The system shall maintain immutable release manifests.
Release includes refs/hashes for requirements, PCB, CAD, FW, BOM, test evidence.
Test
Platform
V1-12V
Must
Unassigned
Engineering target - proposed
TR-024
HZ-015
Not Run
The UI shall link each failed test to its governing requirement.
Select failed test and navigate to matching requirement ID and commit.
Demo
Platform
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
The platform shall refuse hazardous remote physical-bench actuation without local enable.
Authorization negative test and physical local interlock demonstration pass.
Test
Platform
V1-12V
Must
Unassigned
Engineering target - proposed
TR-023
HZ-013
Not Run
The platform shall preserve source measurements separately from derived simulation results.
Original datasets content-addressed; transformations separately versioned.
Inspection
Platform
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
Users shall see run state, errors, and diagnostic references for failed jobs.
Forced solver failure yields log link, failure code, and no false 'passed' state.
Test
Platform
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
Every approved engineering requirement shall have a verification method and acceptance criterion.
No approved requirements have blank method, criterion, or verification ID.
Inspection
Process
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
Safety-critical requirements shall have a hazard link and review approval.
100% safety-tagged requirements linked to at least one risk or safety rationale.
Inspection
Process
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
Test cases shall identify setup, stimuli, expected result, actual result and artifacts.
Sample tests contain all fields and independent rerun possible.
Inspection
Process
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
Verification results shall distinguish Passed, Failed, Blocked and Not Run.
Report schema validation rejects ambiguous status labels.
Test
Process
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
The system shall prohibit release on unresolved critical verification failures.
Synthetic critical failure blocks release gate automatically.
Test
Process
V1-12V
Must
Unassigned
Engineering target - proposed
TR-025
Not Run
Test equipment shall be linked to calibration status and uncertainty.
Each measurement-based test has instrument ID, calibration date, uncertainty.
Inspection
Process
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
Requirement changes after baseline shall trigger impact analysis.
Diff lists affected architecture elements, CAD, PCB, FW and test IDs.
Demo
Process
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
System validation shall be distinguished from specification verification.
V&V plan provides separate user-need acceptance and compliance evidence.
Review
Process
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
Fault injection shall never energize an unguarded hazardous battery bench remotely.
Interlock validation rejects remote command in unsafe configuration.
Test
Process
V1-12V
Must
Unassigned
Engineering target - proposed
HZ-013
Not Run
Regression suites shall run on every controlled software change.
CI report records pass/fail, commit and test count for each merge.
Test
Process
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
Every approved purchasable part shall have a unique ID and revision.
100% released parts have part numbers, approved footprint or spec and revision.
Inspection
Process
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
The BOM shall separate cell, BMS, enclosure, harness and assembly cost.
Cost rollup correctly sums subassembly and unit totals.
Test
Process
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
Unit cost shall be calculated at prototype, 100 and 10000-unit quantities.
Cost rollup produces price breaks with quote dates and currency.
Test
Process
V1-12V
Must
Unassigned
Engineering target - proposed
TR-026
Not Run
Approved alternates shall preserve form-fit-function and qualification evidence.
Replacement cannot be marked approved without referenced validation.
Inspection
Process
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
The platform shall flag obsolete or single-source critical parts.
Artificial supplier change triggers lifecycle risk flag.
Test
Platform
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
The system shall calculate estimated landed cost using separated assumptions.
Formula validation covers price, scrap, assembly, freight and test yield.
Test
Platform
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
Any BOM cost comparison shall identify assumptions and quote validity.
100% review samples show quote date and currency normalization.
Inspection
Process
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
The pack shall have a defined assembly process with controlled order of operations.
Approved work instructions identify each critical step and hazard.
Inspection
Process
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
Pack terminal, fuse and busbar assembly shall have prescribed inspection checks.
EOL checklist verifies polarity, continuity and fastener records.
Test
System
V1-12V
Must
Unassigned
Engineering target - proposed
HZ-004
Not Run
Each assembled pack shall carry serial and test result identity.
Physical label resolves to build record, lot, FW and test data.
Test
System
V1-12V
Must
Unassigned
Engineering target - proposed
TR-027
Not Run
The project shall calculate yield-adjusted production BOM cost.
Production estimate formula tests pass for multiple scrap/yield inputs.
Test
Process
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
Release documents shall include safe shipping and handling requirements.
Reviewed handling procedure and applicable transport compliance matrix exist.
Inspection
Process
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
Firmware programming and configuration shall be logged during end-of-line test.
EOL record captures image hash, settings CRC and measured calibration data.
Test
System
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
The family architecture shall separate hardware-dependent protection from portable firmware logic.
Design review identifies abstraction interfaces and variant-specific drivers.
Inspection
Architecture
V2+
Must
Unassigned
Engineering target - proposed
Not Run
The platform shall reject designs where maximum pack voltage exceeds rated components.
Static rule uses cell upper limit * series count against rated design envelope.
Test
Platform
V2+
Must
Unassigned
Engineering target - proposed
HZ-014
Not Run
The 8S variant shall receive its own sensing and power protection review.
8S architecture sign-off includes sensor, FET, charger, thermal and fuse design.
Review
Architecture
V2+
Must
Unassigned
Engineering target - proposed
Not Run
The 16S variant shall receive separate voltage/clearance and protection validation.
16S revision has independent electrical and mechanical verification plan.
Review
Architecture
V3+
Must
Unassigned
Engineering target - proposed
Not Run
The 72 V-class variant shall define nominal and absolute maximum voltage explicitly.
System datasheet declares chemistry, series count and maximum charged voltage.
Inspection
Architecture
V4+
Must
Unassigned
Engineering target - proposed
HZ-014
Not Run
Higher-voltage variants shall be assessed for isolation and precharge requirements.
Hazard/architecture review documents whether isolation and precharge are needed.
Analysis
Architecture
V4+
Must
Unassigned
Engineering target - proposed
Not Run
Variants shall reuse requirement/test templates only after applicability review.
Each inherited requirement lists applicable variants and any revised criterion.
Inspection
Process
V2+
Must
Unassigned
Engineering target - proposed
Not Run
Series-connected modules shall be validated as one coordinated pack protection system.
System fault model reviews worst-case module trip, imbalance, and unintended reclose.
Analysis
System
V4+
Must
Unassigned
Engineering target - proposed
Not Run