The product shall provide a replaceable 12.8 V nominal rechargeable energy source.

  • SYS-001
    11. SYS-001 - System SYS-001

    The V1 pack shall contain four LFP cells connected in series.

    • CEL-001
      21. CEL-001 - Cell CEL-001

      Each cell shall be traceable to an approved manufacturer and part number.

    • CEL-002
      22. CEL-002 - Cell CEL-002

      The selected cell shall provide at least 20 Ah nominal capacity under its specified conditions.

    • CEL-005
      25. CEL-005 - Cell CEL-005

      Cell model parameters shall identify manufacturer, chemistry, revision and test conditions.

    • CEL-006
      26. CEL-006 - Cell CEL-006

      Cell selection shall include a defined matching and incoming quality procedure.

    • MEC-001
      51. MEC-001 - Mechanical MEC-001

      The pack shall secure four cells in the declared CAD orientation.

    • CAD-003
      70. CAD-003 - CAD CAD-003

      Each CAD cell shall reference an approved part geometry and tolerance set.

  • SYS-002
    12. SYS-002 - System SYS-002

    The V1 reference energy shall be 256 Wh nominal.

    • ELE-010
      37. ELE-010 - Electrical ELE-010

      Battery positive and negative polarity shall be unambiguous at external terminals.

      • CAD-004
        71. CAD-004 - CAD CAD-004

        The CAD assembly shall include terminals, busbars, BMS board, restraints and enclosure.

STK-002
2. STK-002 - Stakeholder STK-002

The product shall support an agreed load and charger envelope.

  • SYS-003
    13. SYS-003 - System SYS-003

    The V1 pack shall support 20 A continuous discharge at the specified ambient and SOC.

    • THM-001
      60. THM-001 - Thermal THM-001

      The thermal model shall represent resistive losses in cells and power path.

    • THM-002
      61. THM-002 - Thermal THM-002

      The thermal model shall represent ambient convection and thermal contact paths.

    • THM-003
      62. THM-003 - Thermal THM-003

      Thermal response shall be estimated for nominal load and agreed duty cycle.

    • THM-004
      63. THM-004 - Thermal THM-004

      The hottest measured cell location shall be included in a validation plan.

    • THM-005
      64. THM-005 - Thermal THM-005

      Thermal simulation accuracy shall be assessed against measured pack temperatures.

      • SIM-006
        81. SIM-006 - Simulation SIM-006

        The simulation pipeline shall support parameter calibration without overwriting original measurement data.

  • SYS-004
    14. SYS-004 - System SYS-004

    The V1 pack shall support 10 A charging where the cell supplier permits.

  • SYS-008
    18. SYS-008 - System SYS-008

    The pack shall expose a defined service interface for diagnostics.

    • ELE-007
      34. ELE-007 - Electrical ELE-007

      Diagnostic connector pinout shall be keyed and defined.

    • FW-005
      43. FW-005 - Firmware FW-005

      The firmware shall expose versioned diagnostic telemetry.

    • FW-009
      47. FW-009 - Firmware FW-009

      The firmware shall reject malformed or unauthorized configuration commands.

    • FW-012
      50. FW-012 - Firmware FW-012

      The firmware shall support a controlled calibration data procedure.

STK-003
3. STK-003 - Stakeholder STK-003

The product shall prevent hazardous electrical and thermal operating states.

  • SYS-005
    15. SYS-005 - System SYS-005

    The pack shall interrupt charge/discharge according to the approved protection state table.

    • ELE-001
      28. ELE-001 - Electrical ELE-001

      The system shall measure every series-cell voltage independently.

      • FW-003
        41. FW-003 - Firmware FW-003

        The firmware shall acquire and validate per-cell voltage samples.

    • ELE-002
      29. ELE-002 - Electrical ELE-002

      Cell voltage measurement error shall remain within the approved error budget.

    • ELE-003
      30. ELE-003 - Electrical ELE-003

      Pack current shall be measured in both charge and discharge directions.

      • FW-004
        42. FW-004 - Firmware FW-004

        The firmware shall maintain a signed coulomb-counting current integral.

    • ELE-004
      31. ELE-004 - Electrical ELE-004

      The system shall detect an open cell-sense lead or enter a defined safe state.

    • ELE-009
      36. ELE-009 - Electrical ELE-009

      The BMS shall support a documented balancing strategy.

      • FW-006
        44. FW-006 - Firmware FW-006

        The firmware shall inhibit balancing under disallowed thermal/electrical states.

      • THM-008
        67. THM-008 - Thermal THM-008

        Cell balancing heat shall be represented in BMS thermal budget.

    • ELE-011
      38. ELE-011 - Electrical ELE-011

      BMS power consumption shall remain within an approved storage and standby budget.

    • FW-001
      39. FW-001 - Firmware FW-001

      The firmware shall implement explicit INIT, IDLE, CHARGE, DISCHARGE, FAULT and SLEEP states.

    • FW-002
      40. FW-002 - Firmware FW-002

      The firmware shall not override autonomous hardware protection to enable unsafe current.

    • FW-007
      45. FW-007 - Firmware FW-007

      The firmware shall retain a fault cause across a reset when specified by fault policy.

    • FW-008
      46. FW-008 - Firmware FW-008

      The firmware shall detect stalled critical tasks through watchdog supervision.

    • FW-011
      49. FW-011 - Firmware FW-011

      The firmware shall detect stale or invalid temperature data.

    • THM-006
      65. THM-006 - Thermal THM-006

      The BMS shall block charging outside the permitted cell thermal range.

    • THM-007
      66. THM-007 - Thermal THM-007

      The BMS shall block discharge outside the permitted cell thermal range.

  • SYS-006
    16. SYS-006 - System SYS-006

    Pack overcurrent/short-circuit protection shall not depend on a cloud connection.

  • SYS-007
    17. SYS-007 - System SYS-007

    The pack shall incorporate a coordinated fuse and electronic protection concept.

    • ELE-005
      32. ELE-005 - Electrical ELE-005

      Protection switches shall withstand approved continuous, pulse and fault operating cases.

    • ELE-006
      33. ELE-006 - Electrical ELE-006

      The battery shall have a fuse coordinated with conductor and fault energy limits.

    • MEC-003
      53. MEC-003 - Mechanical MEC-003

      Electrical insulation shall prevent accidental busbar-enclosure contact in all specified tolerances.

      • CAD-008
        75. CAD-008 - CAD CAD-008

        CAD automation shall detect electrical/physical clearance rule violations.

    • MEC-006
      56. MEC-006 - Mechanical MEC-006

      Busbar fastening shall use controlled fastener and torque specifications.

    • MFG-002
      118. MFG-002 - Manufacturing MFG-002

      Pack terminal, fuse and busbar assembly shall have prescribed inspection checks.

  • MFG-005
    121. MFG-005 - Manufacturing MFG-005

    Release documents shall include safe shipping and handling requirements.

STK-004
4. STK-004 - Stakeholder STK-004

The engineering platform shall allow remote access to released engineering designs.

  • CAD-006
    73. CAD-006 - CAD CAD-006

    The build pipeline shall publish a browser-inspectable 3D derivative.

  • SIM-009
    84. SIM-009 - Simulation SIM-009

    Interactive simulation shall return a useful lightweight response within the target UI budget.

  • PLT-001
    86. PLT-001 - Platform PLT-001

    Authorized users shall access released projects through modern browsers.

  • PLT-002
    87. PLT-002 - Platform PLT-002

    Project access shall require authenticated identity and role authorization.

  • PLT-003
    88. PLT-003 - Platform PLT-003

    Large CAD and simulation artifacts shall be stored in Google Cloud Storage.

  • PLT-005
    90. PLT-005 - Platform PLT-005

    The UI shall display read-only released CAD model derivatives.

  • PLT-007
    92. PLT-007 - Platform PLT-007

    Long simulation jobs shall execute outside synchronous web requests.

  • PLT-008
    93. PLT-008 - Platform PLT-008

    Cloud storage objects shall be recoverable under the approved backup policy.

  • PLT-009
    94. PLT-009 - Platform PLT-009

    Remote application secrets shall not be embedded in downloaded browser assets.

  • PLT-012
    97. PLT-012 - Platform PLT-012

    The platform shall refuse hazardous remote physical-bench actuation without local enable.

  • PLT-014
    99. PLT-014 - Platform PLT-014

    Users shall see run state, errors, and diagnostic references for failed jobs.

STK-005
5. STK-005 - Stakeholder STK-005

The platform shall trace design decisions to requirements and verification evidence.

  • SYS-010
    20. SYS-010 - System SYS-010

    Every completed system test shall identify the tested hardware and firmware revisions.

  • FW-010
    48. FW-010 - Firmware FW-010

    Every firmware release shall retain build provenance and checksum.

  • CAD-001
    68. CAD-001 - CAD CAD-001

    The master model shall generate the declared pack geometry from controlled parameters.

  • CAD-007
    74. CAD-007 - CAD CAD-007

    CAD outputs shall identify generator version and input parameter revision.

  • SIM-001
    76. SIM-001 - Simulation SIM-001

    The digital twin shall expose a 4-cell electrical equivalent-circuit model.

  • SIM-002
    77. SIM-002 - Simulation SIM-002

    Each model run shall record parameter set, solver version and boundary conditions.

  • SIM-003
    78. SIM-003 - Simulation SIM-003

    The simulator shall distinguish model predictions from measured test data.

  • SIM-004
    79. SIM-004 - Simulation SIM-004

    The pack model shall report voltage, current, SOC, power and accumulated energy.

  • SIM-005
    80. SIM-005 - Simulation SIM-005

    The pack model shall evaluate per-cell imbalance.

  • SIM-010
    85. SIM-010 - Simulation SIM-010

    Invalid model parameters shall be rejected before execution.

  • PLT-004
    89. PLT-004 - Platform PLT-004

    Requirement documents shall be managed as Git-versioned text sources.

  • PLT-006
    91. PLT-006 - Platform PLT-006

    Each simulation result shall reference immutable input and executable versions.

  • PLT-010
    95. PLT-010 - Platform PLT-010

    The system shall maintain immutable release manifests.

  • PLT-011
    96. PLT-011 - Platform PLT-011

    The UI shall link each failed test to its governing requirement.

  • PLT-013
    98. PLT-013 - Platform PLT-013

    The platform shall preserve source measurements separately from derived simulation results.

  • VER-001
    100. VER-001 - Verification VER-001

    Every approved engineering requirement shall have a verification method and acceptance criterion.

  • VER-002
    101. VER-002 - Verification VER-002

    Safety-critical requirements shall have a hazard link and review approval.

  • VER-003
    102. VER-003 - Verification VER-003

    Test cases shall identify setup, stimuli, expected result, actual result and artifacts.

  • VER-004
    103. VER-004 - Verification VER-004

    Verification results shall distinguish Passed, Failed, Blocked and Not Run.

  • VER-005
    104. VER-005 - Verification VER-005

    The system shall prohibit release on unresolved critical verification failures.

  • VER-006
    105. VER-006 - Verification VER-006

    Test equipment shall be linked to calibration status and uncertainty.

  • VER-007
    106. VER-007 - Verification VER-007

    Requirement changes after baseline shall trigger impact analysis.

  • VER-008
    107. VER-008 - Verification VER-008

    System validation shall be distinguished from specification verification.

  • VER-009
    108. VER-009 - Verification VER-009

    Fault injection shall never energize an unguarded hazardous battery bench remotely.

  • VER-010
    109. VER-010 - Verification VER-010

    Regression suites shall run on every controlled software change.

  • MFG-003
    119. MFG-003 - Manufacturing MFG-003

    Each assembled pack shall carry serial and test result identity.

  • MFG-006
    122. MFG-006 - Manufacturing MFG-006

    Firmware programming and configuration shall be logged during end-of-line test.

STK-006
6. STK-006 - Stakeholder STK-006

The project shall maintain a costed production BOM and approved alternatives.

  • CAD-005
    72. CAD-005 - CAD CAD-005

    CAD part quantities shall be reconciled with the engineering BOM.

  • BOM-001
    110. BOM-001 - BOM BOM-001

    Every approved purchasable part shall have a unique ID and revision.

  • BOM-002
    111. BOM-002 - BOM BOM-002

    The BOM shall separate cell, BMS, enclosure, harness and assembly cost.

  • BOM-003
    112. BOM-003 - BOM BOM-003

    Unit cost shall be calculated at prototype, 100 and 10000-unit quantities.

  • BOM-004
    113. BOM-004 - BOM BOM-004

    Approved alternates shall preserve form-fit-function and qualification evidence.

  • BOM-005
    114. BOM-005 - BOM BOM-005

    The platform shall flag obsolete or single-source critical parts.

  • BOM-006
    115. BOM-006 - BOM BOM-006

    The system shall calculate estimated landed cost using separated assumptions.

  • BOM-007
    116. BOM-007 - BOM BOM-007

    Any BOM cost comparison shall identify assumptions and quote validity.

  • MFG-001
    117. MFG-001 - Manufacturing MFG-001

    The pack shall have a defined assembly process with controlled order of operations.

  • MFG-004
    120. MFG-004 - Manufacturing MFG-004

    The project shall calculate yield-adjusted production BOM cost.

STK-007
7. STK-007 - Stakeholder STK-007

The product family shall support 24 V, 48 V and 72 V-class variants through controlled reuse.

  • CAD-002
    69. CAD-002 - CAD CAD-002

    The CAD generator shall support independent series count and cell dimensions within permitted families.

  • SCL-001
    123. SCL-001 - Scale-up SCL-001

    The family architecture shall separate hardware-dependent protection from portable firmware logic.

  • SCL-002
    124. SCL-002 - Scale-up SCL-002

    The platform shall reject designs where maximum pack voltage exceeds rated components.

  • SCL-003
    125. SCL-003 - Scale-up SCL-003

    The 8S variant shall receive its own sensing and power protection review.

  • SCL-004
    126. SCL-004 - Scale-up SCL-004

    The 16S variant shall receive separate voltage/clearance and protection validation.

  • SCL-005
    127. SCL-005 - Scale-up SCL-005

    The 72 V-class variant shall define nominal and absolute maximum voltage explicitly.

  • SCL-006
    128. SCL-006 - Scale-up SCL-006

    Higher-voltage variants shall be assessed for isolation and precharge requirements.

  • SCL-007
    129. SCL-007 - Scale-up SCL-007

    Variants shall reuse requirement/test templates only after applicability review.

  • SCL-008
    130. SCL-008 - Scale-up SCL-008

    Series-connected modules shall be validated as one coordinated pack protection system.

STK-008
8. STK-008 - Stakeholder STK-008

The product shall be serviceable using documented diagnostics and replaceable assemblies.

  • MEC-007
    57. MEC-007 - Mechanical MEC-007

    Serviceable components shall be accessible without disturbing cell terminals unintentionally.

STK-009
9. STK-009 - Stakeholder STK-009

The product shall meet the environmental and mechanical needs of its intended use.

  • SYS-009
    19. SYS-009 - System SYS-009

    The pack shall comply with an approved system operating envelope.

    • CEL-003
      23. CEL-003 - Cell CEL-003

      The design shall prevent cell operation outside supplier charge temperature limits.

    • CEL-004
      24. CEL-004 - Cell CEL-004

      The design shall prevent cell operation outside supplier discharge temperature limits.

    • CEL-007
      27. CEL-007 - Cell CEL-007

      Cell compression and orientation shall conform to supplier mechanical limits.

    • ELE-008
      35. ELE-008 - Electrical ELE-008

      PCB creepage, clearance and trace geometry shall meet the approved design rules.

    • MEC-002
      52. MEC-002 - Mechanical MEC-002

      Cell restraints shall comply with the manufacturer compression limits.

    • MEC-004
      54. MEC-004 - Mechanical MEC-004

      The enclosure shall withstand the approved static mounting loads.

      • SIM-008
        83. SIM-008 - Simulation SIM-008

        The structural solver shall support mesh convergence assessment.

    • MEC-005
      55. MEC-005 - Mechanical MEC-005

      The mounting design shall avoid unacceptable resonances in the operational vibration profile.

      • SIM-007
        82. SIM-007 - Simulation SIM-007

        The structural model shall support eigenfrequency/modal analysis.

    • MEC-008
      58. MEC-008 - Mechanical MEC-008

      Mechanical BOM mass shall match CAD estimate within the approved discrepancy limit.

    • MEC-009
      59. MEC-009 - Mechanical MEC-009

      Critical dimensions and tolerances shall be present in manufacturing drawings.

STK-010
10. STK-010 - Stakeholder STK-010

The project shall support independent review and controlled engineering releases.

  • STK-001
    1. STK-001 - Stakeholder STK-001

    The product shall provide a replaceable 12.8 V nominal rechargeable energy source.

SYS-001
11. SYS-001 - System SYS-001

The V1 pack shall contain four LFP cells connected in series.

  • CEL-001
    21. CEL-001 - Cell CEL-001

    Each cell shall be traceable to an approved manufacturer and part number.

  • CEL-002
    22. CEL-002 - Cell CEL-002

    The selected cell shall provide at least 20 Ah nominal capacity under its specified conditions.

  • CEL-005
    25. CEL-005 - Cell CEL-005

    Cell model parameters shall identify manufacturer, chemistry, revision and test conditions.

  • CEL-006
    26. CEL-006 - Cell CEL-006

    Cell selection shall include a defined matching and incoming quality procedure.

  • MEC-001
    51. MEC-001 - Mechanical MEC-001

    The pack shall secure four cells in the declared CAD orientation.

  • CAD-003
    70. CAD-003 - CAD CAD-003

    Each CAD cell shall reference an approved part geometry and tolerance set.

  • STK-001
    1. STK-001 - Stakeholder STK-001

    The product shall provide a replaceable 12.8 V nominal rechargeable energy source.

SYS-002
12. SYS-002 - System SYS-002

The V1 reference energy shall be 256 Wh nominal.

  • ELE-010
    37. ELE-010 - Electrical ELE-010

    Battery positive and negative polarity shall be unambiguous at external terminals.

    • CAD-004
      71. CAD-004 - CAD CAD-004

      The CAD assembly shall include terminals, busbars, BMS board, restraints and enclosure.

  • STK-002
    2. STK-002 - Stakeholder STK-002

    The product shall support an agreed load and charger envelope.

SYS-003
13. SYS-003 - System SYS-003

The V1 pack shall support 20 A continuous discharge at the specified ambient and SOC.

  • THM-001
    60. THM-001 - Thermal THM-001

    The thermal model shall represent resistive losses in cells and power path.

  • THM-002
    61. THM-002 - Thermal THM-002

    The thermal model shall represent ambient convection and thermal contact paths.

  • THM-003
    62. THM-003 - Thermal THM-003

    Thermal response shall be estimated for nominal load and agreed duty cycle.

  • THM-004
    63. THM-004 - Thermal THM-004

    The hottest measured cell location shall be included in a validation plan.

  • THM-005
    64. THM-005 - Thermal THM-005

    Thermal simulation accuracy shall be assessed against measured pack temperatures.

    • SIM-006
      81. SIM-006 - Simulation SIM-006

      The simulation pipeline shall support parameter calibration without overwriting original measurement data.

  • STK-002
    2. STK-002 - Stakeholder STK-002

    The product shall support an agreed load and charger envelope.

SYS-004
14. SYS-004 - System SYS-004

The V1 pack shall support 10 A charging where the cell supplier permits.

  • STK-003
    3. STK-003 - Stakeholder STK-003

    The product shall prevent hazardous electrical and thermal operating states.

SYS-005
15. SYS-005 - System SYS-005

The pack shall interrupt charge/discharge according to the approved protection state table.

  • ELE-001
    28. ELE-001 - Electrical ELE-001

    The system shall measure every series-cell voltage independently.

    • FW-003
      41. FW-003 - Firmware FW-003

      The firmware shall acquire and validate per-cell voltage samples.

  • ELE-002
    29. ELE-002 - Electrical ELE-002

    Cell voltage measurement error shall remain within the approved error budget.

  • ELE-003
    30. ELE-003 - Electrical ELE-003

    Pack current shall be measured in both charge and discharge directions.

    • FW-004
      42. FW-004 - Firmware FW-004

      The firmware shall maintain a signed coulomb-counting current integral.

  • ELE-004
    31. ELE-004 - Electrical ELE-004

    The system shall detect an open cell-sense lead or enter a defined safe state.

  • ELE-009
    36. ELE-009 - Electrical ELE-009

    The BMS shall support a documented balancing strategy.

    • FW-006
      44. FW-006 - Firmware FW-006

      The firmware shall inhibit balancing under disallowed thermal/electrical states.

    • THM-008
      67. THM-008 - Thermal THM-008

      Cell balancing heat shall be represented in BMS thermal budget.

  • ELE-011
    38. ELE-011 - Electrical ELE-011

    BMS power consumption shall remain within an approved storage and standby budget.

  • FW-001
    39. FW-001 - Firmware FW-001

    The firmware shall implement explicit INIT, IDLE, CHARGE, DISCHARGE, FAULT and SLEEP states.

  • FW-002
    40. FW-002 - Firmware FW-002

    The firmware shall not override autonomous hardware protection to enable unsafe current.

  • FW-007
    45. FW-007 - Firmware FW-007

    The firmware shall retain a fault cause across a reset when specified by fault policy.

  • FW-008
    46. FW-008 - Firmware FW-008

    The firmware shall detect stalled critical tasks through watchdog supervision.

  • FW-011
    49. FW-011 - Firmware FW-011

    The firmware shall detect stale or invalid temperature data.

  • THM-006
    65. THM-006 - Thermal THM-006

    The BMS shall block charging outside the permitted cell thermal range.

  • THM-007
    66. THM-007 - Thermal THM-007

    The BMS shall block discharge outside the permitted cell thermal range.

  • STK-003
    3. STK-003 - Stakeholder STK-003

    The product shall prevent hazardous electrical and thermal operating states.

SYS-006
16. SYS-006 - System SYS-006

Pack overcurrent/short-circuit protection shall not depend on a cloud connection.

  • STK-003
    3. STK-003 - Stakeholder STK-003

    The product shall prevent hazardous electrical and thermal operating states.

SYS-007
17. SYS-007 - System SYS-007

The pack shall incorporate a coordinated fuse and electronic protection concept.

  • ELE-005
    32. ELE-005 - Electrical ELE-005

    Protection switches shall withstand approved continuous, pulse and fault operating cases.

  • ELE-006
    33. ELE-006 - Electrical ELE-006

    The battery shall have a fuse coordinated with conductor and fault energy limits.

  • MEC-003
    53. MEC-003 - Mechanical MEC-003

    Electrical insulation shall prevent accidental busbar-enclosure contact in all specified tolerances.

    • CAD-008
      75. CAD-008 - CAD CAD-008

      CAD automation shall detect electrical/physical clearance rule violations.

  • MEC-006
    56. MEC-006 - Mechanical MEC-006

    Busbar fastening shall use controlled fastener and torque specifications.

  • MFG-002
    118. MFG-002 - Manufacturing MFG-002

    Pack terminal, fuse and busbar assembly shall have prescribed inspection checks.

  • STK-002
    2. STK-002 - Stakeholder STK-002

    The product shall support an agreed load and charger envelope.

SYS-008
18. SYS-008 - System SYS-008

The pack shall expose a defined service interface for diagnostics.

  • ELE-007
    34. ELE-007 - Electrical ELE-007

    Diagnostic connector pinout shall be keyed and defined.

  • FW-005
    43. FW-005 - Firmware FW-005

    The firmware shall expose versioned diagnostic telemetry.

  • FW-009
    47. FW-009 - Firmware FW-009

    The firmware shall reject malformed or unauthorized configuration commands.

  • FW-012
    50. FW-012 - Firmware FW-012

    The firmware shall support a controlled calibration data procedure.

  • STK-009
    9. STK-009 - Stakeholder STK-009

    The product shall meet the environmental and mechanical needs of its intended use.

SYS-009
19. SYS-009 - System SYS-009

The pack shall comply with an approved system operating envelope.

  • CEL-003
    23. CEL-003 - Cell CEL-003

    The design shall prevent cell operation outside supplier charge temperature limits.

  • CEL-004
    24. CEL-004 - Cell CEL-004

    The design shall prevent cell operation outside supplier discharge temperature limits.

  • CEL-007
    27. CEL-007 - Cell CEL-007

    Cell compression and orientation shall conform to supplier mechanical limits.

  • ELE-008
    35. ELE-008 - Electrical ELE-008

    PCB creepage, clearance and trace geometry shall meet the approved design rules.

  • MEC-002
    52. MEC-002 - Mechanical MEC-002

    Cell restraints shall comply with the manufacturer compression limits.

  • MEC-004
    54. MEC-004 - Mechanical MEC-004

    The enclosure shall withstand the approved static mounting loads.

    • SIM-008
      83. SIM-008 - Simulation SIM-008

      The structural solver shall support mesh convergence assessment.

  • MEC-005
    55. MEC-005 - Mechanical MEC-005

    The mounting design shall avoid unacceptable resonances in the operational vibration profile.

    • SIM-007
      82. SIM-007 - Simulation SIM-007

      The structural model shall support eigenfrequency/modal analysis.

  • MEC-008
    58. MEC-008 - Mechanical MEC-008

    Mechanical BOM mass shall match CAD estimate within the approved discrepancy limit.

  • MEC-009
    59. MEC-009 - Mechanical MEC-009

    Critical dimensions and tolerances shall be present in manufacturing drawings.

  • STK-005
    5. STK-005 - Stakeholder STK-005

    The platform shall trace design decisions to requirements and verification evidence.

SYS-010
20. SYS-010 - System SYS-010

Every completed system test shall identify the tested hardware and firmware revisions.

  • SYS-001
    11. SYS-001 - System SYS-001

    The V1 pack shall contain four LFP cells connected in series.

    • STK-001
      1. STK-001 - Stakeholder STK-001

      The product shall provide a replaceable 12.8 V nominal rechargeable energy source.

CEL-001
21. CEL-001 - Cell CEL-001

Each cell shall be traceable to an approved manufacturer and part number.

  • SYS-001
    11. SYS-001 - System SYS-001

    The V1 pack shall contain four LFP cells connected in series.

    • STK-001
      1. STK-001 - Stakeholder STK-001

      The product shall provide a replaceable 12.8 V nominal rechargeable energy source.

CEL-002
22. CEL-002 - Cell CEL-002

The selected cell shall provide at least 20 Ah nominal capacity under its specified conditions.

  • SYS-009
    19. SYS-009 - System SYS-009

    The pack shall comply with an approved system operating envelope.

    • STK-009
      9. STK-009 - Stakeholder STK-009

      The product shall meet the environmental and mechanical needs of its intended use.

CEL-003
23. CEL-003 - Cell CEL-003

The design shall prevent cell operation outside supplier charge temperature limits.

  • SYS-009
    19. SYS-009 - System SYS-009

    The pack shall comply with an approved system operating envelope.

    • STK-009
      9. STK-009 - Stakeholder STK-009

      The product shall meet the environmental and mechanical needs of its intended use.

CEL-004
24. CEL-004 - Cell CEL-004

The design shall prevent cell operation outside supplier discharge temperature limits.

  • SYS-001
    11. SYS-001 - System SYS-001

    The V1 pack shall contain four LFP cells connected in series.

    • STK-001
      1. STK-001 - Stakeholder STK-001

      The product shall provide a replaceable 12.8 V nominal rechargeable energy source.

CEL-005
25. CEL-005 - Cell CEL-005

Cell model parameters shall identify manufacturer, chemistry, revision and test conditions.

  • SYS-001
    11. SYS-001 - System SYS-001

    The V1 pack shall contain four LFP cells connected in series.

    • STK-001
      1. STK-001 - Stakeholder STK-001

      The product shall provide a replaceable 12.8 V nominal rechargeable energy source.

CEL-006
26. CEL-006 - Cell CEL-006

Cell selection shall include a defined matching and incoming quality procedure.

  • SYS-009
    19. SYS-009 - System SYS-009

    The pack shall comply with an approved system operating envelope.

    • STK-009
      9. STK-009 - Stakeholder STK-009

      The product shall meet the environmental and mechanical needs of its intended use.

CEL-007
27. CEL-007 - Cell CEL-007

Cell compression and orientation shall conform to supplier mechanical limits.

  • SYS-005
    15. SYS-005 - System SYS-005

    The pack shall interrupt charge/discharge according to the approved protection state table.

    • STK-003
      3. STK-003 - Stakeholder STK-003

      The product shall prevent hazardous electrical and thermal operating states.

ELE-001
28. ELE-001 - Electrical ELE-001

The system shall measure every series-cell voltage independently.

  • FW-003
    41. FW-003 - Firmware FW-003

    The firmware shall acquire and validate per-cell voltage samples.

  • SYS-005
    15. SYS-005 - System SYS-005

    The pack shall interrupt charge/discharge according to the approved protection state table.

    • STK-003
      3. STK-003 - Stakeholder STK-003

      The product shall prevent hazardous electrical and thermal operating states.

ELE-002
29. ELE-002 - Electrical ELE-002

Cell voltage measurement error shall remain within the approved error budget.

  • SYS-005
    15. SYS-005 - System SYS-005

    The pack shall interrupt charge/discharge according to the approved protection state table.

    • STK-003
      3. STK-003 - Stakeholder STK-003

      The product shall prevent hazardous electrical and thermal operating states.

ELE-003
30. ELE-003 - Electrical ELE-003

Pack current shall be measured in both charge and discharge directions.

  • FW-004
    42. FW-004 - Firmware FW-004

    The firmware shall maintain a signed coulomb-counting current integral.

  • SYS-005
    15. SYS-005 - System SYS-005

    The pack shall interrupt charge/discharge according to the approved protection state table.

    • STK-003
      3. STK-003 - Stakeholder STK-003

      The product shall prevent hazardous electrical and thermal operating states.

ELE-004
31. ELE-004 - Electrical ELE-004

The system shall detect an open cell-sense lead or enter a defined safe state.

  • SYS-007
    17. SYS-007 - System SYS-007

    The pack shall incorporate a coordinated fuse and electronic protection concept.

    • STK-003
      3. STK-003 - Stakeholder STK-003

      The product shall prevent hazardous electrical and thermal operating states.

ELE-005
32. ELE-005 - Electrical ELE-005

Protection switches shall withstand approved continuous, pulse and fault operating cases.

  • SYS-007
    17. SYS-007 - System SYS-007

    The pack shall incorporate a coordinated fuse and electronic protection concept.

    • STK-003
      3. STK-003 - Stakeholder STK-003

      The product shall prevent hazardous electrical and thermal operating states.

ELE-006
33. ELE-006 - Electrical ELE-006

The battery shall have a fuse coordinated with conductor and fault energy limits.

  • SYS-008
    18. SYS-008 - System SYS-008

    The pack shall expose a defined service interface for diagnostics.

    • STK-002
      2. STK-002 - Stakeholder STK-002

      The product shall support an agreed load and charger envelope.

ELE-007
34. ELE-007 - Electrical ELE-007

Diagnostic connector pinout shall be keyed and defined.

  • SYS-009
    19. SYS-009 - System SYS-009

    The pack shall comply with an approved system operating envelope.

    • STK-009
      9. STK-009 - Stakeholder STK-009

      The product shall meet the environmental and mechanical needs of its intended use.

ELE-008
35. ELE-008 - Electrical ELE-008

PCB creepage, clearance and trace geometry shall meet the approved design rules.

  • SYS-005
    15. SYS-005 - System SYS-005

    The pack shall interrupt charge/discharge according to the approved protection state table.

    • STK-003
      3. STK-003 - Stakeholder STK-003

      The product shall prevent hazardous electrical and thermal operating states.

ELE-009
36. ELE-009 - Electrical ELE-009

The BMS shall support a documented balancing strategy.

  • FW-006
    44. FW-006 - Firmware FW-006

    The firmware shall inhibit balancing under disallowed thermal/electrical states.

  • THM-008
    67. THM-008 - Thermal THM-008

    Cell balancing heat shall be represented in BMS thermal budget.

  • SYS-002
    12. SYS-002 - System SYS-002

    The V1 reference energy shall be 256 Wh nominal.

    • STK-001
      1. STK-001 - Stakeholder STK-001

      The product shall provide a replaceable 12.8 V nominal rechargeable energy source.

ELE-010
37. ELE-010 - Electrical ELE-010

Battery positive and negative polarity shall be unambiguous at external terminals.

  • CAD-004
    71. CAD-004 - CAD CAD-004

    The CAD assembly shall include terminals, busbars, BMS board, restraints and enclosure.

  • SYS-005
    15. SYS-005 - System SYS-005

    The pack shall interrupt charge/discharge according to the approved protection state table.

    • STK-003
      3. STK-003 - Stakeholder STK-003

      The product shall prevent hazardous electrical and thermal operating states.

ELE-011
38. ELE-011 - Electrical ELE-011

BMS power consumption shall remain within an approved storage and standby budget.

  • SYS-005
    15. SYS-005 - System SYS-005

    The pack shall interrupt charge/discharge according to the approved protection state table.

    • STK-003
      3. STK-003 - Stakeholder STK-003

      The product shall prevent hazardous electrical and thermal operating states.

FW-001
39. FW-001 - Firmware FW-001

The firmware shall implement explicit INIT, IDLE, CHARGE, DISCHARGE, FAULT and SLEEP states.

  • SYS-005
    15. SYS-005 - System SYS-005

    The pack shall interrupt charge/discharge according to the approved protection state table.

    • STK-003
      3. STK-003 - Stakeholder STK-003

      The product shall prevent hazardous electrical and thermal operating states.

FW-002
40. FW-002 - Firmware FW-002

The firmware shall not override autonomous hardware protection to enable unsafe current.

  • ELE-001
    28. ELE-001 - Electrical ELE-001

    The system shall measure every series-cell voltage independently.

    • SYS-005
      15. SYS-005 - System SYS-005

      The pack shall interrupt charge/discharge according to the approved protection state table.

      • STK-003
        3. STK-003 - Stakeholder STK-003

        The product shall prevent hazardous electrical and thermal operating states.

FW-003
41. FW-003 - Firmware FW-003

The firmware shall acquire and validate per-cell voltage samples.

  • ELE-003
    30. ELE-003 - Electrical ELE-003

    Pack current shall be measured in both charge and discharge directions.

    • SYS-005
      15. SYS-005 - System SYS-005

      The pack shall interrupt charge/discharge according to the approved protection state table.

      • STK-003
        3. STK-003 - Stakeholder STK-003

        The product shall prevent hazardous electrical and thermal operating states.

FW-004
42. FW-004 - Firmware FW-004

The firmware shall maintain a signed coulomb-counting current integral.

  • SYS-008
    18. SYS-008 - System SYS-008

    The pack shall expose a defined service interface for diagnostics.

    • STK-002
      2. STK-002 - Stakeholder STK-002

      The product shall support an agreed load and charger envelope.

FW-005
43. FW-005 - Firmware FW-005

The firmware shall expose versioned diagnostic telemetry.

  • ELE-009
    36. ELE-009 - Electrical ELE-009

    The BMS shall support a documented balancing strategy.

    • SYS-005
      15. SYS-005 - System SYS-005

      The pack shall interrupt charge/discharge according to the approved protection state table.

      • STK-003
        3. STK-003 - Stakeholder STK-003

        The product shall prevent hazardous electrical and thermal operating states.

FW-006
44. FW-006 - Firmware FW-006

The firmware shall inhibit balancing under disallowed thermal/electrical states.

  • SYS-005
    15. SYS-005 - System SYS-005

    The pack shall interrupt charge/discharge according to the approved protection state table.

    • STK-003
      3. STK-003 - Stakeholder STK-003

      The product shall prevent hazardous electrical and thermal operating states.

FW-007
45. FW-007 - Firmware FW-007

The firmware shall retain a fault cause across a reset when specified by fault policy.

  • SYS-005
    15. SYS-005 - System SYS-005

    The pack shall interrupt charge/discharge according to the approved protection state table.

    • STK-003
      3. STK-003 - Stakeholder STK-003

      The product shall prevent hazardous electrical and thermal operating states.

FW-008
46. FW-008 - Firmware FW-008

The firmware shall detect stalled critical tasks through watchdog supervision.

  • SYS-008
    18. SYS-008 - System SYS-008

    The pack shall expose a defined service interface for diagnostics.

    • STK-002
      2. STK-002 - Stakeholder STK-002

      The product shall support an agreed load and charger envelope.

FW-009
47. FW-009 - Firmware FW-009

The firmware shall reject malformed or unauthorized configuration commands.

  • STK-005
    5. STK-005 - Stakeholder STK-005

    The platform shall trace design decisions to requirements and verification evidence.

FW-010
48. FW-010 - Firmware FW-010

Every firmware release shall retain build provenance and checksum.

  • SYS-005
    15. SYS-005 - System SYS-005

    The pack shall interrupt charge/discharge according to the approved protection state table.

    • STK-003
      3. STK-003 - Stakeholder STK-003

      The product shall prevent hazardous electrical and thermal operating states.

FW-011
49. FW-011 - Firmware FW-011

The firmware shall detect stale or invalid temperature data.

  • SYS-008
    18. SYS-008 - System SYS-008

    The pack shall expose a defined service interface for diagnostics.

    • STK-002
      2. STK-002 - Stakeholder STK-002

      The product shall support an agreed load and charger envelope.

FW-012
50. FW-012 - Firmware FW-012

The firmware shall support a controlled calibration data procedure.

  • SYS-001
    11. SYS-001 - System SYS-001

    The V1 pack shall contain four LFP cells connected in series.

    • STK-001
      1. STK-001 - Stakeholder STK-001

      The product shall provide a replaceable 12.8 V nominal rechargeable energy source.

MEC-001
51. MEC-001 - Mechanical MEC-001

The pack shall secure four cells in the declared CAD orientation.

  • SYS-009
    19. SYS-009 - System SYS-009

    The pack shall comply with an approved system operating envelope.

    • STK-009
      9. STK-009 - Stakeholder STK-009

      The product shall meet the environmental and mechanical needs of its intended use.

MEC-002
52. MEC-002 - Mechanical MEC-002

Cell restraints shall comply with the manufacturer compression limits.

  • SYS-007
    17. SYS-007 - System SYS-007

    The pack shall incorporate a coordinated fuse and electronic protection concept.

    • STK-003
      3. STK-003 - Stakeholder STK-003

      The product shall prevent hazardous electrical and thermal operating states.

MEC-003
53. MEC-003 - Mechanical MEC-003

Electrical insulation shall prevent accidental busbar-enclosure contact in all specified tolerances.

  • CAD-008
    75. CAD-008 - CAD CAD-008

    CAD automation shall detect electrical/physical clearance rule violations.

  • SYS-009
    19. SYS-009 - System SYS-009

    The pack shall comply with an approved system operating envelope.

    • STK-009
      9. STK-009 - Stakeholder STK-009

      The product shall meet the environmental and mechanical needs of its intended use.

MEC-004
54. MEC-004 - Mechanical MEC-004

The enclosure shall withstand the approved static mounting loads.

  • SIM-008
    83. SIM-008 - Simulation SIM-008

    The structural solver shall support mesh convergence assessment.

  • SYS-009
    19. SYS-009 - System SYS-009

    The pack shall comply with an approved system operating envelope.

    • STK-009
      9. STK-009 - Stakeholder STK-009

      The product shall meet the environmental and mechanical needs of its intended use.

MEC-005
55. MEC-005 - Mechanical MEC-005

The mounting design shall avoid unacceptable resonances in the operational vibration profile.

  • SIM-007
    82. SIM-007 - Simulation SIM-007

    The structural model shall support eigenfrequency/modal analysis.

  • SYS-007
    17. SYS-007 - System SYS-007

    The pack shall incorporate a coordinated fuse and electronic protection concept.

    • STK-003
      3. STK-003 - Stakeholder STK-003

      The product shall prevent hazardous electrical and thermal operating states.

MEC-006
56. MEC-006 - Mechanical MEC-006

Busbar fastening shall use controlled fastener and torque specifications.

  • STK-008
    8. STK-008 - Stakeholder STK-008

    The product shall be serviceable using documented diagnostics and replaceable assemblies.

MEC-007
57. MEC-007 - Mechanical MEC-007

Serviceable components shall be accessible without disturbing cell terminals unintentionally.

  • SYS-009
    19. SYS-009 - System SYS-009

    The pack shall comply with an approved system operating envelope.

    • STK-009
      9. STK-009 - Stakeholder STK-009

      The product shall meet the environmental and mechanical needs of its intended use.

MEC-008
58. MEC-008 - Mechanical MEC-008

Mechanical BOM mass shall match CAD estimate within the approved discrepancy limit.

  • SYS-009
    19. SYS-009 - System SYS-009

    The pack shall comply with an approved system operating envelope.

    • STK-009
      9. STK-009 - Stakeholder STK-009

      The product shall meet the environmental and mechanical needs of its intended use.

MEC-009
59. MEC-009 - Mechanical MEC-009

Critical dimensions and tolerances shall be present in manufacturing drawings.

  • SYS-003
    13. SYS-003 - System SYS-003

    The V1 pack shall support 20 A continuous discharge at the specified ambient and SOC.

    • STK-002
      2. STK-002 - Stakeholder STK-002

      The product shall support an agreed load and charger envelope.

THM-001
60. THM-001 - Thermal THM-001

The thermal model shall represent resistive losses in cells and power path.

  • SYS-003
    13. SYS-003 - System SYS-003

    The V1 pack shall support 20 A continuous discharge at the specified ambient and SOC.

    • STK-002
      2. STK-002 - Stakeholder STK-002

      The product shall support an agreed load and charger envelope.

THM-002
61. THM-002 - Thermal THM-002

The thermal model shall represent ambient convection and thermal contact paths.

  • SYS-003
    13. SYS-003 - System SYS-003

    The V1 pack shall support 20 A continuous discharge at the specified ambient and SOC.

    • STK-002
      2. STK-002 - Stakeholder STK-002

      The product shall support an agreed load and charger envelope.

THM-003
62. THM-003 - Thermal THM-003

Thermal response shall be estimated for nominal load and agreed duty cycle.

  • SYS-003
    13. SYS-003 - System SYS-003

    The V1 pack shall support 20 A continuous discharge at the specified ambient and SOC.

    • STK-002
      2. STK-002 - Stakeholder STK-002

      The product shall support an agreed load and charger envelope.

THM-004
63. THM-004 - Thermal THM-004

The hottest measured cell location shall be included in a validation plan.

  • SYS-003
    13. SYS-003 - System SYS-003

    The V1 pack shall support 20 A continuous discharge at the specified ambient and SOC.

    • STK-002
      2. STK-002 - Stakeholder STK-002

      The product shall support an agreed load and charger envelope.

THM-005
64. THM-005 - Thermal THM-005

Thermal simulation accuracy shall be assessed against measured pack temperatures.

  • SIM-006
    81. SIM-006 - Simulation SIM-006

    The simulation pipeline shall support parameter calibration without overwriting original measurement data.

  • SYS-005
    15. SYS-005 - System SYS-005

    The pack shall interrupt charge/discharge according to the approved protection state table.

    • STK-003
      3. STK-003 - Stakeholder STK-003

      The product shall prevent hazardous electrical and thermal operating states.

THM-006
65. THM-006 - Thermal THM-006

The BMS shall block charging outside the permitted cell thermal range.

  • SYS-005
    15. SYS-005 - System SYS-005

    The pack shall interrupt charge/discharge according to the approved protection state table.

    • STK-003
      3. STK-003 - Stakeholder STK-003

      The product shall prevent hazardous electrical and thermal operating states.

THM-007
66. THM-007 - Thermal THM-007

The BMS shall block discharge outside the permitted cell thermal range.

  • ELE-009
    36. ELE-009 - Electrical ELE-009

    The BMS shall support a documented balancing strategy.

    • SYS-005
      15. SYS-005 - System SYS-005

      The pack shall interrupt charge/discharge according to the approved protection state table.

      • STK-003
        3. STK-003 - Stakeholder STK-003

        The product shall prevent hazardous electrical and thermal operating states.

THM-008
67. THM-008 - Thermal THM-008

Cell balancing heat shall be represented in BMS thermal budget.

  • STK-005
    5. STK-005 - Stakeholder STK-005

    The platform shall trace design decisions to requirements and verification evidence.

CAD-001
68. CAD-001 - CAD CAD-001

The master model shall generate the declared pack geometry from controlled parameters.

  • STK-007
    7. STK-007 - Stakeholder STK-007

    The product family shall support 24 V, 48 V and 72 V-class variants through controlled reuse.

CAD-002
69. CAD-002 - CAD CAD-002

The CAD generator shall support independent series count and cell dimensions within permitted families.

  • SYS-001
    11. SYS-001 - System SYS-001

    The V1 pack shall contain four LFP cells connected in series.

    • STK-001
      1. STK-001 - Stakeholder STK-001

      The product shall provide a replaceable 12.8 V nominal rechargeable energy source.

CAD-003
70. CAD-003 - CAD CAD-003

Each CAD cell shall reference an approved part geometry and tolerance set.

  • ELE-010
    37. ELE-010 - Electrical ELE-010

    Battery positive and negative polarity shall be unambiguous at external terminals.

    • SYS-002
      12. SYS-002 - System SYS-002

      The V1 reference energy shall be 256 Wh nominal.

      • STK-001
        1. STK-001 - Stakeholder STK-001

        The product shall provide a replaceable 12.8 V nominal rechargeable energy source.

CAD-004
71. CAD-004 - CAD CAD-004

The CAD assembly shall include terminals, busbars, BMS board, restraints and enclosure.

  • STK-006
    6. STK-006 - Stakeholder STK-006

    The project shall maintain a costed production BOM and approved alternatives.

CAD-005
72. CAD-005 - CAD CAD-005

CAD part quantities shall be reconciled with the engineering BOM.

  • STK-004
    4. STK-004 - Stakeholder STK-004

    The engineering platform shall allow remote access to released engineering designs.

CAD-006
73. CAD-006 - CAD CAD-006

The build pipeline shall publish a browser-inspectable 3D derivative.

  • STK-005
    5. STK-005 - Stakeholder STK-005

    The platform shall trace design decisions to requirements and verification evidence.

CAD-007
74. CAD-007 - CAD CAD-007

CAD outputs shall identify generator version and input parameter revision.

  • MEC-003
    53. MEC-003 - Mechanical MEC-003

    Electrical insulation shall prevent accidental busbar-enclosure contact in all specified tolerances.

    • SYS-007
      17. SYS-007 - System SYS-007

      The pack shall incorporate a coordinated fuse and electronic protection concept.

      • STK-003
        3. STK-003 - Stakeholder STK-003

        The product shall prevent hazardous electrical and thermal operating states.

CAD-008
75. CAD-008 - CAD CAD-008

CAD automation shall detect electrical/physical clearance rule violations.

  • STK-005
    5. STK-005 - Stakeholder STK-005

    The platform shall trace design decisions to requirements and verification evidence.

SIM-001
76. SIM-001 - Simulation SIM-001

The digital twin shall expose a 4-cell electrical equivalent-circuit model.

  • STK-005
    5. STK-005 - Stakeholder STK-005

    The platform shall trace design decisions to requirements and verification evidence.

SIM-002
77. SIM-002 - Simulation SIM-002

Each model run shall record parameter set, solver version and boundary conditions.

  • STK-005
    5. STK-005 - Stakeholder STK-005

    The platform shall trace design decisions to requirements and verification evidence.

SIM-003
78. SIM-003 - Simulation SIM-003

The simulator shall distinguish model predictions from measured test data.

  • STK-005
    5. STK-005 - Stakeholder STK-005

    The platform shall trace design decisions to requirements and verification evidence.

SIM-004
79. SIM-004 - Simulation SIM-004

The pack model shall report voltage, current, SOC, power and accumulated energy.

  • STK-005
    5. STK-005 - Stakeholder STK-005

    The platform shall trace design decisions to requirements and verification evidence.

SIM-005
80. SIM-005 - Simulation SIM-005

The pack model shall evaluate per-cell imbalance.

  • THM-005
    64. THM-005 - Thermal THM-005

    Thermal simulation accuracy shall be assessed against measured pack temperatures.

    • SYS-003
      13. SYS-003 - System SYS-003

      The V1 pack shall support 20 A continuous discharge at the specified ambient and SOC.

      • STK-002
        2. STK-002 - Stakeholder STK-002

        The product shall support an agreed load and charger envelope.

SIM-006
81. SIM-006 - Simulation SIM-006

The simulation pipeline shall support parameter calibration without overwriting original measurement data.

  • MEC-005
    55. MEC-005 - Mechanical MEC-005

    The mounting design shall avoid unacceptable resonances in the operational vibration profile.

    • SYS-009
      19. SYS-009 - System SYS-009

      The pack shall comply with an approved system operating envelope.

      • STK-009
        9. STK-009 - Stakeholder STK-009

        The product shall meet the environmental and mechanical needs of its intended use.

SIM-007
82. SIM-007 - Simulation SIM-007

The structural model shall support eigenfrequency/modal analysis.

  • MEC-004
    54. MEC-004 - Mechanical MEC-004

    The enclosure shall withstand the approved static mounting loads.

    • SYS-009
      19. SYS-009 - System SYS-009

      The pack shall comply with an approved system operating envelope.

      • STK-009
        9. STK-009 - Stakeholder STK-009

        The product shall meet the environmental and mechanical needs of its intended use.

SIM-008
83. SIM-008 - Simulation SIM-008

The structural solver shall support mesh convergence assessment.

  • STK-004
    4. STK-004 - Stakeholder STK-004

    The engineering platform shall allow remote access to released engineering designs.

SIM-009
84. SIM-009 - Simulation SIM-009

Interactive simulation shall return a useful lightweight response within the target UI budget.

  • STK-005
    5. STK-005 - Stakeholder STK-005

    The platform shall trace design decisions to requirements and verification evidence.

SIM-010
85. SIM-010 - Simulation SIM-010

Invalid model parameters shall be rejected before execution.

  • STK-004
    4. STK-004 - Stakeholder STK-004

    The engineering platform shall allow remote access to released engineering designs.

PLT-001
86. PLT-001 - Platform PLT-001

Authorized users shall access released projects through modern browsers.

  • STK-004
    4. STK-004 - Stakeholder STK-004

    The engineering platform shall allow remote access to released engineering designs.

PLT-002
87. PLT-002 - Platform PLT-002

Project access shall require authenticated identity and role authorization.

  • STK-004
    4. STK-004 - Stakeholder STK-004

    The engineering platform shall allow remote access to released engineering designs.

PLT-003
88. PLT-003 - Platform PLT-003

Large CAD and simulation artifacts shall be stored in Google Cloud Storage.

  • STK-005
    5. STK-005 - Stakeholder STK-005

    The platform shall trace design decisions to requirements and verification evidence.

PLT-004
89. PLT-004 - Platform PLT-004

Requirement documents shall be managed as Git-versioned text sources.

  • STK-004
    4. STK-004 - Stakeholder STK-004

    The engineering platform shall allow remote access to released engineering designs.

PLT-005
90. PLT-005 - Platform PLT-005

The UI shall display read-only released CAD model derivatives.

  • STK-005
    5. STK-005 - Stakeholder STK-005

    The platform shall trace design decisions to requirements and verification evidence.

PLT-006
91. PLT-006 - Platform PLT-006

Each simulation result shall reference immutable input and executable versions.

  • STK-004
    4. STK-004 - Stakeholder STK-004

    The engineering platform shall allow remote access to released engineering designs.

PLT-007
92. PLT-007 - Platform PLT-007

Long simulation jobs shall execute outside synchronous web requests.

  • STK-004
    4. STK-004 - Stakeholder STK-004

    The engineering platform shall allow remote access to released engineering designs.

PLT-008
93. PLT-008 - Platform PLT-008

Cloud storage objects shall be recoverable under the approved backup policy.

  • STK-004
    4. STK-004 - Stakeholder STK-004

    The engineering platform shall allow remote access to released engineering designs.

PLT-009
94. PLT-009 - Platform PLT-009

Remote application secrets shall not be embedded in downloaded browser assets.

  • STK-005
    5. STK-005 - Stakeholder STK-005

    The platform shall trace design decisions to requirements and verification evidence.

PLT-010
95. PLT-010 - Platform PLT-010

The system shall maintain immutable release manifests.

  • STK-005
    5. STK-005 - Stakeholder STK-005

    The platform shall trace design decisions to requirements and verification evidence.

PLT-011
96. PLT-011 - Platform PLT-011

The UI shall link each failed test to its governing requirement.

  • STK-004
    4. STK-004 - Stakeholder STK-004

    The engineering platform shall allow remote access to released engineering designs.

PLT-012
97. PLT-012 - Platform PLT-012

The platform shall refuse hazardous remote physical-bench actuation without local enable.

  • STK-005
    5. STK-005 - Stakeholder STK-005

    The platform shall trace design decisions to requirements and verification evidence.

PLT-013
98. PLT-013 - Platform PLT-013

The platform shall preserve source measurements separately from derived simulation results.

  • STK-004
    4. STK-004 - Stakeholder STK-004

    The engineering platform shall allow remote access to released engineering designs.

PLT-014
99. PLT-014 - Platform PLT-014

Users shall see run state, errors, and diagnostic references for failed jobs.

  • STK-005
    5. STK-005 - Stakeholder STK-005

    The platform shall trace design decisions to requirements and verification evidence.

VER-001
100. VER-001 - Verification VER-001

Every approved engineering requirement shall have a verification method and acceptance criterion.

  • STK-005
    5. STK-005 - Stakeholder STK-005

    The platform shall trace design decisions to requirements and verification evidence.

VER-002
101. VER-002 - Verification VER-002

Safety-critical requirements shall have a hazard link and review approval.

  • STK-005
    5. STK-005 - Stakeholder STK-005

    The platform shall trace design decisions to requirements and verification evidence.

VER-003
102. VER-003 - Verification VER-003

Test cases shall identify setup, stimuli, expected result, actual result and artifacts.

  • STK-005
    5. STK-005 - Stakeholder STK-005

    The platform shall trace design decisions to requirements and verification evidence.

VER-004
103. VER-004 - Verification VER-004

Verification results shall distinguish Passed, Failed, Blocked and Not Run.

  • STK-005
    5. STK-005 - Stakeholder STK-005

    The platform shall trace design decisions to requirements and verification evidence.

VER-005
104. VER-005 - Verification VER-005

The system shall prohibit release on unresolved critical verification failures.

  • STK-005
    5. STK-005 - Stakeholder STK-005

    The platform shall trace design decisions to requirements and verification evidence.

VER-006
105. VER-006 - Verification VER-006

Test equipment shall be linked to calibration status and uncertainty.

  • STK-005
    5. STK-005 - Stakeholder STK-005

    The platform shall trace design decisions to requirements and verification evidence.

VER-007
106. VER-007 - Verification VER-007

Requirement changes after baseline shall trigger impact analysis.

  • STK-005
    5. STK-005 - Stakeholder STK-005

    The platform shall trace design decisions to requirements and verification evidence.

VER-008
107. VER-008 - Verification VER-008

System validation shall be distinguished from specification verification.

  • STK-005
    5. STK-005 - Stakeholder STK-005

    The platform shall trace design decisions to requirements and verification evidence.

VER-009
108. VER-009 - Verification VER-009

Fault injection shall never energize an unguarded hazardous battery bench remotely.

  • STK-005
    5. STK-005 - Stakeholder STK-005

    The platform shall trace design decisions to requirements and verification evidence.

VER-010
109. VER-010 - Verification VER-010

Regression suites shall run on every controlled software change.

  • STK-006
    6. STK-006 - Stakeholder STK-006

    The project shall maintain a costed production BOM and approved alternatives.

BOM-001
110. BOM-001 - BOM BOM-001

Every approved purchasable part shall have a unique ID and revision.

  • STK-006
    6. STK-006 - Stakeholder STK-006

    The project shall maintain a costed production BOM and approved alternatives.

BOM-002
111. BOM-002 - BOM BOM-002

The BOM shall separate cell, BMS, enclosure, harness and assembly cost.

  • STK-006
    6. STK-006 - Stakeholder STK-006

    The project shall maintain a costed production BOM and approved alternatives.

BOM-003
112. BOM-003 - BOM BOM-003

Unit cost shall be calculated at prototype, 100 and 10000-unit quantities.

  • STK-006
    6. STK-006 - Stakeholder STK-006

    The project shall maintain a costed production BOM and approved alternatives.

BOM-004
113. BOM-004 - BOM BOM-004

Approved alternates shall preserve form-fit-function and qualification evidence.

  • STK-006
    6. STK-006 - Stakeholder STK-006

    The project shall maintain a costed production BOM and approved alternatives.

BOM-005
114. BOM-005 - BOM BOM-005

The platform shall flag obsolete or single-source critical parts.

  • STK-006
    6. STK-006 - Stakeholder STK-006

    The project shall maintain a costed production BOM and approved alternatives.

BOM-006
115. BOM-006 - BOM BOM-006

The system shall calculate estimated landed cost using separated assumptions.

  • STK-006
    6. STK-006 - Stakeholder STK-006

    The project shall maintain a costed production BOM and approved alternatives.

BOM-007
116. BOM-007 - BOM BOM-007

Any BOM cost comparison shall identify assumptions and quote validity.

  • STK-006
    6. STK-006 - Stakeholder STK-006

    The project shall maintain a costed production BOM and approved alternatives.

MFG-001
117. MFG-001 - Manufacturing MFG-001

The pack shall have a defined assembly process with controlled order of operations.

  • SYS-007
    17. SYS-007 - System SYS-007

    The pack shall incorporate a coordinated fuse and electronic protection concept.

    • STK-003
      3. STK-003 - Stakeholder STK-003

      The product shall prevent hazardous electrical and thermal operating states.

MFG-002
118. MFG-002 - Manufacturing MFG-002

Pack terminal, fuse and busbar assembly shall have prescribed inspection checks.

  • STK-005
    5. STK-005 - Stakeholder STK-005

    The platform shall trace design decisions to requirements and verification evidence.

MFG-003
119. MFG-003 - Manufacturing MFG-003

Each assembled pack shall carry serial and test result identity.

  • STK-006
    6. STK-006 - Stakeholder STK-006

    The project shall maintain a costed production BOM and approved alternatives.

MFG-004
120. MFG-004 - Manufacturing MFG-004

The project shall calculate yield-adjusted production BOM cost.

  • STK-003
    3. STK-003 - Stakeholder STK-003

    The product shall prevent hazardous electrical and thermal operating states.

MFG-005
121. MFG-005 - Manufacturing MFG-005

Release documents shall include safe shipping and handling requirements.

  • STK-005
    5. STK-005 - Stakeholder STK-005

    The platform shall trace design decisions to requirements and verification evidence.

MFG-006
122. MFG-006 - Manufacturing MFG-006

Firmware programming and configuration shall be logged during end-of-line test.

  • STK-007
    7. STK-007 - Stakeholder STK-007

    The product family shall support 24 V, 48 V and 72 V-class variants through controlled reuse.

SCL-001
123. SCL-001 - Scale-up SCL-001

The family architecture shall separate hardware-dependent protection from portable firmware logic.

  • STK-007
    7. STK-007 - Stakeholder STK-007

    The product family shall support 24 V, 48 V and 72 V-class variants through controlled reuse.

SCL-002
124. SCL-002 - Scale-up SCL-002

The platform shall reject designs where maximum pack voltage exceeds rated components.

  • STK-007
    7. STK-007 - Stakeholder STK-007

    The product family shall support 24 V, 48 V and 72 V-class variants through controlled reuse.

SCL-003
125. SCL-003 - Scale-up SCL-003

The 8S variant shall receive its own sensing and power protection review.

  • STK-007
    7. STK-007 - Stakeholder STK-007

    The product family shall support 24 V, 48 V and 72 V-class variants through controlled reuse.

SCL-004
126. SCL-004 - Scale-up SCL-004

The 16S variant shall receive separate voltage/clearance and protection validation.

  • STK-007
    7. STK-007 - Stakeholder STK-007

    The product family shall support 24 V, 48 V and 72 V-class variants through controlled reuse.

SCL-005
127. SCL-005 - Scale-up SCL-005

The 72 V-class variant shall define nominal and absolute maximum voltage explicitly.

  • STK-007
    7. STK-007 - Stakeholder STK-007

    The product family shall support 24 V, 48 V and 72 V-class variants through controlled reuse.

SCL-006
128. SCL-006 - Scale-up SCL-006

Higher-voltage variants shall be assessed for isolation and precharge requirements.

  • STK-007
    7. STK-007 - Stakeholder STK-007

    The product family shall support 24 V, 48 V and 72 V-class variants through controlled reuse.

SCL-007
129. SCL-007 - Scale-up SCL-007

Variants shall reuse requirement/test templates only after applicability review.

  • STK-007
    7. STK-007 - Stakeholder STK-007

    The product family shall support 24 V, 48 V and 72 V-class variants through controlled reuse.

SCL-008
130. SCL-008 - Scale-up SCL-008

Series-connected modules shall be validated as one coordinated pack protection system.