The product shall provide a replaceable 12.8 V nominal rechargeable energy source.
4S1P LFP reference architecture reviewed against intended load.
Review
Validation
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
-
11. SYS-001 - System UID: SYS-001 STATUS: Draft DOMAIN: System PARENT: STK-001 RELATIONS (Parent): RELATIONS (Child): STATEMENT: The V1 pack shall contain four LFP cells connected in series.
ACCEPTANCE: As-built cell count=4 and measured polarity/topology matches schematic.
METHOD: Inspection
VMODEL_LEVEL: System
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
TEST_IDS: TR-001
EXECUTION: Not Run
-
12. SYS-002 - System UID: SYS-002 STATUS: Draft DOMAIN: System PARENT: STK-001 RELATIONS (Parent): RELATIONS (Child): STATEMENT: The V1 reference energy shall be 256 Wh nominal.
ACCEPTANCE: 4 × 3.2 V × 20 Ah = 256 Wh in approved reference model.
METHOD: Analysis
VMODEL_LEVEL: System
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
The product shall support an agreed load and charger envelope.
Electrical load profile and charger profile approved with voltage/current/pulse ranges.
Review
Validation
V1-12V
Must
Unassigned
Engineering target - proposed
HZ-005
Not Run
-
13. SYS-003 - System UID: SYS-003 STATUS: Draft DOMAIN: System PARENT: STK-002 RELATIONS (Parent): RELATIONS (Child): STATEMENT: The V1 pack shall support 20 A continuous discharge at the specified ambient and SOC.
ACCEPTANCE: Validated steady-state load profile maintained without exceeding approved electrical/thermal limits.
METHOD: Test
VMODEL_LEVEL: System
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
-
14. SYS-004 - System UID: SYS-004 STATUS: Draft DOMAIN: System PARENT: STK-002 RELATIONS (Parent): STATEMENT: The V1 pack shall support 10 A charging where the cell supplier permits.
ACCEPTANCE: Charge test at 10 A passes supplier temperature, voltage, and current limits.
METHOD: Test
VMODEL_LEVEL: System
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
HAZARD_IDS: HZ-005
EXECUTION: Not Run
-
18. SYS-008 - System UID: SYS-008 STATUS: Draft DOMAIN: System PARENT: STK-002 RELATIONS (Parent): RELATIONS (Child): STATEMENT: The pack shall expose a defined service interface for diagnostics.
ACCEPTANCE: All protocol commands pass interface conformance tests.
METHOD: Test
VMODEL_LEVEL: System
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
The product shall prevent hazardous electrical and thermal operating states.
Hazard review identifies controls and verification for each unacceptable risk.
Review
Validation
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
-
15. SYS-005 - System UID: SYS-005 STATUS: Draft DOMAIN: System PARENT: STK-003 RELATIONS (Parent): RELATIONS (Child): - ELE-001 ELE-001 - Electrical (derives_from)
- ELE-002 ELE-002 - Electrical (derives_from)
- ELE-003 ELE-003 - Electrical (derives_from)
- ELE-004 ELE-004 - Electrical (derives_from)
- ELE-009 ELE-009 - Electrical (derives_from)
- ELE-011 ELE-011 - Electrical (derives_from)
- FW-001 FW-001 - Firmware (derives_from)
- FW-002 FW-002 - Firmware (derives_from)
- FW-007 FW-007 - Firmware (derives_from)
- FW-008 FW-008 - Firmware (derives_from)
- FW-011 FW-011 - Firmware (derives_from)
- THM-006 THM-006 - Thermal (derives_from)
- THM-007 THM-007 - Thermal (derives_from)
STATEMENT: The pack shall interrupt charge/discharge according to the approved protection state table.
ACCEPTANCE: Each listed fault produces expected output state and recorded event.
METHOD: Test
VMODEL_LEVEL: System
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
TEST_IDS: TR-004, TR-005
HAZARD_IDS: HZ-001
EXECUTION: Not Run
-
16. SYS-006 - System UID: SYS-006 STATUS: Draft DOMAIN: System PARENT: STK-003 RELATIONS (Parent): STATEMENT: Pack overcurrent/short-circuit protection shall not depend on a cloud connection.
ACCEPTANCE: Connectivity removed; hardware protection remains functional in supervised bench test.
METHOD: Test
VMODEL_LEVEL: System
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
TEST_IDS: TR-007
HAZARD_IDS: HZ-002
EXECUTION: Not Run
-
17. SYS-007 - System UID: SYS-007 STATUS: Draft DOMAIN: System PARENT: STK-003 RELATIONS (Parent): RELATIONS (Child): STATEMENT: The pack shall incorporate a coordinated fuse and electronic protection concept.
ACCEPTANCE: Safety review validates fuse ratings, FET SOA, fault energy, wiring, and disconnection behavior.
METHOD: Analysis
VMODEL_LEVEL: System
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
HAZARD_IDS: HZ-002, HZ-007
EXECUTION: Not Run
-
121. MFG-005 - Manufacturing UID: MFG-005 STATUS: Draft DOMAIN: Manufacturing PARENT: STK-003 RELATIONS (Parent): STATEMENT: Release documents shall include safe shipping and handling requirements.
ACCEPTANCE: Reviewed handling procedure and applicable transport compliance matrix exist.
METHOD: Inspection
VMODEL_LEVEL: Process
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
- CAD-006 CAD-006 - CAD (derives_from)
- SIM-009 SIM-009 - Simulation (derives_from)
- PLT-001 PLT-001 - Platform (derives_from)
- PLT-002 PLT-002 - Platform (derives_from)
- PLT-003 PLT-003 - Platform (derives_from)
- PLT-005 PLT-005 - Platform (derives_from)
- PLT-007 PLT-007 - Platform (derives_from)
- PLT-008 PLT-008 - Platform (derives_from)
- PLT-009 PLT-009 - Platform (derives_from)
- PLT-012 PLT-012 - Platform (derives_from)
- PLT-014 PLT-014 - Platform (derives_from)
The engineering platform shall allow remote access to released engineering designs.
Authorized browser can retrieve released CAD view, requirements, BOM, and reports.
Demo
Validation
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
-
73. CAD-006 - CAD UID: CAD-006 STATUS: Draft DOMAIN: CAD PARENT: STK-004 RELATIONS (Parent): STATEMENT: The build pipeline shall publish a browser-inspectable 3D derivative.
ACCEPTANCE: GLB/glTF derivative opens in target browsers with part IDs and units intact.
METHOD: Test
VMODEL_LEVEL: Platform
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
-
84. SIM-009 - Simulation UID: SIM-009 STATUS: Draft DOMAIN: Simulation PARENT: STK-004 RELATIONS (Parent): STATEMENT: Interactive simulation shall return a useful lightweight response within the target UI budget.
ACCEPTANCE: 95th percentile local scenario calculation <2 seconds on target test workstation.
METHOD: Test
VMODEL_LEVEL: Platform
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
-
86. PLT-001 - Platform UID: PLT-001 STATUS: Draft DOMAIN: Platform PARENT: STK-004 RELATIONS (Parent): STATEMENT: Authorized users shall access released projects through modern browsers.
ACCEPTANCE: Desktop and mobile browser acceptance matrix passes.
METHOD: Test
VMODEL_LEVEL: Platform
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
-
87. PLT-002 - Platform UID: PLT-002 STATUS: Draft DOMAIN: Platform PARENT: STK-004 RELATIONS (Parent): STATEMENT: Project access shall require authenticated identity and role authorization.
ACCEPTANCE: Negative tests deny unauthenticated and cross-project access.
METHOD: Test
VMODEL_LEVEL: Platform
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
TEST_IDS: TR-020
EXECUTION: Not Run
-
88. PLT-003 - Platform UID: PLT-003 STATUS: Draft DOMAIN: Platform PARENT: STK-004 RELATIONS (Parent): STATEMENT: Large CAD and simulation artifacts shall be stored in Google Cloud Storage.
ACCEPTANCE: Artifact upload/download integrity hash matches and metadata indexed.
METHOD: Test
VMODEL_LEVEL: Platform
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
-
90. PLT-005 - Platform UID: PLT-005 STATUS: Draft DOMAIN: Platform PARENT: STK-004 RELATIONS (Parent): STATEMENT: The UI shall display read-only released CAD model derivatives.
ACCEPTANCE: Released revision loads and independent user cannot mutate master CAD.
METHOD: Test
VMODEL_LEVEL: Platform
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
-
92. PLT-007 - Platform UID: PLT-007 STATUS: Draft DOMAIN: Platform PARENT: STK-004 RELATIONS (Parent): STATEMENT: Long simulation jobs shall execute outside synchronous web requests.
ACCEPTANCE: Job survives browser disconnect; status and result remain retrievable.
METHOD: Test
VMODEL_LEVEL: Platform
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
TEST_IDS: TR-021
EXECUTION: Not Run
-
93. PLT-008 - Platform UID: PLT-008 STATUS: Draft DOMAIN: Platform PARENT: STK-004 RELATIONS (Parent): STATEMENT: Cloud storage objects shall be recoverable under the approved backup policy.
ACCEPTANCE: Documented restore drill recovers deliberately removed test dataset.
METHOD: Test
VMODEL_LEVEL: Platform
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
TEST_IDS: TR-022
HAZARD_IDS: HZ-015
EXECUTION: Not Run
-
94. PLT-009 - Platform UID: PLT-009 STATUS: Draft DOMAIN: Platform PARENT: STK-004 RELATIONS (Parent): STATEMENT: Remote application secrets shall not be embedded in downloaded browser assets.
ACCEPTANCE: Security review and secret scanning identify no exposed credentials.
METHOD: Inspection
VMODEL_LEVEL: Platform
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
-
97. PLT-012 - Platform UID: PLT-012 STATUS: Draft DOMAIN: Platform PARENT: STK-004 RELATIONS (Parent): STATEMENT: The platform shall refuse hazardous remote physical-bench actuation without local enable.
ACCEPTANCE: Authorization negative test and physical local interlock demonstration pass.
METHOD: Test
VMODEL_LEVEL: Platform
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
TEST_IDS: TR-023
HAZARD_IDS: HZ-013
EXECUTION: Not Run
-
99. PLT-014 - Platform UID: PLT-014 STATUS: Draft DOMAIN: Platform PARENT: STK-004 RELATIONS (Parent): STATEMENT: Users shall see run state, errors, and diagnostic references for failed jobs.
ACCEPTANCE: Forced solver failure yields log link, failure code, and no false 'passed' state.
METHOD: Test
VMODEL_LEVEL: Platform
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
- SYS-010 SYS-010 - System (derives_from)
- FW-010 FW-010 - Firmware (derives_from)
- CAD-001 CAD-001 - CAD (derives_from)
- CAD-007 CAD-007 - CAD (derives_from)
- SIM-001 SIM-001 - Simulation (derives_from)
- SIM-002 SIM-002 - Simulation (derives_from)
- SIM-003 SIM-003 - Simulation (derives_from)
- SIM-004 SIM-004 - Simulation (derives_from)
- SIM-005 SIM-005 - Simulation (derives_from)
- SIM-010 SIM-010 - Simulation (derives_from)
- PLT-004 PLT-004 - Platform (derives_from)
- PLT-006 PLT-006 - Platform (derives_from)
- PLT-010 PLT-010 - Platform (derives_from)
- PLT-011 PLT-011 - Platform (derives_from)
- PLT-013 PLT-013 - Platform (derives_from)
- VER-001 VER-001 - Verification (derives_from)
- VER-002 VER-002 - Verification (derives_from)
- VER-003 VER-003 - Verification (derives_from)
- VER-004 VER-004 - Verification (derives_from)
- VER-005 VER-005 - Verification (derives_from)
- VER-006 VER-006 - Verification (derives_from)
- VER-007 VER-007 - Verification (derives_from)
- VER-008 VER-008 - Verification (derives_from)
- VER-009 VER-009 - Verification (derives_from)
- VER-010 VER-010 - Verification (derives_from)
- MFG-003 MFG-003 - Manufacturing (derives_from)
- MFG-006 MFG-006 - Manufacturing (derives_from)
The platform shall trace design decisions to requirements and verification evidence.
Sample 10 requirements traced bidirectionally through implementation and test reports.
Inspection
Validation
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
-
20. SYS-010 - System UID: SYS-010 STATUS: Draft DOMAIN: System PARENT: STK-005 RELATIONS (Parent): STATEMENT: Every completed system test shall identify the tested hardware and firmware revisions.
ACCEPTANCE: Test artifacts contain immutable HW rev, FW hash, instrument calibration, date.
METHOD: Inspection
VMODEL_LEVEL: System
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
-
48. FW-010 - Firmware UID: FW-010 STATUS: Draft DOMAIN: Firmware PARENT: STK-005 RELATIONS (Parent): STATEMENT: Every firmware release shall retain build provenance and checksum.
ACCEPTANCE: Rebuild from pinned inputs reproduces version metadata and artifact hash policy.
METHOD: Inspection
VMODEL_LEVEL: Software
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
-
68. CAD-001 - CAD UID: CAD-001 STATUS: Draft DOMAIN: CAD PARENT: STK-005 RELATIONS (Parent): STATEMENT: The master model shall generate the declared pack geometry from controlled parameters.
ACCEPTANCE: Regenerate 4S nominal variant without manual topology repair.
METHOD: Demo
VMODEL_LEVEL: Model
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
TEST_IDS: TR-015
EXECUTION: Not Run
-
74. CAD-007 - CAD UID: CAD-007 STATUS: Draft DOMAIN: CAD PARENT: STK-005 RELATIONS (Parent): STATEMENT: CAD outputs shall identify generator version and input parameter revision.
ACCEPTANCE: Manifest links source file, hash, parameter set and derived file hash.
METHOD: Inspection
VMODEL_LEVEL: Platform
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
-
76. SIM-001 - Simulation UID: SIM-001 STATUS: Draft DOMAIN: Simulation PARENT: STK-005 RELATIONS (Parent): STATEMENT: The digital twin shall expose a 4-cell electrical equivalent-circuit model.
ACCEPTANCE: Model responds deterministically to frozen input scenario with baseline output.
METHOD: Test
VMODEL_LEVEL: Model
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
-
77. SIM-002 - Simulation UID: SIM-002 STATUS: Draft DOMAIN: Simulation PARENT: STK-005 RELATIONS (Parent): STATEMENT: Each model run shall record parameter set, solver version and boundary conditions.
ACCEPTANCE: 100% sampled runs reproduce metadata manifest and result hashes.
METHOD: Inspection
VMODEL_LEVEL: Model
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
HAZARD_IDS: HZ-011
EXECUTION: Not Run
-
78. SIM-003 - Simulation UID: SIM-003 STATUS: Draft DOMAIN: Simulation PARENT: STK-005 RELATIONS (Parent): STATEMENT: The simulator shall distinguish model predictions from measured test data.
ACCEPTANCE: UI and exported report mark data origin at sample and series level.
METHOD: Test
VMODEL_LEVEL: Platform
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
-
79. SIM-004 - Simulation UID: SIM-004 STATUS: Draft DOMAIN: Simulation PARENT: STK-005 RELATIONS (Parent): STATEMENT: The pack model shall report voltage, current, SOC, power and accumulated energy.
ACCEPTANCE: Numerical conservation/reference checks and display unit tests pass.
METHOD: Test
VMODEL_LEVEL: Model
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
TEST_IDS: TR-018
EXECUTION: Not Run
-
80. SIM-005 - Simulation UID: SIM-005 STATUS: Draft DOMAIN: Simulation PARENT: STK-005 RELATIONS (Parent): STATEMENT: The pack model shall evaluate per-cell imbalance.
ACCEPTANCE: Unbalanced cell synthetic case generates distinct cell states and alerts.
METHOD: Test
VMODEL_LEVEL: Model
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
-
85. SIM-010 - Simulation UID: SIM-010 STATUS: Draft DOMAIN: Simulation PARENT: STK-005 RELATIONS (Parent): STATEMENT: Invalid model parameters shall be rejected before execution.
ACCEPTANCE: Schema/physics guards reject negative resistance, zero mass, bad series count.
METHOD: Test
VMODEL_LEVEL: Platform
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
TEST_IDS: TR-019
EXECUTION: Not Run
-
89. PLT-004 - Platform UID: PLT-004 STATUS: Draft DOMAIN: Platform PARENT: STK-005 RELATIONS (Parent): STATEMENT: Requirement documents shall be managed as Git-versioned text sources.
ACCEPTANCE: A change is traceable to commit, author, diff and review decision.
METHOD: Inspection
VMODEL_LEVEL: Platform
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
-
91. PLT-006 - Platform UID: PLT-006 STATUS: Draft DOMAIN: Platform PARENT: STK-005 RELATIONS (Parent): STATEMENT: Each simulation result shall reference immutable input and executable versions.
ACCEPTANCE: Run manifest contains source commit, params checksum, solver version.
METHOD: Inspection
VMODEL_LEVEL: Platform
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
-
95. PLT-010 - Platform UID: PLT-010 STATUS: Draft DOMAIN: Platform PARENT: STK-005 RELATIONS (Parent): STATEMENT: The system shall maintain immutable release manifests.
ACCEPTANCE: Release includes refs/hashes for requirements, PCB, CAD, FW, BOM, test evidence.
METHOD: Test
VMODEL_LEVEL: Platform
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
TEST_IDS: TR-024
HAZARD_IDS: HZ-015
EXECUTION: Not Run
-
96. PLT-011 - Platform UID: PLT-011 STATUS: Draft DOMAIN: Platform PARENT: STK-005 RELATIONS (Parent): STATEMENT: The UI shall link each failed test to its governing requirement.
ACCEPTANCE: Select failed test and navigate to matching requirement ID and commit.
METHOD: Demo
VMODEL_LEVEL: Platform
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
-
98. PLT-013 - Platform UID: PLT-013 STATUS: Draft DOMAIN: Platform PARENT: STK-005 RELATIONS (Parent): STATEMENT: The platform shall preserve source measurements separately from derived simulation results.
ACCEPTANCE: Original datasets content-addressed; transformations separately versioned.
METHOD: Inspection
VMODEL_LEVEL: Platform
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
-
100. VER-001 - Verification UID: VER-001 STATUS: Draft DOMAIN: Verification PARENT: STK-005 RELATIONS (Parent): STATEMENT: Every approved engineering requirement shall have a verification method and acceptance criterion.
ACCEPTANCE: No approved requirements have blank method, criterion, or verification ID.
METHOD: Inspection
VMODEL_LEVEL: Process
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
-
101. VER-002 - Verification UID: VER-002 STATUS: Draft DOMAIN: Verification PARENT: STK-005 RELATIONS (Parent): STATEMENT: Safety-critical requirements shall have a hazard link and review approval.
ACCEPTANCE: 100% safety-tagged requirements linked to at least one risk or safety rationale.
METHOD: Inspection
VMODEL_LEVEL: Process
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
-
102. VER-003 - Verification UID: VER-003 STATUS: Draft DOMAIN: Verification PARENT: STK-005 RELATIONS (Parent): STATEMENT: Test cases shall identify setup, stimuli, expected result, actual result and artifacts.
ACCEPTANCE: Sample tests contain all fields and independent rerun possible.
METHOD: Inspection
VMODEL_LEVEL: Process
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
-
103. VER-004 - Verification UID: VER-004 STATUS: Draft DOMAIN: Verification PARENT: STK-005 RELATIONS (Parent): STATEMENT: Verification results shall distinguish Passed, Failed, Blocked and Not Run.
ACCEPTANCE: Report schema validation rejects ambiguous status labels.
METHOD: Test
VMODEL_LEVEL: Process
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
-
104. VER-005 - Verification UID: VER-005 STATUS: Draft DOMAIN: Verification PARENT: STK-005 RELATIONS (Parent): STATEMENT: The system shall prohibit release on unresolved critical verification failures.
ACCEPTANCE: Synthetic critical failure blocks release gate automatically.
METHOD: Test
VMODEL_LEVEL: Process
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
TEST_IDS: TR-025
EXECUTION: Not Run
-
105. VER-006 - Verification UID: VER-006 STATUS: Draft DOMAIN: Verification PARENT: STK-005 RELATIONS (Parent): STATEMENT: Test equipment shall be linked to calibration status and uncertainty.
ACCEPTANCE: Each measurement-based test has instrument ID, calibration date, uncertainty.
METHOD: Inspection
VMODEL_LEVEL: Process
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
-
106. VER-007 - Verification UID: VER-007 STATUS: Draft DOMAIN: Verification PARENT: STK-005 RELATIONS (Parent): STATEMENT: Requirement changes after baseline shall trigger impact analysis.
ACCEPTANCE: Diff lists affected architecture elements, CAD, PCB, FW and test IDs.
METHOD: Demo
VMODEL_LEVEL: Process
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
-
107. VER-008 - Verification UID: VER-008 STATUS: Draft DOMAIN: Verification PARENT: STK-005 RELATIONS (Parent): STATEMENT: System validation shall be distinguished from specification verification.
ACCEPTANCE: V&V plan provides separate user-need acceptance and compliance evidence.
METHOD: Review
VMODEL_LEVEL: Process
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
-
108. VER-009 - Verification UID: VER-009 STATUS: Draft DOMAIN: Verification PARENT: STK-005 RELATIONS (Parent): STATEMENT: Fault injection shall never energize an unguarded hazardous battery bench remotely.
ACCEPTANCE: Interlock validation rejects remote command in unsafe configuration.
METHOD: Test
VMODEL_LEVEL: Process
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
HAZARD_IDS: HZ-013
EXECUTION: Not Run
-
109. VER-010 - Verification UID: VER-010 STATUS: Draft DOMAIN: Verification PARENT: STK-005 RELATIONS (Parent): STATEMENT: Regression suites shall run on every controlled software change.
ACCEPTANCE: CI report records pass/fail, commit and test count for each merge.
METHOD: Test
VMODEL_LEVEL: Process
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
-
119. MFG-003 - Manufacturing UID: MFG-003 STATUS: Draft DOMAIN: Manufacturing PARENT: STK-005 RELATIONS (Parent): STATEMENT: Each assembled pack shall carry serial and test result identity.
ACCEPTANCE: Physical label resolves to build record, lot, FW and test data.
METHOD: Test
VMODEL_LEVEL: System
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
TEST_IDS: TR-027
EXECUTION: Not Run
-
122. MFG-006 - Manufacturing UID: MFG-006 STATUS: Draft DOMAIN: Manufacturing PARENT: STK-005 RELATIONS (Parent): STATEMENT: Firmware programming and configuration shall be logged during end-of-line test.
ACCEPTANCE: EOL record captures image hash, settings CRC and measured calibration data.
METHOD: Test
VMODEL_LEVEL: System
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
- CAD-005 CAD-005 - CAD (derives_from)
- BOM-001 BOM-001 - BOM (derives_from)
- BOM-002 BOM-002 - BOM (derives_from)
- BOM-003 BOM-003 - BOM (derives_from)
- BOM-004 BOM-004 - BOM (derives_from)
- BOM-005 BOM-005 - BOM (derives_from)
- BOM-006 BOM-006 - BOM (derives_from)
- BOM-007 BOM-007 - BOM (derives_from)
- MFG-001 MFG-001 - Manufacturing (derives_from)
- MFG-004 MFG-004 - Manufacturing (derives_from)
The project shall maintain a costed production BOM and approved alternatives.
100% of released purchasable parts have source, quantity, cost and lifecycle status.
Inspection
Validation
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
-
72. CAD-005 - CAD UID: CAD-005 STATUS: Draft DOMAIN: CAD PARENT: STK-006 RELATIONS (Parent): STATEMENT: CAD part quantities shall be reconciled with the engineering BOM.
ACCEPTANCE: All released CAD component IDs map to counted BOM positions.
METHOD: Test
VMODEL_LEVEL: Model
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
TEST_IDS: TR-017
EXECUTION: Not Run
-
110. BOM-001 - BOM UID: BOM-001 STATUS: Draft DOMAIN: BOM PARENT: STK-006 RELATIONS (Parent): STATEMENT: Every approved purchasable part shall have a unique ID and revision.
ACCEPTANCE: 100% released parts have part numbers, approved footprint or spec and revision.
METHOD: Inspection
VMODEL_LEVEL: Process
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
-
111. BOM-002 - BOM UID: BOM-002 STATUS: Draft DOMAIN: BOM PARENT: STK-006 RELATIONS (Parent): STATEMENT: The BOM shall separate cell, BMS, enclosure, harness and assembly cost.
ACCEPTANCE: Cost rollup correctly sums subassembly and unit totals.
METHOD: Test
VMODEL_LEVEL: Process
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
-
112. BOM-003 - BOM UID: BOM-003 STATUS: Draft DOMAIN: BOM PARENT: STK-006 RELATIONS (Parent): STATEMENT: Unit cost shall be calculated at prototype, 100 and 10000-unit quantities.
ACCEPTANCE: Cost rollup produces price breaks with quote dates and currency.
METHOD: Test
VMODEL_LEVEL: Process
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
TEST_IDS: TR-026
EXECUTION: Not Run
-
113. BOM-004 - BOM UID: BOM-004 STATUS: Draft DOMAIN: BOM PARENT: STK-006 RELATIONS (Parent): STATEMENT: Approved alternates shall preserve form-fit-function and qualification evidence.
ACCEPTANCE: Replacement cannot be marked approved without referenced validation.
METHOD: Inspection
VMODEL_LEVEL: Process
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
-
114. BOM-005 - BOM UID: BOM-005 STATUS: Draft DOMAIN: BOM PARENT: STK-006 RELATIONS (Parent): STATEMENT: The platform shall flag obsolete or single-source critical parts.
ACCEPTANCE: Artificial supplier change triggers lifecycle risk flag.
METHOD: Test
VMODEL_LEVEL: Platform
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
-
115. BOM-006 - BOM UID: BOM-006 STATUS: Draft DOMAIN: BOM PARENT: STK-006 RELATIONS (Parent): STATEMENT: The system shall calculate estimated landed cost using separated assumptions.
ACCEPTANCE: Formula validation covers price, scrap, assembly, freight and test yield.
METHOD: Test
VMODEL_LEVEL: Platform
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
-
116. BOM-007 - BOM UID: BOM-007 STATUS: Draft DOMAIN: BOM PARENT: STK-006 RELATIONS (Parent): STATEMENT: Any BOM cost comparison shall identify assumptions and quote validity.
ACCEPTANCE: 100% review samples show quote date and currency normalization.
METHOD: Inspection
VMODEL_LEVEL: Process
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
-
117. MFG-001 - Manufacturing UID: MFG-001 STATUS: Draft DOMAIN: Manufacturing PARENT: STK-006 RELATIONS (Parent): STATEMENT: The pack shall have a defined assembly process with controlled order of operations.
ACCEPTANCE: Approved work instructions identify each critical step and hazard.
METHOD: Inspection
VMODEL_LEVEL: Process
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
-
120. MFG-004 - Manufacturing UID: MFG-004 STATUS: Draft DOMAIN: Manufacturing PARENT: STK-006 RELATIONS (Parent): STATEMENT: The project shall calculate yield-adjusted production BOM cost.
ACCEPTANCE: Production estimate formula tests pass for multiple scrap/yield inputs.
METHOD: Test
VMODEL_LEVEL: Process
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
- CAD-002 CAD-002 - CAD (derives_from)
- SCL-001 SCL-001 - Scale-up (derives_from)
- SCL-002 SCL-002 - Scale-up (derives_from)
- SCL-003 SCL-003 - Scale-up (derives_from)
- SCL-004 SCL-004 - Scale-up (derives_from)
- SCL-005 SCL-005 - Scale-up (derives_from)
- SCL-006 SCL-006 - Scale-up (derives_from)
- SCL-007 SCL-007 - Scale-up (derives_from)
- SCL-008 SCL-008 - Scale-up (derives_from)
The product family shall support 24 V, 48 V and 72 V-class variants through controlled reuse.
Family architecture defines reusable and variant-specific assets with no safety assumptions inherited implicitly.
Review
Validation
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
-
69. CAD-002 - CAD UID: CAD-002 STATUS: Draft DOMAIN: CAD PARENT: STK-007 RELATIONS (Parent): STATEMENT: The CAD generator shall support independent series count and cell dimensions within permitted families.
ACCEPTANCE: Parameterized 4S/8S/16S geometries generated; invalid combinations rejected.
METHOD: Test
VMODEL_LEVEL: Model
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
TEST_IDS: TR-016
EXECUTION: Not Run
-
123. SCL-001 - Scale-up UID: SCL-001 STATUS: Draft DOMAIN: Scale-up PARENT: STK-007 RELATIONS (Parent): STATEMENT: The family architecture shall separate hardware-dependent protection from portable firmware logic.
ACCEPTANCE: Design review identifies abstraction interfaces and variant-specific drivers.
METHOD: Inspection
VMODEL_LEVEL: Architecture
RELEASE: V2+
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
-
124. SCL-002 - Scale-up UID: SCL-002 STATUS: Draft DOMAIN: Scale-up PARENT: STK-007 RELATIONS (Parent): STATEMENT: The platform shall reject designs where maximum pack voltage exceeds rated components.
ACCEPTANCE: Static rule uses cell upper limit * series count against rated design envelope.
METHOD: Test
VMODEL_LEVEL: Platform
RELEASE: V2+
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
HAZARD_IDS: HZ-014
EXECUTION: Not Run
-
125. SCL-003 - Scale-up UID: SCL-003 STATUS: Draft DOMAIN: Scale-up PARENT: STK-007 RELATIONS (Parent): STATEMENT: The 8S variant shall receive its own sensing and power protection review.
ACCEPTANCE: 8S architecture sign-off includes sensor, FET, charger, thermal and fuse design.
METHOD: Review
VMODEL_LEVEL: Architecture
RELEASE: V2+
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
-
126. SCL-004 - Scale-up UID: SCL-004 STATUS: Draft DOMAIN: Scale-up PARENT: STK-007 RELATIONS (Parent): STATEMENT: The 16S variant shall receive separate voltage/clearance and protection validation.
ACCEPTANCE: 16S revision has independent electrical and mechanical verification plan.
METHOD: Review
VMODEL_LEVEL: Architecture
RELEASE: V3+
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
-
127. SCL-005 - Scale-up UID: SCL-005 STATUS: Draft DOMAIN: Scale-up PARENT: STK-007 RELATIONS (Parent): STATEMENT: The 72 V-class variant shall define nominal and absolute maximum voltage explicitly.
ACCEPTANCE: System datasheet declares chemistry, series count and maximum charged voltage.
METHOD: Inspection
VMODEL_LEVEL: Architecture
RELEASE: V4+
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
HAZARD_IDS: HZ-014
EXECUTION: Not Run
-
128. SCL-006 - Scale-up UID: SCL-006 STATUS: Draft DOMAIN: Scale-up PARENT: STK-007 RELATIONS (Parent): STATEMENT: Higher-voltage variants shall be assessed for isolation and precharge requirements.
ACCEPTANCE: Hazard/architecture review documents whether isolation and precharge are needed.
METHOD: Analysis
VMODEL_LEVEL: Architecture
RELEASE: V4+
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
-
129. SCL-007 - Scale-up UID: SCL-007 STATUS: Draft DOMAIN: Scale-up PARENT: STK-007 RELATIONS (Parent): STATEMENT: Variants shall reuse requirement/test templates only after applicability review.
ACCEPTANCE: Each inherited requirement lists applicable variants and any revised criterion.
METHOD: Inspection
VMODEL_LEVEL: Process
RELEASE: V2+
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
-
130. SCL-008 - Scale-up UID: SCL-008 STATUS: Draft DOMAIN: Scale-up PARENT: STK-007 RELATIONS (Parent): STATEMENT: Series-connected modules shall be validated as one coordinated pack protection system.
ACCEPTANCE: System fault model reviews worst-case module trip, imbalance, and unintended reclose.
METHOD: Analysis
VMODEL_LEVEL: System
RELEASE: V4+
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
The product shall be serviceable using documented diagnostics and replaceable assemblies.
Documented diagnostic workflow identifies each specified field-replaceable assembly.
Demo
Validation
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
-
57. MEC-007 - Mechanical UID: MEC-007 STATUS: Draft DOMAIN: Mechanical PARENT: STK-008 RELATIONS (Parent): STATEMENT: Serviceable components shall be accessible without disturbing cell terminals unintentionally.
ACCEPTANCE: Service procedure dry-run demonstrates defined replacement and isolation sequence.
METHOD: Demo
VMODEL_LEVEL: System
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
The product shall meet the environmental and mechanical needs of its intended use.
Environmental profile and corresponding qualification plan approved.
Review
Validation
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
-
19. SYS-009 - System UID: SYS-009 STATUS: Draft DOMAIN: System PARENT: STK-009 RELATIONS (Parent): RELATIONS (Child): - CEL-003 CEL-003 - Cell (derives_from)
- CEL-004 CEL-004 - Cell (derives_from)
- CEL-007 CEL-007 - Cell (derives_from)
- ELE-008 ELE-008 - Electrical (derives_from)
- MEC-002 MEC-002 - Mechanical (derives_from)
- MEC-004 MEC-004 - Mechanical (derives_from)
- MEC-005 MEC-005 - Mechanical (derives_from)
- MEC-008 MEC-008 - Mechanical (derives_from)
- MEC-009 MEC-009 - Mechanical (derives_from)
STATEMENT: The pack shall comply with an approved system operating envelope.
ACCEPTANCE: Operating envelope table approved and full boundary-condition test coverage assigned.
METHOD: Review
VMODEL_LEVEL: System
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
The project shall support independent review and controlled engineering releases.
Each released baseline carries approver, version, date and evidence manifest.
Inspection
Validation
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
-
1. STK-001 - Stakeholder UID: STK-001 STATUS: Draft DOMAIN: Stakeholder RELATIONS (Child): STATEMENT: The product shall provide a replaceable 12.8 V nominal rechargeable energy source.
ACCEPTANCE: 4S1P LFP reference architecture reviewed against intended load.
METHOD: Review
VMODEL_LEVEL: Validation
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
The V1 pack shall contain four LFP cells connected in series.
As-built cell count=4 and measured polarity/topology matches schematic.
Inspection
System
V1-12V
Must
Unassigned
Engineering target - proposed
TR-001
Not Run
-
21. CEL-001 - Cell UID: CEL-001 STATUS: Draft DOMAIN: Cell PARENT: SYS-001 RELATIONS (Parent): STATEMENT: Each cell shall be traceable to an approved manufacturer and part number.
ACCEPTANCE: Serial/lot, source datasheet and supplier documented for every prototype cell.
METHOD: Inspection
VMODEL_LEVEL: Component
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
HAZARD_IDS: HZ-003
EXECUTION: Not Run
-
22. CEL-002 - Cell UID: CEL-002 STATUS: Draft DOMAIN: Cell PARENT: SYS-001 RELATIONS (Parent): STATEMENT: The selected cell shall provide at least 20 Ah nominal capacity under its specified conditions.
ACCEPTANCE: Manufacturer spec confirmed and capacity acceptance test method approved.
METHOD: Test
VMODEL_LEVEL: Component
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
-
25. CEL-005 - Cell UID: CEL-005 STATUS: Draft DOMAIN: Cell PARENT: SYS-001 RELATIONS (Parent): STATEMENT: Cell model parameters shall identify manufacturer, chemistry, revision and test conditions.
ACCEPTANCE: Model dataset contains provenance and temperature/current metadata.
METHOD: Inspection
VMODEL_LEVEL: Component
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
-
26. CEL-006 - Cell UID: CEL-006 STATUS: Draft DOMAIN: Cell PARENT: SYS-001 RELATIONS (Parent): STATEMENT: Cell selection shall include a defined matching and incoming quality procedure.
ACCEPTANCE: Incoming inspection evaluates approved capacity, resistance and visual criteria.
METHOD: Test
VMODEL_LEVEL: Component
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
-
51. MEC-001 - Mechanical UID: MEC-001 STATUS: Draft DOMAIN: Mechanical PARENT: SYS-001 RELATIONS (Parent): STATEMENT: The pack shall secure four cells in the declared CAD orientation.
ACCEPTANCE: Assembly fit-check agrees with released drawing and stack tolerances.
METHOD: Inspection
VMODEL_LEVEL: Subsystem
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
-
70. CAD-003 - CAD UID: CAD-003 STATUS: Draft DOMAIN: CAD PARENT: SYS-001 RELATIONS (Parent): STATEMENT: Each CAD cell shall reference an approved part geometry and tolerance set.
ACCEPTANCE: Part ID and dimensions match supplier drawing and imported material record.
METHOD: Inspection
VMODEL_LEVEL: Model
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
-
1. STK-001 - Stakeholder UID: STK-001 STATUS: Draft DOMAIN: Stakeholder RELATIONS (Child): STATEMENT: The product shall provide a replaceable 12.8 V nominal rechargeable energy source.
ACCEPTANCE: 4S1P LFP reference architecture reviewed against intended load.
METHOD: Review
VMODEL_LEVEL: Validation
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
The V1 reference energy shall be 256 Wh nominal.
4 × 3.2 V × 20 Ah = 256 Wh in approved reference model.
Analysis
System
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
-
37. ELE-010 - Electrical UID: ELE-010 STATUS: Draft DOMAIN: Electrical PARENT: SYS-002 RELATIONS (Parent): RELATIONS (Child): STATEMENT: Battery positive and negative polarity shall be unambiguous at external terminals.
ACCEPTANCE: Drawing, labels and as-built inspection agree.
METHOD: Inspection
VMODEL_LEVEL: Subsystem
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
HAZARD_IDS: HZ-004
EXECUTION: Not Run
-
2. STK-002 - Stakeholder UID: STK-002 STATUS: Draft DOMAIN: Stakeholder RELATIONS (Child): STATEMENT: The product shall support an agreed load and charger envelope.
ACCEPTANCE: Electrical load profile and charger profile approved with voltage/current/pulse ranges.
METHOD: Review
VMODEL_LEVEL: Validation
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
HAZARD_IDS: HZ-005
EXECUTION: Not Run
The V1 pack shall support 20 A continuous discharge at the specified ambient and SOC.
Validated steady-state load profile maintained without exceeding approved electrical/thermal limits.
Test
System
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
-
60. THM-001 - Thermal UID: THM-001 STATUS: Draft DOMAIN: Thermal PARENT: SYS-003 RELATIONS (Parent): STATEMENT: The thermal model shall represent resistive losses in cells and power path.
ACCEPTANCE: Energy balance and I²R term unit tests pass.
METHOD: Analysis
VMODEL_LEVEL: Model
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
-
61. THM-002 - Thermal UID: THM-002 STATUS: Draft DOMAIN: Thermal PARENT: SYS-003 RELATIONS (Parent): STATEMENT: The thermal model shall represent ambient convection and thermal contact paths.
ACCEPTANCE: Parameters and boundary conditions documented with units and sources.
METHOD: Inspection
VMODEL_LEVEL: Model
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
-
62. THM-003 - Thermal UID: THM-003 STATUS: Draft DOMAIN: Thermal PARENT: SYS-003 RELATIONS (Parent): STATEMENT: Thermal response shall be estimated for nominal load and agreed duty cycle.
ACCEPTANCE: Transient prediction and assumptions exported for each approved scenario.
METHOD: Analysis
VMODEL_LEVEL: Model
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
-
63. THM-004 - Thermal UID: THM-004 STATUS: Draft DOMAIN: Thermal PARENT: SYS-003 RELATIONS (Parent): STATEMENT: The hottest measured cell location shall be included in a validation plan.
ACCEPTANCE: Thermocouple map identifies expected hotspot and representative measurements.
METHOD: Inspection
VMODEL_LEVEL: System
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
-
64. THM-005 - Thermal UID: THM-005 STATUS: Draft DOMAIN: Thermal PARENT: SYS-003 RELATIONS (Parent): RELATIONS (Child): STATEMENT: Thermal simulation accuracy shall be assessed against measured pack temperatures.
ACCEPTANCE: Correlation error and uncertainty reported across >= 3 agreed load profiles.
METHOD: Test
VMODEL_LEVEL: System
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
TEST_IDS: TR-012
HAZARD_IDS: HZ-011
EXECUTION: Not Run
-
2. STK-002 - Stakeholder UID: STK-002 STATUS: Draft DOMAIN: Stakeholder RELATIONS (Child): STATEMENT: The product shall support an agreed load and charger envelope.
ACCEPTANCE: Electrical load profile and charger profile approved with voltage/current/pulse ranges.
METHOD: Review
VMODEL_LEVEL: Validation
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
HAZARD_IDS: HZ-005
EXECUTION: Not Run
The V1 pack shall support 10 A charging where the cell supplier permits.
Charge test at 10 A passes supplier temperature, voltage, and current limits.
Test
System
V1-12V
Must
Unassigned
Engineering target - proposed
HZ-005
Not Run
-
3. STK-003 - Stakeholder UID: STK-003 STATUS: Draft DOMAIN: Stakeholder RELATIONS (Child): STATEMENT: The product shall prevent hazardous electrical and thermal operating states.
ACCEPTANCE: Hazard review identifies controls and verification for each unacceptable risk.
METHOD: Review
VMODEL_LEVEL: Validation
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
- ELE-001 ELE-001 - Electrical (derives_from)
- ELE-002 ELE-002 - Electrical (derives_from)
- ELE-003 ELE-003 - Electrical (derives_from)
- ELE-004 ELE-004 - Electrical (derives_from)
- ELE-009 ELE-009 - Electrical (derives_from)
- ELE-011 ELE-011 - Electrical (derives_from)
- FW-001 FW-001 - Firmware (derives_from)
- FW-002 FW-002 - Firmware (derives_from)
- FW-007 FW-007 - Firmware (derives_from)
- FW-008 FW-008 - Firmware (derives_from)
- FW-011 FW-011 - Firmware (derives_from)
- THM-006 THM-006 - Thermal (derives_from)
- THM-007 THM-007 - Thermal (derives_from)
The pack shall interrupt charge/discharge according to the approved protection state table.
Each listed fault produces expected output state and recorded event.
Test
System
V1-12V
Must
Unassigned
Engineering target - proposed
TR-004, TR-005
HZ-001
Not Run
-
28. ELE-001 - Electrical UID: ELE-001 STATUS: Draft DOMAIN: Electrical PARENT: SYS-005 RELATIONS (Parent): RELATIONS (Child): STATEMENT: The system shall measure every series-cell voltage independently.
ACCEPTANCE: Four channels mapped and calibrated against reference instrument.
METHOD: Test
VMODEL_LEVEL: Subsystem
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
TEST_IDS: TR-002
HAZARD_IDS: HZ-001
EXECUTION: Not Run
-
29. ELE-002 - Electrical UID: ELE-002 STATUS: Draft DOMAIN: Electrical PARENT: SYS-005 RELATIONS (Parent): STATEMENT: Cell voltage measurement error shall remain within the approved error budget.
ACCEPTANCE: Measured worst-case absolute error <= frozen sensing accuracy budget.
METHOD: Test
VMODEL_LEVEL: Subsystem
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
TEST_IDS: TR-003
EXECUTION: Not Run
-
30. ELE-003 - Electrical UID: ELE-003 STATUS: Draft DOMAIN: Electrical PARENT: SYS-005 RELATIONS (Parent): RELATIONS (Child): STATEMENT: Pack current shall be measured in both charge and discharge directions.
ACCEPTANCE: Calibrated positive and negative currents within approved sensing error budget.
METHOD: Test
VMODEL_LEVEL: Subsystem
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
-
31. ELE-004 - Electrical UID: ELE-004 STATUS: Draft DOMAIN: Electrical PARENT: SYS-005 RELATIONS (Parent): STATEMENT: The system shall detect an open cell-sense lead or enter a defined safe state.
ACCEPTANCE: Each applicable sense-lead disconnect produces mapped fault/safe state.
METHOD: Test
VMODEL_LEVEL: Subsystem
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
TEST_IDS: TR-006
HAZARD_IDS: HZ-008
EXECUTION: Not Run
-
36. ELE-009 - Electrical UID: ELE-009 STATUS: Draft DOMAIN: Electrical PARENT: SYS-005 RELATIONS (Parent): RELATIONS (Child): STATEMENT: The BMS shall support a documented balancing strategy.
ACCEPTANCE: Balancing activation, inhibition, current and thermal budget tested.
METHOD: Test
VMODEL_LEVEL: Subsystem
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
TEST_IDS: TR-011
EXECUTION: Not Run
-
38. ELE-011 - Electrical UID: ELE-011 STATUS: Draft DOMAIN: Electrical PARENT: SYS-005 RELATIONS (Parent): STATEMENT: BMS power consumption shall remain within an approved storage and standby budget.
ACCEPTANCE: Measured operating/sleep current versus frozen current budget.
METHOD: Test
VMODEL_LEVEL: Subsystem
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
-
39. FW-001 - Firmware UID: FW-001 STATUS: Draft DOMAIN: Firmware PARENT: SYS-005 RELATIONS (Parent): STATEMENT: The firmware shall implement explicit INIT, IDLE, CHARGE, DISCHARGE, FAULT and SLEEP states.
ACCEPTANCE: All allowed and forbidden transitions covered by automated state table tests.
METHOD: Test
VMODEL_LEVEL: Software
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
TEST_IDS: TR-008
EXECUTION: Not Run
-
40. FW-002 - Firmware UID: FW-002 STATUS: Draft DOMAIN: Firmware PARENT: SYS-005 RELATIONS (Parent): STATEMENT: The firmware shall not override autonomous hardware protection to enable unsafe current.
ACCEPTANCE: Fault injection demonstrates external commands cannot bypass hardware protection.
METHOD: Test
VMODEL_LEVEL: Software
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
TEST_IDS: TR-009
HAZARD_IDS: HZ-012
EXECUTION: Not Run
-
45. FW-007 - Firmware UID: FW-007 STATUS: Draft DOMAIN: Firmware PARENT: SYS-005 RELATIONS (Parent): STATEMENT: The firmware shall retain a fault cause across a reset when specified by fault policy.
ACCEPTANCE: Reset/power-cycle test demonstrates event persists until authorized clearing.
METHOD: Test
VMODEL_LEVEL: Software
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
-
46. FW-008 - Firmware UID: FW-008 STATUS: Draft DOMAIN: Firmware PARENT: SYS-005 RELATIONS (Parent): STATEMENT: The firmware shall detect stalled critical tasks through watchdog supervision.
ACCEPTANCE: Injected task stall leads to defined fail-safe outcome.
METHOD: Test
VMODEL_LEVEL: Software
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
HAZARD_IDS: HZ-012
EXECUTION: Not Run
-
49. FW-011 - Firmware UID: FW-011 STATUS: Draft DOMAIN: Firmware PARENT: SYS-005 RELATIONS (Parent): STATEMENT: The firmware shall detect stale or invalid temperature data.
ACCEPTANCE: Loss/stuck-sensor simulated; safe-state policy passes all defined cases.
METHOD: Test
VMODEL_LEVEL: Software
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
HAZARD_IDS: HZ-006
EXECUTION: Not Run
-
65. THM-006 - Thermal UID: THM-006 STATUS: Draft DOMAIN: Thermal PARENT: SYS-005 RELATIONS (Parent): STATEMENT: The BMS shall block charging outside the permitted cell thermal range.
ACCEPTANCE: Boundary fault test shows expected cutoff and recovery behavior.
METHOD: Test
VMODEL_LEVEL: System
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
HAZARD_IDS: HZ-006
EXECUTION: Not Run
-
66. THM-007 - Thermal UID: THM-007 STATUS: Draft DOMAIN: Thermal PARENT: SYS-005 RELATIONS (Parent): STATEMENT: The BMS shall block discharge outside the permitted cell thermal range.
ACCEPTANCE: Boundary fault test shows expected cutoff and recovery behavior.
METHOD: Test
VMODEL_LEVEL: System
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
-
3. STK-003 - Stakeholder UID: STK-003 STATUS: Draft DOMAIN: Stakeholder RELATIONS (Child): STATEMENT: The product shall prevent hazardous electrical and thermal operating states.
ACCEPTANCE: Hazard review identifies controls and verification for each unacceptable risk.
METHOD: Review
VMODEL_LEVEL: Validation
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
Pack overcurrent/short-circuit protection shall not depend on a cloud connection.
Connectivity removed; hardware protection remains functional in supervised bench test.
Test
System
V1-12V
Must
Unassigned
Engineering target - proposed
TR-007
HZ-002
Not Run
-
3. STK-003 - Stakeholder UID: STK-003 STATUS: Draft DOMAIN: Stakeholder RELATIONS (Child): STATEMENT: The product shall prevent hazardous electrical and thermal operating states.
ACCEPTANCE: Hazard review identifies controls and verification for each unacceptable risk.
METHOD: Review
VMODEL_LEVEL: Validation
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
The pack shall incorporate a coordinated fuse and electronic protection concept.
Safety review validates fuse ratings, FET SOA, fault energy, wiring, and disconnection behavior.
Analysis
System
V1-12V
Must
Unassigned
Engineering target - proposed
HZ-002, HZ-007
Not Run
-
32. ELE-005 - Electrical UID: ELE-005 STATUS: Draft DOMAIN: Electrical PARENT: SYS-007 RELATIONS (Parent): STATEMENT: Protection switches shall withstand approved continuous, pulse and fault operating cases.
ACCEPTANCE: Thermal, SOA and transient calculations signed off; representative tests pass.
METHOD: Analysis
VMODEL_LEVEL: Subsystem
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
HAZARD_IDS: HZ-007
EXECUTION: Not Run
-
33. ELE-006 - Electrical UID: ELE-006 STATUS: Draft DOMAIN: Electrical PARENT: SYS-007 RELATIONS (Parent): STATEMENT: The battery shall have a fuse coordinated with conductor and fault energy limits.
ACCEPTANCE: Fuse I²t, expected prospective short current and conductor limits reviewed.
METHOD: Analysis
VMODEL_LEVEL: Subsystem
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
-
53. MEC-003 - Mechanical UID: MEC-003 STATUS: Draft DOMAIN: Mechanical PARENT: SYS-007 RELATIONS (Parent): RELATIONS (Child): STATEMENT: Electrical insulation shall prevent accidental busbar-enclosure contact in all specified tolerances.
ACCEPTANCE: CAD clearance check and physical inspection against frozen spacing standard.
METHOD: Inspection
VMODEL_LEVEL: Subsystem
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
HAZARD_IDS: HZ-003
EXECUTION: Not Run
-
56. MEC-006 - Mechanical UID: MEC-006 STATUS: Draft DOMAIN: Mechanical PARENT: SYS-007 RELATIONS (Parent): STATEMENT: Busbar fastening shall use controlled fastener and torque specifications.
ACCEPTANCE: Assembly inspection documents torque procedure, washer and locking approach.
METHOD: Inspection
VMODEL_LEVEL: Subsystem
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
TEST_IDS: TR-014
HAZARD_IDS: HZ-009
EXECUTION: Not Run
-
118. MFG-002 - Manufacturing UID: MFG-002 STATUS: Draft DOMAIN: Manufacturing PARENT: SYS-007 RELATIONS (Parent): STATEMENT: Pack terminal, fuse and busbar assembly shall have prescribed inspection checks.
ACCEPTANCE: EOL checklist verifies polarity, continuity and fastener records.
METHOD: Test
VMODEL_LEVEL: System
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
HAZARD_IDS: HZ-004
EXECUTION: Not Run
-
2. STK-002 - Stakeholder UID: STK-002 STATUS: Draft DOMAIN: Stakeholder RELATIONS (Child): STATEMENT: The product shall support an agreed load and charger envelope.
ACCEPTANCE: Electrical load profile and charger profile approved with voltage/current/pulse ranges.
METHOD: Review
VMODEL_LEVEL: Validation
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
HAZARD_IDS: HZ-005
EXECUTION: Not Run
The pack shall expose a defined service interface for diagnostics.
All protocol commands pass interface conformance tests.
Test
System
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
-
34. ELE-007 - Electrical UID: ELE-007 STATUS: Draft DOMAIN: Electrical PARENT: SYS-008 RELATIONS (Parent): STATEMENT: Diagnostic connector pinout shall be keyed and defined.
ACCEPTANCE: ICD and physical inspection show no ambiguous voltage/polarity connections.
METHOD: Inspection
VMODEL_LEVEL: Subsystem
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
-
43. FW-005 - Firmware UID: FW-005 STATUS: Draft DOMAIN: Firmware PARENT: SYS-008 RELATIONS (Parent): STATEMENT: The firmware shall expose versioned diagnostic telemetry.
ACCEPTANCE: Protocol tests validate schema, units, timestamps and version negotiation.
METHOD: Test
VMODEL_LEVEL: Software
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
-
47. FW-009 - Firmware UID: FW-009 STATUS: Draft DOMAIN: Firmware PARENT: SYS-008 RELATIONS (Parent): STATEMENT: The firmware shall reject malformed or unauthorized configuration commands.
ACCEPTANCE: Protocol negative and authorization tests reject invalid writes.
METHOD: Test
VMODEL_LEVEL: Software
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
-
50. FW-012 - Firmware UID: FW-012 STATUS: Draft DOMAIN: Firmware PARENT: SYS-008 RELATIONS (Parent): STATEMENT: The firmware shall support a controlled calibration data procedure.
ACCEPTANCE: Calibration revision and CRC verified; corrupt configuration rejected.
METHOD: Test
VMODEL_LEVEL: Software
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
-
9. STK-009 - Stakeholder UID: STK-009 STATUS: Draft DOMAIN: Stakeholder RELATIONS (Child): STATEMENT: The product shall meet the environmental and mechanical needs of its intended use.
ACCEPTANCE: Environmental profile and corresponding qualification plan approved.
METHOD: Review
VMODEL_LEVEL: Validation
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
- CEL-003 CEL-003 - Cell (derives_from)
- CEL-004 CEL-004 - Cell (derives_from)
- CEL-007 CEL-007 - Cell (derives_from)
- ELE-008 ELE-008 - Electrical (derives_from)
- MEC-002 MEC-002 - Mechanical (derives_from)
- MEC-004 MEC-004 - Mechanical (derives_from)
- MEC-005 MEC-005 - Mechanical (derives_from)
- MEC-008 MEC-008 - Mechanical (derives_from)
- MEC-009 MEC-009 - Mechanical (derives_from)
The pack shall comply with an approved system operating envelope.
Operating envelope table approved and full boundary-condition test coverage assigned.
Review
System
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
-
23. CEL-003 - Cell UID: CEL-003 STATUS: Draft DOMAIN: Cell PARENT: SYS-009 RELATIONS (Parent): STATEMENT: The design shall prevent cell operation outside supplier charge temperature limits.
ACCEPTANCE: Boundary test inhibits charge as required by frozen cell specification.
METHOD: Test
VMODEL_LEVEL: Component
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
-
24. CEL-004 - Cell UID: CEL-004 STATUS: Draft DOMAIN: Cell PARENT: SYS-009 RELATIONS (Parent): STATEMENT: The design shall prevent cell operation outside supplier discharge temperature limits.
ACCEPTANCE: Boundary test inhibits discharge as required by frozen cell specification.
METHOD: Test
VMODEL_LEVEL: Component
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
-
27. CEL-007 - Cell UID: CEL-007 STATUS: Draft DOMAIN: Cell PARENT: SYS-009 RELATIONS (Parent): STATEMENT: Cell compression and orientation shall conform to supplier mechanical limits.
ACCEPTANCE: Approved fixture and compression specification reviewed against supplier data.
METHOD: Inspection
VMODEL_LEVEL: Component
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
-
35. ELE-008 - Electrical UID: ELE-008 STATUS: Draft DOMAIN: Electrical PARENT: SYS-009 RELATIONS (Parent): STATEMENT: PCB creepage, clearance and trace geometry shall meet the approved design rules.
ACCEPTANCE: Automated DRC zero blockers; independent safety spacing review passed.
METHOD: Inspection
VMODEL_LEVEL: Subsystem
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
-
52. MEC-002 - Mechanical UID: MEC-002 STATUS: Draft DOMAIN: Mechanical PARENT: SYS-009 RELATIONS (Parent): STATEMENT: Cell restraints shall comply with the manufacturer compression limits.
ACCEPTANCE: Worst-case tolerance and clamping force verified against supplier envelope.
METHOD: Analysis
VMODEL_LEVEL: Subsystem
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
-
54. MEC-004 - Mechanical UID: MEC-004 STATUS: Draft DOMAIN: Mechanical PARENT: SYS-009 RELATIONS (Parent): RELATIONS (Child): STATEMENT: The enclosure shall withstand the approved static mounting loads.
ACCEPTANCE: FEA and representative physical fixture test meet displacement/stress criteria.
METHOD: Test
VMODEL_LEVEL: Subsystem
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
HAZARD_IDS: HZ-010
EXECUTION: Not Run
-
55. MEC-005 - Mechanical UID: MEC-005 STATUS: Draft DOMAIN: Mechanical PARENT: SYS-009 RELATIONS (Parent): RELATIONS (Child): STATEMENT: The mounting design shall avoid unacceptable resonances in the operational vibration profile.
ACCEPTANCE: Modal test correlated to model; resonant response compared to approved limits.
METHOD: Test
VMODEL_LEVEL: Subsystem
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
TEST_IDS: TR-013
HAZARD_IDS: HZ-009, HZ-010
EXECUTION: Not Run
-
58. MEC-008 - Mechanical UID: MEC-008 STATUS: Draft DOMAIN: Mechanical PARENT: SYS-009 RELATIONS (Parent): STATEMENT: Mechanical BOM mass shall match CAD estimate within the approved discrepancy limit.
ACCEPTANCE: As-built pack mass reconciled to CAD/material mass budget.
METHOD: Test
VMODEL_LEVEL: System
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
-
59. MEC-009 - Mechanical UID: MEC-009 STATUS: Draft DOMAIN: Mechanical PARENT: SYS-009 RELATIONS (Parent): STATEMENT: Critical dimensions and tolerances shall be present in manufacturing drawings.
ACCEPTANCE: Drawing review verifies dimensions, datum strategy, tolerances and revision labels.
METHOD: Inspection
VMODEL_LEVEL: Subsystem
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
-
5. STK-005 - Stakeholder UID: STK-005 STATUS: Draft DOMAIN: Stakeholder RELATIONS (Child): - SYS-010 SYS-010 - System (derives_from)
- FW-010 FW-010 - Firmware (derives_from)
- CAD-001 CAD-001 - CAD (derives_from)
- CAD-007 CAD-007 - CAD (derives_from)
- SIM-001 SIM-001 - Simulation (derives_from)
- SIM-002 SIM-002 - Simulation (derives_from)
- SIM-003 SIM-003 - Simulation (derives_from)
- SIM-004 SIM-004 - Simulation (derives_from)
- SIM-005 SIM-005 - Simulation (derives_from)
- SIM-010 SIM-010 - Simulation (derives_from)
- PLT-004 PLT-004 - Platform (derives_from)
- PLT-006 PLT-006 - Platform (derives_from)
- PLT-010 PLT-010 - Platform (derives_from)
- PLT-011 PLT-011 - Platform (derives_from)
- PLT-013 PLT-013 - Platform (derives_from)
- VER-001 VER-001 - Verification (derives_from)
- VER-002 VER-002 - Verification (derives_from)
- VER-003 VER-003 - Verification (derives_from)
- VER-004 VER-004 - Verification (derives_from)
- VER-005 VER-005 - Verification (derives_from)
- VER-006 VER-006 - Verification (derives_from)
- VER-007 VER-007 - Verification (derives_from)
- VER-008 VER-008 - Verification (derives_from)
- VER-009 VER-009 - Verification (derives_from)
- VER-010 VER-010 - Verification (derives_from)
- MFG-003 MFG-003 - Manufacturing (derives_from)
- MFG-006 MFG-006 - Manufacturing (derives_from)
STATEMENT: The platform shall trace design decisions to requirements and verification evidence.
ACCEPTANCE: Sample 10 requirements traced bidirectionally through implementation and test reports.
METHOD: Inspection
VMODEL_LEVEL: Validation
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
Every completed system test shall identify the tested hardware and firmware revisions.
Test artifacts contain immutable HW rev, FW hash, instrument calibration, date.
Inspection
System
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
-
11. SYS-001 - System UID: SYS-001 STATUS: Draft DOMAIN: System PARENT: STK-001 RELATIONS (Parent): RELATIONS (Child): STATEMENT: The V1 pack shall contain four LFP cells connected in series.
ACCEPTANCE: As-built cell count=4 and measured polarity/topology matches schematic.
METHOD: Inspection
VMODEL_LEVEL: System
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
TEST_IDS: TR-001
EXECUTION: Not Run
Each cell shall be traceable to an approved manufacturer and part number.
Serial/lot, source datasheet and supplier documented for every prototype cell.
Inspection
Component
V1-12V
Must
Unassigned
Engineering target - proposed
HZ-003
Not Run
-
11. SYS-001 - System UID: SYS-001 STATUS: Draft DOMAIN: System PARENT: STK-001 RELATIONS (Parent): RELATIONS (Child): STATEMENT: The V1 pack shall contain four LFP cells connected in series.
ACCEPTANCE: As-built cell count=4 and measured polarity/topology matches schematic.
METHOD: Inspection
VMODEL_LEVEL: System
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
TEST_IDS: TR-001
EXECUTION: Not Run
The selected cell shall provide at least 20 Ah nominal capacity under its specified conditions.
Manufacturer spec confirmed and capacity acceptance test method approved.
Test
Component
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
-
19. SYS-009 - System UID: SYS-009 STATUS: Draft DOMAIN: System PARENT: STK-009 RELATIONS (Parent): RELATIONS (Child): - CEL-003 CEL-003 - Cell (derives_from)
- CEL-004 CEL-004 - Cell (derives_from)
- CEL-007 CEL-007 - Cell (derives_from)
- ELE-008 ELE-008 - Electrical (derives_from)
- MEC-002 MEC-002 - Mechanical (derives_from)
- MEC-004 MEC-004 - Mechanical (derives_from)
- MEC-005 MEC-005 - Mechanical (derives_from)
- MEC-008 MEC-008 - Mechanical (derives_from)
- MEC-009 MEC-009 - Mechanical (derives_from)
STATEMENT: The pack shall comply with an approved system operating envelope.
ACCEPTANCE: Operating envelope table approved and full boundary-condition test coverage assigned.
METHOD: Review
VMODEL_LEVEL: System
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
The design shall prevent cell operation outside supplier charge temperature limits.
Boundary test inhibits charge as required by frozen cell specification.
Test
Component
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
-
19. SYS-009 - System UID: SYS-009 STATUS: Draft DOMAIN: System PARENT: STK-009 RELATIONS (Parent): RELATIONS (Child): - CEL-003 CEL-003 - Cell (derives_from)
- CEL-004 CEL-004 - Cell (derives_from)
- CEL-007 CEL-007 - Cell (derives_from)
- ELE-008 ELE-008 - Electrical (derives_from)
- MEC-002 MEC-002 - Mechanical (derives_from)
- MEC-004 MEC-004 - Mechanical (derives_from)
- MEC-005 MEC-005 - Mechanical (derives_from)
- MEC-008 MEC-008 - Mechanical (derives_from)
- MEC-009 MEC-009 - Mechanical (derives_from)
STATEMENT: The pack shall comply with an approved system operating envelope.
ACCEPTANCE: Operating envelope table approved and full boundary-condition test coverage assigned.
METHOD: Review
VMODEL_LEVEL: System
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
The design shall prevent cell operation outside supplier discharge temperature limits.
Boundary test inhibits discharge as required by frozen cell specification.
Test
Component
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
-
11. SYS-001 - System UID: SYS-001 STATUS: Draft DOMAIN: System PARENT: STK-001 RELATIONS (Parent): RELATIONS (Child): STATEMENT: The V1 pack shall contain four LFP cells connected in series.
ACCEPTANCE: As-built cell count=4 and measured polarity/topology matches schematic.
METHOD: Inspection
VMODEL_LEVEL: System
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
TEST_IDS: TR-001
EXECUTION: Not Run
Cell model parameters shall identify manufacturer, chemistry, revision and test conditions.
Model dataset contains provenance and temperature/current metadata.
Inspection
Component
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
-
11. SYS-001 - System UID: SYS-001 STATUS: Draft DOMAIN: System PARENT: STK-001 RELATIONS (Parent): RELATIONS (Child): STATEMENT: The V1 pack shall contain four LFP cells connected in series.
ACCEPTANCE: As-built cell count=4 and measured polarity/topology matches schematic.
METHOD: Inspection
VMODEL_LEVEL: System
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
TEST_IDS: TR-001
EXECUTION: Not Run
Cell selection shall include a defined matching and incoming quality procedure.
Incoming inspection evaluates approved capacity, resistance and visual criteria.
Test
Component
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
-
19. SYS-009 - System UID: SYS-009 STATUS: Draft DOMAIN: System PARENT: STK-009 RELATIONS (Parent): RELATIONS (Child): - CEL-003 CEL-003 - Cell (derives_from)
- CEL-004 CEL-004 - Cell (derives_from)
- CEL-007 CEL-007 - Cell (derives_from)
- ELE-008 ELE-008 - Electrical (derives_from)
- MEC-002 MEC-002 - Mechanical (derives_from)
- MEC-004 MEC-004 - Mechanical (derives_from)
- MEC-005 MEC-005 - Mechanical (derives_from)
- MEC-008 MEC-008 - Mechanical (derives_from)
- MEC-009 MEC-009 - Mechanical (derives_from)
STATEMENT: The pack shall comply with an approved system operating envelope.
ACCEPTANCE: Operating envelope table approved and full boundary-condition test coverage assigned.
METHOD: Review
VMODEL_LEVEL: System
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
Cell compression and orientation shall conform to supplier mechanical limits.
Approved fixture and compression specification reviewed against supplier data.
Inspection
Component
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
-
15. SYS-005 - System UID: SYS-005 STATUS: Draft DOMAIN: System PARENT: STK-003 RELATIONS (Parent): RELATIONS (Child): - ELE-001 ELE-001 - Electrical (derives_from)
- ELE-002 ELE-002 - Electrical (derives_from)
- ELE-003 ELE-003 - Electrical (derives_from)
- ELE-004 ELE-004 - Electrical (derives_from)
- ELE-009 ELE-009 - Electrical (derives_from)
- ELE-011 ELE-011 - Electrical (derives_from)
- FW-001 FW-001 - Firmware (derives_from)
- FW-002 FW-002 - Firmware (derives_from)
- FW-007 FW-007 - Firmware (derives_from)
- FW-008 FW-008 - Firmware (derives_from)
- FW-011 FW-011 - Firmware (derives_from)
- THM-006 THM-006 - Thermal (derives_from)
- THM-007 THM-007 - Thermal (derives_from)
STATEMENT: The pack shall interrupt charge/discharge according to the approved protection state table.
ACCEPTANCE: Each listed fault produces expected output state and recorded event.
METHOD: Test
VMODEL_LEVEL: System
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
TEST_IDS: TR-004, TR-005
HAZARD_IDS: HZ-001
EXECUTION: Not Run
The system shall measure every series-cell voltage independently.
Four channels mapped and calibrated against reference instrument.
Test
Subsystem
V1-12V
Must
Unassigned
Engineering target - proposed
TR-002
HZ-001
Not Run
-
41. FW-003 - Firmware UID: FW-003 STATUS: Draft DOMAIN: Firmware PARENT: ELE-001 RELATIONS (Parent): STATEMENT: The firmware shall acquire and validate per-cell voltage samples.
ACCEPTANCE: Unit tests cover scaling, range checking, invalid data and stale samples.
METHOD: Test
VMODEL_LEVEL: Software
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
-
15. SYS-005 - System UID: SYS-005 STATUS: Draft DOMAIN: System PARENT: STK-003 RELATIONS (Parent): RELATIONS (Child): - ELE-001 ELE-001 - Electrical (derives_from)
- ELE-002 ELE-002 - Electrical (derives_from)
- ELE-003 ELE-003 - Electrical (derives_from)
- ELE-004 ELE-004 - Electrical (derives_from)
- ELE-009 ELE-009 - Electrical (derives_from)
- ELE-011 ELE-011 - Electrical (derives_from)
- FW-001 FW-001 - Firmware (derives_from)
- FW-002 FW-002 - Firmware (derives_from)
- FW-007 FW-007 - Firmware (derives_from)
- FW-008 FW-008 - Firmware (derives_from)
- FW-011 FW-011 - Firmware (derives_from)
- THM-006 THM-006 - Thermal (derives_from)
- THM-007 THM-007 - Thermal (derives_from)
STATEMENT: The pack shall interrupt charge/discharge according to the approved protection state table.
ACCEPTANCE: Each listed fault produces expected output state and recorded event.
METHOD: Test
VMODEL_LEVEL: System
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
TEST_IDS: TR-004, TR-005
HAZARD_IDS: HZ-001
EXECUTION: Not Run
Cell voltage measurement error shall remain within the approved error budget.
Measured worst-case absolute error <= frozen sensing accuracy budget.
Test
Subsystem
V1-12V
Must
Unassigned
Engineering target - proposed
TR-003
Not Run
-
15. SYS-005 - System UID: SYS-005 STATUS: Draft DOMAIN: System PARENT: STK-003 RELATIONS (Parent): RELATIONS (Child): - ELE-001 ELE-001 - Electrical (derives_from)
- ELE-002 ELE-002 - Electrical (derives_from)
- ELE-003 ELE-003 - Electrical (derives_from)
- ELE-004 ELE-004 - Electrical (derives_from)
- ELE-009 ELE-009 - Electrical (derives_from)
- ELE-011 ELE-011 - Electrical (derives_from)
- FW-001 FW-001 - Firmware (derives_from)
- FW-002 FW-002 - Firmware (derives_from)
- FW-007 FW-007 - Firmware (derives_from)
- FW-008 FW-008 - Firmware (derives_from)
- FW-011 FW-011 - Firmware (derives_from)
- THM-006 THM-006 - Thermal (derives_from)
- THM-007 THM-007 - Thermal (derives_from)
STATEMENT: The pack shall interrupt charge/discharge according to the approved protection state table.
ACCEPTANCE: Each listed fault produces expected output state and recorded event.
METHOD: Test
VMODEL_LEVEL: System
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
TEST_IDS: TR-004, TR-005
HAZARD_IDS: HZ-001
EXECUTION: Not Run
Pack current shall be measured in both charge and discharge directions.
Calibrated positive and negative currents within approved sensing error budget.
Test
Subsystem
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
-
42. FW-004 - Firmware UID: FW-004 STATUS: Draft DOMAIN: Firmware PARENT: ELE-003 RELATIONS (Parent): STATEMENT: The firmware shall maintain a signed coulomb-counting current integral.
ACCEPTANCE: Synthetic charge/discharge traces reproduce expected integrated Ah within numerical tolerance.
METHOD: Test
VMODEL_LEVEL: Software
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
TEST_IDS: TR-010
EXECUTION: Not Run
-
15. SYS-005 - System UID: SYS-005 STATUS: Draft DOMAIN: System PARENT: STK-003 RELATIONS (Parent): RELATIONS (Child): - ELE-001 ELE-001 - Electrical (derives_from)
- ELE-002 ELE-002 - Electrical (derives_from)
- ELE-003 ELE-003 - Electrical (derives_from)
- ELE-004 ELE-004 - Electrical (derives_from)
- ELE-009 ELE-009 - Electrical (derives_from)
- ELE-011 ELE-011 - Electrical (derives_from)
- FW-001 FW-001 - Firmware (derives_from)
- FW-002 FW-002 - Firmware (derives_from)
- FW-007 FW-007 - Firmware (derives_from)
- FW-008 FW-008 - Firmware (derives_from)
- FW-011 FW-011 - Firmware (derives_from)
- THM-006 THM-006 - Thermal (derives_from)
- THM-007 THM-007 - Thermal (derives_from)
STATEMENT: The pack shall interrupt charge/discharge according to the approved protection state table.
ACCEPTANCE: Each listed fault produces expected output state and recorded event.
METHOD: Test
VMODEL_LEVEL: System
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
TEST_IDS: TR-004, TR-005
HAZARD_IDS: HZ-001
EXECUTION: Not Run
The system shall detect an open cell-sense lead or enter a defined safe state.
Each applicable sense-lead disconnect produces mapped fault/safe state.
Test
Subsystem
V1-12V
Must
Unassigned
Engineering target - proposed
TR-006
HZ-008
Not Run
-
17. SYS-007 - System UID: SYS-007 STATUS: Draft DOMAIN: System PARENT: STK-003 RELATIONS (Parent): RELATIONS (Child): STATEMENT: The pack shall incorporate a coordinated fuse and electronic protection concept.
ACCEPTANCE: Safety review validates fuse ratings, FET SOA, fault energy, wiring, and disconnection behavior.
METHOD: Analysis
VMODEL_LEVEL: System
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
HAZARD_IDS: HZ-002, HZ-007
EXECUTION: Not Run
Protection switches shall withstand approved continuous, pulse and fault operating cases.
Thermal, SOA and transient calculations signed off; representative tests pass.
Analysis
Subsystem
V1-12V
Must
Unassigned
Engineering target - proposed
HZ-007
Not Run
-
17. SYS-007 - System UID: SYS-007 STATUS: Draft DOMAIN: System PARENT: STK-003 RELATIONS (Parent): RELATIONS (Child): STATEMENT: The pack shall incorporate a coordinated fuse and electronic protection concept.
ACCEPTANCE: Safety review validates fuse ratings, FET SOA, fault energy, wiring, and disconnection behavior.
METHOD: Analysis
VMODEL_LEVEL: System
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
HAZARD_IDS: HZ-002, HZ-007
EXECUTION: Not Run
The battery shall have a fuse coordinated with conductor and fault energy limits.
Fuse I²t, expected prospective short current and conductor limits reviewed.
Analysis
Subsystem
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
-
18. SYS-008 - System UID: SYS-008 STATUS: Draft DOMAIN: System PARENT: STK-002 RELATIONS (Parent): RELATIONS (Child): STATEMENT: The pack shall expose a defined service interface for diagnostics.
ACCEPTANCE: All protocol commands pass interface conformance tests.
METHOD: Test
VMODEL_LEVEL: System
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
Diagnostic connector pinout shall be keyed and defined.
ICD and physical inspection show no ambiguous voltage/polarity connections.
Inspection
Subsystem
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
-
19. SYS-009 - System UID: SYS-009 STATUS: Draft DOMAIN: System PARENT: STK-009 RELATIONS (Parent): RELATIONS (Child): - CEL-003 CEL-003 - Cell (derives_from)
- CEL-004 CEL-004 - Cell (derives_from)
- CEL-007 CEL-007 - Cell (derives_from)
- ELE-008 ELE-008 - Electrical (derives_from)
- MEC-002 MEC-002 - Mechanical (derives_from)
- MEC-004 MEC-004 - Mechanical (derives_from)
- MEC-005 MEC-005 - Mechanical (derives_from)
- MEC-008 MEC-008 - Mechanical (derives_from)
- MEC-009 MEC-009 - Mechanical (derives_from)
STATEMENT: The pack shall comply with an approved system operating envelope.
ACCEPTANCE: Operating envelope table approved and full boundary-condition test coverage assigned.
METHOD: Review
VMODEL_LEVEL: System
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
PCB creepage, clearance and trace geometry shall meet the approved design rules.
Automated DRC zero blockers; independent safety spacing review passed.
Inspection
Subsystem
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
-
15. SYS-005 - System UID: SYS-005 STATUS: Draft DOMAIN: System PARENT: STK-003 RELATIONS (Parent): RELATIONS (Child): - ELE-001 ELE-001 - Electrical (derives_from)
- ELE-002 ELE-002 - Electrical (derives_from)
- ELE-003 ELE-003 - Electrical (derives_from)
- ELE-004 ELE-004 - Electrical (derives_from)
- ELE-009 ELE-009 - Electrical (derives_from)
- ELE-011 ELE-011 - Electrical (derives_from)
- FW-001 FW-001 - Firmware (derives_from)
- FW-002 FW-002 - Firmware (derives_from)
- FW-007 FW-007 - Firmware (derives_from)
- FW-008 FW-008 - Firmware (derives_from)
- FW-011 FW-011 - Firmware (derives_from)
- THM-006 THM-006 - Thermal (derives_from)
- THM-007 THM-007 - Thermal (derives_from)
STATEMENT: The pack shall interrupt charge/discharge according to the approved protection state table.
ACCEPTANCE: Each listed fault produces expected output state and recorded event.
METHOD: Test
VMODEL_LEVEL: System
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
TEST_IDS: TR-004, TR-005
HAZARD_IDS: HZ-001
EXECUTION: Not Run
The BMS shall support a documented balancing strategy.
Balancing activation, inhibition, current and thermal budget tested.
Test
Subsystem
V1-12V
Must
Unassigned
Engineering target - proposed
TR-011
Not Run
-
44. FW-006 - Firmware UID: FW-006 STATUS: Draft DOMAIN: Firmware PARENT: ELE-009 RELATIONS (Parent): STATEMENT: The firmware shall inhibit balancing under disallowed thermal/electrical states.
ACCEPTANCE: State-based tests cover all balancing inhibit conditions.
METHOD: Test
VMODEL_LEVEL: Software
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
-
67. THM-008 - Thermal UID: THM-008 STATUS: Draft DOMAIN: Thermal PARENT: ELE-009 RELATIONS (Parent): STATEMENT: Cell balancing heat shall be represented in BMS thermal budget.
ACCEPTANCE: Worst-case balancing condition analysed and design review approved.
METHOD: Analysis
VMODEL_LEVEL: Subsystem
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
-
12. SYS-002 - System UID: SYS-002 STATUS: Draft DOMAIN: System PARENT: STK-001 RELATIONS (Parent): RELATIONS (Child): STATEMENT: The V1 reference energy shall be 256 Wh nominal.
ACCEPTANCE: 4 × 3.2 V × 20 Ah = 256 Wh in approved reference model.
METHOD: Analysis
VMODEL_LEVEL: System
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
Battery positive and negative polarity shall be unambiguous at external terminals.
Drawing, labels and as-built inspection agree.
Inspection
Subsystem
V1-12V
Must
Unassigned
Engineering target - proposed
HZ-004
Not Run
-
71. CAD-004 - CAD UID: CAD-004 STATUS: Draft DOMAIN: CAD PARENT: ELE-010 RELATIONS (Parent): STATEMENT: The CAD assembly shall include terminals, busbars, BMS board, restraints and enclosure.
ACCEPTANCE: Released exploded assembly lists every defined subassembly.
METHOD: Inspection
VMODEL_LEVEL: Model
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
-
15. SYS-005 - System UID: SYS-005 STATUS: Draft DOMAIN: System PARENT: STK-003 RELATIONS (Parent): RELATIONS (Child): - ELE-001 ELE-001 - Electrical (derives_from)
- ELE-002 ELE-002 - Electrical (derives_from)
- ELE-003 ELE-003 - Electrical (derives_from)
- ELE-004 ELE-004 - Electrical (derives_from)
- ELE-009 ELE-009 - Electrical (derives_from)
- ELE-011 ELE-011 - Electrical (derives_from)
- FW-001 FW-001 - Firmware (derives_from)
- FW-002 FW-002 - Firmware (derives_from)
- FW-007 FW-007 - Firmware (derives_from)
- FW-008 FW-008 - Firmware (derives_from)
- FW-011 FW-011 - Firmware (derives_from)
- THM-006 THM-006 - Thermal (derives_from)
- THM-007 THM-007 - Thermal (derives_from)
STATEMENT: The pack shall interrupt charge/discharge according to the approved protection state table.
ACCEPTANCE: Each listed fault produces expected output state and recorded event.
METHOD: Test
VMODEL_LEVEL: System
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
TEST_IDS: TR-004, TR-005
HAZARD_IDS: HZ-001
EXECUTION: Not Run
BMS power consumption shall remain within an approved storage and standby budget.
Measured operating/sleep current versus frozen current budget.
Test
Subsystem
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
-
15. SYS-005 - System UID: SYS-005 STATUS: Draft DOMAIN: System PARENT: STK-003 RELATIONS (Parent): RELATIONS (Child): - ELE-001 ELE-001 - Electrical (derives_from)
- ELE-002 ELE-002 - Electrical (derives_from)
- ELE-003 ELE-003 - Electrical (derives_from)
- ELE-004 ELE-004 - Electrical (derives_from)
- ELE-009 ELE-009 - Electrical (derives_from)
- ELE-011 ELE-011 - Electrical (derives_from)
- FW-001 FW-001 - Firmware (derives_from)
- FW-002 FW-002 - Firmware (derives_from)
- FW-007 FW-007 - Firmware (derives_from)
- FW-008 FW-008 - Firmware (derives_from)
- FW-011 FW-011 - Firmware (derives_from)
- THM-006 THM-006 - Thermal (derives_from)
- THM-007 THM-007 - Thermal (derives_from)
STATEMENT: The pack shall interrupt charge/discharge according to the approved protection state table.
ACCEPTANCE: Each listed fault produces expected output state and recorded event.
METHOD: Test
VMODEL_LEVEL: System
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
TEST_IDS: TR-004, TR-005
HAZARD_IDS: HZ-001
EXECUTION: Not Run
The firmware shall implement explicit INIT, IDLE, CHARGE, DISCHARGE, FAULT and SLEEP states.
All allowed and forbidden transitions covered by automated state table tests.
Test
Software
V1-12V
Must
Unassigned
Engineering target - proposed
TR-008
Not Run
-
15. SYS-005 - System UID: SYS-005 STATUS: Draft DOMAIN: System PARENT: STK-003 RELATIONS (Parent): RELATIONS (Child): - ELE-001 ELE-001 - Electrical (derives_from)
- ELE-002 ELE-002 - Electrical (derives_from)
- ELE-003 ELE-003 - Electrical (derives_from)
- ELE-004 ELE-004 - Electrical (derives_from)
- ELE-009 ELE-009 - Electrical (derives_from)
- ELE-011 ELE-011 - Electrical (derives_from)
- FW-001 FW-001 - Firmware (derives_from)
- FW-002 FW-002 - Firmware (derives_from)
- FW-007 FW-007 - Firmware (derives_from)
- FW-008 FW-008 - Firmware (derives_from)
- FW-011 FW-011 - Firmware (derives_from)
- THM-006 THM-006 - Thermal (derives_from)
- THM-007 THM-007 - Thermal (derives_from)
STATEMENT: The pack shall interrupt charge/discharge according to the approved protection state table.
ACCEPTANCE: Each listed fault produces expected output state and recorded event.
METHOD: Test
VMODEL_LEVEL: System
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
TEST_IDS: TR-004, TR-005
HAZARD_IDS: HZ-001
EXECUTION: Not Run
The firmware shall not override autonomous hardware protection to enable unsafe current.
Fault injection demonstrates external commands cannot bypass hardware protection.
Test
Software
V1-12V
Must
Unassigned
Engineering target - proposed
TR-009
HZ-012
Not Run
-
28. ELE-001 - Electrical UID: ELE-001 STATUS: Draft DOMAIN: Electrical PARENT: SYS-005 RELATIONS (Parent): RELATIONS (Child): STATEMENT: The system shall measure every series-cell voltage independently.
ACCEPTANCE: Four channels mapped and calibrated against reference instrument.
METHOD: Test
VMODEL_LEVEL: Subsystem
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
TEST_IDS: TR-002
HAZARD_IDS: HZ-001
EXECUTION: Not Run
The firmware shall acquire and validate per-cell voltage samples.
Unit tests cover scaling, range checking, invalid data and stale samples.
Test
Software
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
-
30. ELE-003 - Electrical UID: ELE-003 STATUS: Draft DOMAIN: Electrical PARENT: SYS-005 RELATIONS (Parent): RELATIONS (Child): STATEMENT: Pack current shall be measured in both charge and discharge directions.
ACCEPTANCE: Calibrated positive and negative currents within approved sensing error budget.
METHOD: Test
VMODEL_LEVEL: Subsystem
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
The firmware shall maintain a signed coulomb-counting current integral.
Synthetic charge/discharge traces reproduce expected integrated Ah within numerical tolerance.
Test
Software
V1-12V
Must
Unassigned
Engineering target - proposed
TR-010
Not Run
-
18. SYS-008 - System UID: SYS-008 STATUS: Draft DOMAIN: System PARENT: STK-002 RELATIONS (Parent): RELATIONS (Child): STATEMENT: The pack shall expose a defined service interface for diagnostics.
ACCEPTANCE: All protocol commands pass interface conformance tests.
METHOD: Test
VMODEL_LEVEL: System
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
The firmware shall expose versioned diagnostic telemetry.
Protocol tests validate schema, units, timestamps and version negotiation.
Test
Software
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
-
36. ELE-009 - Electrical UID: ELE-009 STATUS: Draft DOMAIN: Electrical PARENT: SYS-005 RELATIONS (Parent): RELATIONS (Child): STATEMENT: The BMS shall support a documented balancing strategy.
ACCEPTANCE: Balancing activation, inhibition, current and thermal budget tested.
METHOD: Test
VMODEL_LEVEL: Subsystem
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
TEST_IDS: TR-011
EXECUTION: Not Run
The firmware shall inhibit balancing under disallowed thermal/electrical states.
State-based tests cover all balancing inhibit conditions.
Test
Software
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
-
15. SYS-005 - System UID: SYS-005 STATUS: Draft DOMAIN: System PARENT: STK-003 RELATIONS (Parent): RELATIONS (Child): - ELE-001 ELE-001 - Electrical (derives_from)
- ELE-002 ELE-002 - Electrical (derives_from)
- ELE-003 ELE-003 - Electrical (derives_from)
- ELE-004 ELE-004 - Electrical (derives_from)
- ELE-009 ELE-009 - Electrical (derives_from)
- ELE-011 ELE-011 - Electrical (derives_from)
- FW-001 FW-001 - Firmware (derives_from)
- FW-002 FW-002 - Firmware (derives_from)
- FW-007 FW-007 - Firmware (derives_from)
- FW-008 FW-008 - Firmware (derives_from)
- FW-011 FW-011 - Firmware (derives_from)
- THM-006 THM-006 - Thermal (derives_from)
- THM-007 THM-007 - Thermal (derives_from)
STATEMENT: The pack shall interrupt charge/discharge according to the approved protection state table.
ACCEPTANCE: Each listed fault produces expected output state and recorded event.
METHOD: Test
VMODEL_LEVEL: System
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
TEST_IDS: TR-004, TR-005
HAZARD_IDS: HZ-001
EXECUTION: Not Run
The firmware shall retain a fault cause across a reset when specified by fault policy.
Reset/power-cycle test demonstrates event persists until authorized clearing.
Test
Software
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
-
15. SYS-005 - System UID: SYS-005 STATUS: Draft DOMAIN: System PARENT: STK-003 RELATIONS (Parent): RELATIONS (Child): - ELE-001 ELE-001 - Electrical (derives_from)
- ELE-002 ELE-002 - Electrical (derives_from)
- ELE-003 ELE-003 - Electrical (derives_from)
- ELE-004 ELE-004 - Electrical (derives_from)
- ELE-009 ELE-009 - Electrical (derives_from)
- ELE-011 ELE-011 - Electrical (derives_from)
- FW-001 FW-001 - Firmware (derives_from)
- FW-002 FW-002 - Firmware (derives_from)
- FW-007 FW-007 - Firmware (derives_from)
- FW-008 FW-008 - Firmware (derives_from)
- FW-011 FW-011 - Firmware (derives_from)
- THM-006 THM-006 - Thermal (derives_from)
- THM-007 THM-007 - Thermal (derives_from)
STATEMENT: The pack shall interrupt charge/discharge according to the approved protection state table.
ACCEPTANCE: Each listed fault produces expected output state and recorded event.
METHOD: Test
VMODEL_LEVEL: System
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
TEST_IDS: TR-004, TR-005
HAZARD_IDS: HZ-001
EXECUTION: Not Run
The firmware shall detect stalled critical tasks through watchdog supervision.
Injected task stall leads to defined fail-safe outcome.
Test
Software
V1-12V
Must
Unassigned
Engineering target - proposed
HZ-012
Not Run
-
18. SYS-008 - System UID: SYS-008 STATUS: Draft DOMAIN: System PARENT: STK-002 RELATIONS (Parent): RELATIONS (Child): STATEMENT: The pack shall expose a defined service interface for diagnostics.
ACCEPTANCE: All protocol commands pass interface conformance tests.
METHOD: Test
VMODEL_LEVEL: System
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
The firmware shall reject malformed or unauthorized configuration commands.
Protocol negative and authorization tests reject invalid writes.
Test
Software
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
-
5. STK-005 - Stakeholder UID: STK-005 STATUS: Draft DOMAIN: Stakeholder RELATIONS (Child): - SYS-010 SYS-010 - System (derives_from)
- FW-010 FW-010 - Firmware (derives_from)
- CAD-001 CAD-001 - CAD (derives_from)
- CAD-007 CAD-007 - CAD (derives_from)
- SIM-001 SIM-001 - Simulation (derives_from)
- SIM-002 SIM-002 - Simulation (derives_from)
- SIM-003 SIM-003 - Simulation (derives_from)
- SIM-004 SIM-004 - Simulation (derives_from)
- SIM-005 SIM-005 - Simulation (derives_from)
- SIM-010 SIM-010 - Simulation (derives_from)
- PLT-004 PLT-004 - Platform (derives_from)
- PLT-006 PLT-006 - Platform (derives_from)
- PLT-010 PLT-010 - Platform (derives_from)
- PLT-011 PLT-011 - Platform (derives_from)
- PLT-013 PLT-013 - Platform (derives_from)
- VER-001 VER-001 - Verification (derives_from)
- VER-002 VER-002 - Verification (derives_from)
- VER-003 VER-003 - Verification (derives_from)
- VER-004 VER-004 - Verification (derives_from)
- VER-005 VER-005 - Verification (derives_from)
- VER-006 VER-006 - Verification (derives_from)
- VER-007 VER-007 - Verification (derives_from)
- VER-008 VER-008 - Verification (derives_from)
- VER-009 VER-009 - Verification (derives_from)
- VER-010 VER-010 - Verification (derives_from)
- MFG-003 MFG-003 - Manufacturing (derives_from)
- MFG-006 MFG-006 - Manufacturing (derives_from)
STATEMENT: The platform shall trace design decisions to requirements and verification evidence.
ACCEPTANCE: Sample 10 requirements traced bidirectionally through implementation and test reports.
METHOD: Inspection
VMODEL_LEVEL: Validation
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
Every firmware release shall retain build provenance and checksum.
Rebuild from pinned inputs reproduces version metadata and artifact hash policy.
Inspection
Software
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
-
15. SYS-005 - System UID: SYS-005 STATUS: Draft DOMAIN: System PARENT: STK-003 RELATIONS (Parent): RELATIONS (Child): - ELE-001 ELE-001 - Electrical (derives_from)
- ELE-002 ELE-002 - Electrical (derives_from)
- ELE-003 ELE-003 - Electrical (derives_from)
- ELE-004 ELE-004 - Electrical (derives_from)
- ELE-009 ELE-009 - Electrical (derives_from)
- ELE-011 ELE-011 - Electrical (derives_from)
- FW-001 FW-001 - Firmware (derives_from)
- FW-002 FW-002 - Firmware (derives_from)
- FW-007 FW-007 - Firmware (derives_from)
- FW-008 FW-008 - Firmware (derives_from)
- FW-011 FW-011 - Firmware (derives_from)
- THM-006 THM-006 - Thermal (derives_from)
- THM-007 THM-007 - Thermal (derives_from)
STATEMENT: The pack shall interrupt charge/discharge according to the approved protection state table.
ACCEPTANCE: Each listed fault produces expected output state and recorded event.
METHOD: Test
VMODEL_LEVEL: System
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
TEST_IDS: TR-004, TR-005
HAZARD_IDS: HZ-001
EXECUTION: Not Run
The firmware shall detect stale or invalid temperature data.
Loss/stuck-sensor simulated; safe-state policy passes all defined cases.
Test
Software
V1-12V
Must
Unassigned
Engineering target - proposed
HZ-006
Not Run
-
18. SYS-008 - System UID: SYS-008 STATUS: Draft DOMAIN: System PARENT: STK-002 RELATIONS (Parent): RELATIONS (Child): STATEMENT: The pack shall expose a defined service interface for diagnostics.
ACCEPTANCE: All protocol commands pass interface conformance tests.
METHOD: Test
VMODEL_LEVEL: System
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
The firmware shall support a controlled calibration data procedure.
Calibration revision and CRC verified; corrupt configuration rejected.
Test
Software
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
-
11. SYS-001 - System UID: SYS-001 STATUS: Draft DOMAIN: System PARENT: STK-001 RELATIONS (Parent): RELATIONS (Child): STATEMENT: The V1 pack shall contain four LFP cells connected in series.
ACCEPTANCE: As-built cell count=4 and measured polarity/topology matches schematic.
METHOD: Inspection
VMODEL_LEVEL: System
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
TEST_IDS: TR-001
EXECUTION: Not Run
The pack shall secure four cells in the declared CAD orientation.
Assembly fit-check agrees with released drawing and stack tolerances.
Inspection
Subsystem
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
-
19. SYS-009 - System UID: SYS-009 STATUS: Draft DOMAIN: System PARENT: STK-009 RELATIONS (Parent): RELATIONS (Child): - CEL-003 CEL-003 - Cell (derives_from)
- CEL-004 CEL-004 - Cell (derives_from)
- CEL-007 CEL-007 - Cell (derives_from)
- ELE-008 ELE-008 - Electrical (derives_from)
- MEC-002 MEC-002 - Mechanical (derives_from)
- MEC-004 MEC-004 - Mechanical (derives_from)
- MEC-005 MEC-005 - Mechanical (derives_from)
- MEC-008 MEC-008 - Mechanical (derives_from)
- MEC-009 MEC-009 - Mechanical (derives_from)
STATEMENT: The pack shall comply with an approved system operating envelope.
ACCEPTANCE: Operating envelope table approved and full boundary-condition test coverage assigned.
METHOD: Review
VMODEL_LEVEL: System
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
Cell restraints shall comply with the manufacturer compression limits.
Worst-case tolerance and clamping force verified against supplier envelope.
Analysis
Subsystem
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
-
17. SYS-007 - System UID: SYS-007 STATUS: Draft DOMAIN: System PARENT: STK-003 RELATIONS (Parent): RELATIONS (Child): STATEMENT: The pack shall incorporate a coordinated fuse and electronic protection concept.
ACCEPTANCE: Safety review validates fuse ratings, FET SOA, fault energy, wiring, and disconnection behavior.
METHOD: Analysis
VMODEL_LEVEL: System
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
HAZARD_IDS: HZ-002, HZ-007
EXECUTION: Not Run
Electrical insulation shall prevent accidental busbar-enclosure contact in all specified tolerances.
CAD clearance check and physical inspection against frozen spacing standard.
Inspection
Subsystem
V1-12V
Must
Unassigned
Engineering target - proposed
HZ-003
Not Run
-
75. CAD-008 - CAD UID: CAD-008 STATUS: Draft DOMAIN: CAD PARENT: MEC-003 RELATIONS (Parent): STATEMENT: CAD automation shall detect electrical/physical clearance rule violations.
ACCEPTANCE: Synthetic interference test produces blocked release and exception record.
METHOD: Test
VMODEL_LEVEL: Model
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
-
19. SYS-009 - System UID: SYS-009 STATUS: Draft DOMAIN: System PARENT: STK-009 RELATIONS (Parent): RELATIONS (Child): - CEL-003 CEL-003 - Cell (derives_from)
- CEL-004 CEL-004 - Cell (derives_from)
- CEL-007 CEL-007 - Cell (derives_from)
- ELE-008 ELE-008 - Electrical (derives_from)
- MEC-002 MEC-002 - Mechanical (derives_from)
- MEC-004 MEC-004 - Mechanical (derives_from)
- MEC-005 MEC-005 - Mechanical (derives_from)
- MEC-008 MEC-008 - Mechanical (derives_from)
- MEC-009 MEC-009 - Mechanical (derives_from)
STATEMENT: The pack shall comply with an approved system operating envelope.
ACCEPTANCE: Operating envelope table approved and full boundary-condition test coverage assigned.
METHOD: Review
VMODEL_LEVEL: System
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
The enclosure shall withstand the approved static mounting loads.
FEA and representative physical fixture test meet displacement/stress criteria.
Test
Subsystem
V1-12V
Must
Unassigned
Engineering target - proposed
HZ-010
Not Run
-
83. SIM-008 - Simulation UID: SIM-008 STATUS: Draft DOMAIN: Simulation PARENT: MEC-004 RELATIONS (Parent): STATEMENT: The structural solver shall support mesh convergence assessment.
ACCEPTANCE: At least three controlled mesh densities compared for critical response.
METHOD: Analysis
VMODEL_LEVEL: Model
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
-
19. SYS-009 - System UID: SYS-009 STATUS: Draft DOMAIN: System PARENT: STK-009 RELATIONS (Parent): RELATIONS (Child): - CEL-003 CEL-003 - Cell (derives_from)
- CEL-004 CEL-004 - Cell (derives_from)
- CEL-007 CEL-007 - Cell (derives_from)
- ELE-008 ELE-008 - Electrical (derives_from)
- MEC-002 MEC-002 - Mechanical (derives_from)
- MEC-004 MEC-004 - Mechanical (derives_from)
- MEC-005 MEC-005 - Mechanical (derives_from)
- MEC-008 MEC-008 - Mechanical (derives_from)
- MEC-009 MEC-009 - Mechanical (derives_from)
STATEMENT: The pack shall comply with an approved system operating envelope.
ACCEPTANCE: Operating envelope table approved and full boundary-condition test coverage assigned.
METHOD: Review
VMODEL_LEVEL: System
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
The mounting design shall avoid unacceptable resonances in the operational vibration profile.
Modal test correlated to model; resonant response compared to approved limits.
Test
Subsystem
V1-12V
Must
Unassigned
Engineering target - proposed
TR-013
HZ-009, HZ-010
Not Run
-
82. SIM-007 - Simulation UID: SIM-007 STATUS: Draft DOMAIN: Simulation PARENT: MEC-005 RELATIONS (Parent): STATEMENT: The structural model shall support eigenfrequency/modal analysis.
ACCEPTANCE: Solver exports frequencies and modes with mesh, materials, constraints manifest.
METHOD: Demo
VMODEL_LEVEL: Model
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
-
17. SYS-007 - System UID: SYS-007 STATUS: Draft DOMAIN: System PARENT: STK-003 RELATIONS (Parent): RELATIONS (Child): STATEMENT: The pack shall incorporate a coordinated fuse and electronic protection concept.
ACCEPTANCE: Safety review validates fuse ratings, FET SOA, fault energy, wiring, and disconnection behavior.
METHOD: Analysis
VMODEL_LEVEL: System
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
HAZARD_IDS: HZ-002, HZ-007
EXECUTION: Not Run
Busbar fastening shall use controlled fastener and torque specifications.
Assembly inspection documents torque procedure, washer and locking approach.
Inspection
Subsystem
V1-12V
Must
Unassigned
Engineering target - proposed
TR-014
HZ-009
Not Run
-
8. STK-008 - Stakeholder UID: STK-008 STATUS: Draft DOMAIN: Stakeholder RELATIONS (Child): STATEMENT: The product shall be serviceable using documented diagnostics and replaceable assemblies.
ACCEPTANCE: Documented diagnostic workflow identifies each specified field-replaceable assembly.
METHOD: Demo
VMODEL_LEVEL: Validation
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
Serviceable components shall be accessible without disturbing cell terminals unintentionally.
Service procedure dry-run demonstrates defined replacement and isolation sequence.
Demo
System
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
-
19. SYS-009 - System UID: SYS-009 STATUS: Draft DOMAIN: System PARENT: STK-009 RELATIONS (Parent): RELATIONS (Child): - CEL-003 CEL-003 - Cell (derives_from)
- CEL-004 CEL-004 - Cell (derives_from)
- CEL-007 CEL-007 - Cell (derives_from)
- ELE-008 ELE-008 - Electrical (derives_from)
- MEC-002 MEC-002 - Mechanical (derives_from)
- MEC-004 MEC-004 - Mechanical (derives_from)
- MEC-005 MEC-005 - Mechanical (derives_from)
- MEC-008 MEC-008 - Mechanical (derives_from)
- MEC-009 MEC-009 - Mechanical (derives_from)
STATEMENT: The pack shall comply with an approved system operating envelope.
ACCEPTANCE: Operating envelope table approved and full boundary-condition test coverage assigned.
METHOD: Review
VMODEL_LEVEL: System
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
Mechanical BOM mass shall match CAD estimate within the approved discrepancy limit.
As-built pack mass reconciled to CAD/material mass budget.
Test
System
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
-
19. SYS-009 - System UID: SYS-009 STATUS: Draft DOMAIN: System PARENT: STK-009 RELATIONS (Parent): RELATIONS (Child): - CEL-003 CEL-003 - Cell (derives_from)
- CEL-004 CEL-004 - Cell (derives_from)
- CEL-007 CEL-007 - Cell (derives_from)
- ELE-008 ELE-008 - Electrical (derives_from)
- MEC-002 MEC-002 - Mechanical (derives_from)
- MEC-004 MEC-004 - Mechanical (derives_from)
- MEC-005 MEC-005 - Mechanical (derives_from)
- MEC-008 MEC-008 - Mechanical (derives_from)
- MEC-009 MEC-009 - Mechanical (derives_from)
STATEMENT: The pack shall comply with an approved system operating envelope.
ACCEPTANCE: Operating envelope table approved and full boundary-condition test coverage assigned.
METHOD: Review
VMODEL_LEVEL: System
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
Critical dimensions and tolerances shall be present in manufacturing drawings.
Drawing review verifies dimensions, datum strategy, tolerances and revision labels.
Inspection
Subsystem
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
-
13. SYS-003 - System UID: SYS-003 STATUS: Draft DOMAIN: System PARENT: STK-002 RELATIONS (Parent): RELATIONS (Child): STATEMENT: The V1 pack shall support 20 A continuous discharge at the specified ambient and SOC.
ACCEPTANCE: Validated steady-state load profile maintained without exceeding approved electrical/thermal limits.
METHOD: Test
VMODEL_LEVEL: System
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
The thermal model shall represent resistive losses in cells and power path.
Energy balance and I²R term unit tests pass.
Analysis
Model
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
-
13. SYS-003 - System UID: SYS-003 STATUS: Draft DOMAIN: System PARENT: STK-002 RELATIONS (Parent): RELATIONS (Child): STATEMENT: The V1 pack shall support 20 A continuous discharge at the specified ambient and SOC.
ACCEPTANCE: Validated steady-state load profile maintained without exceeding approved electrical/thermal limits.
METHOD: Test
VMODEL_LEVEL: System
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
The thermal model shall represent ambient convection and thermal contact paths.
Parameters and boundary conditions documented with units and sources.
Inspection
Model
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
-
13. SYS-003 - System UID: SYS-003 STATUS: Draft DOMAIN: System PARENT: STK-002 RELATIONS (Parent): RELATIONS (Child): STATEMENT: The V1 pack shall support 20 A continuous discharge at the specified ambient and SOC.
ACCEPTANCE: Validated steady-state load profile maintained without exceeding approved electrical/thermal limits.
METHOD: Test
VMODEL_LEVEL: System
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
Thermal response shall be estimated for nominal load and agreed duty cycle.
Transient prediction and assumptions exported for each approved scenario.
Analysis
Model
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
-
13. SYS-003 - System UID: SYS-003 STATUS: Draft DOMAIN: System PARENT: STK-002 RELATIONS (Parent): RELATIONS (Child): STATEMENT: The V1 pack shall support 20 A continuous discharge at the specified ambient and SOC.
ACCEPTANCE: Validated steady-state load profile maintained without exceeding approved electrical/thermal limits.
METHOD: Test
VMODEL_LEVEL: System
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
The hottest measured cell location shall be included in a validation plan.
Thermocouple map identifies expected hotspot and representative measurements.
Inspection
System
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
-
13. SYS-003 - System UID: SYS-003 STATUS: Draft DOMAIN: System PARENT: STK-002 RELATIONS (Parent): RELATIONS (Child): STATEMENT: The V1 pack shall support 20 A continuous discharge at the specified ambient and SOC.
ACCEPTANCE: Validated steady-state load profile maintained without exceeding approved electrical/thermal limits.
METHOD: Test
VMODEL_LEVEL: System
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
Thermal simulation accuracy shall be assessed against measured pack temperatures.
Correlation error and uncertainty reported across >= 3 agreed load profiles.
Test
System
V1-12V
Must
Unassigned
Engineering target - proposed
TR-012
HZ-011
Not Run
-
81. SIM-006 - Simulation UID: SIM-006 STATUS: Draft DOMAIN: Simulation PARENT: THM-005 RELATIONS (Parent): STATEMENT: The simulation pipeline shall support parameter calibration without overwriting original measurement data.
ACCEPTANCE: Calibrated model version and input dataset hashes recorded separately.
METHOD: Inspection
VMODEL_LEVEL: Model
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
-
15. SYS-005 - System UID: SYS-005 STATUS: Draft DOMAIN: System PARENT: STK-003 RELATIONS (Parent): RELATIONS (Child): - ELE-001 ELE-001 - Electrical (derives_from)
- ELE-002 ELE-002 - Electrical (derives_from)
- ELE-003 ELE-003 - Electrical (derives_from)
- ELE-004 ELE-004 - Electrical (derives_from)
- ELE-009 ELE-009 - Electrical (derives_from)
- ELE-011 ELE-011 - Electrical (derives_from)
- FW-001 FW-001 - Firmware (derives_from)
- FW-002 FW-002 - Firmware (derives_from)
- FW-007 FW-007 - Firmware (derives_from)
- FW-008 FW-008 - Firmware (derives_from)
- FW-011 FW-011 - Firmware (derives_from)
- THM-006 THM-006 - Thermal (derives_from)
- THM-007 THM-007 - Thermal (derives_from)
STATEMENT: The pack shall interrupt charge/discharge according to the approved protection state table.
ACCEPTANCE: Each listed fault produces expected output state and recorded event.
METHOD: Test
VMODEL_LEVEL: System
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
TEST_IDS: TR-004, TR-005
HAZARD_IDS: HZ-001
EXECUTION: Not Run
The BMS shall block charging outside the permitted cell thermal range.
Boundary fault test shows expected cutoff and recovery behavior.
Test
System
V1-12V
Must
Unassigned
Engineering target - proposed
HZ-006
Not Run
-
15. SYS-005 - System UID: SYS-005 STATUS: Draft DOMAIN: System PARENT: STK-003 RELATIONS (Parent): RELATIONS (Child): - ELE-001 ELE-001 - Electrical (derives_from)
- ELE-002 ELE-002 - Electrical (derives_from)
- ELE-003 ELE-003 - Electrical (derives_from)
- ELE-004 ELE-004 - Electrical (derives_from)
- ELE-009 ELE-009 - Electrical (derives_from)
- ELE-011 ELE-011 - Electrical (derives_from)
- FW-001 FW-001 - Firmware (derives_from)
- FW-002 FW-002 - Firmware (derives_from)
- FW-007 FW-007 - Firmware (derives_from)
- FW-008 FW-008 - Firmware (derives_from)
- FW-011 FW-011 - Firmware (derives_from)
- THM-006 THM-006 - Thermal (derives_from)
- THM-007 THM-007 - Thermal (derives_from)
STATEMENT: The pack shall interrupt charge/discharge according to the approved protection state table.
ACCEPTANCE: Each listed fault produces expected output state and recorded event.
METHOD: Test
VMODEL_LEVEL: System
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
TEST_IDS: TR-004, TR-005
HAZARD_IDS: HZ-001
EXECUTION: Not Run
The BMS shall block discharge outside the permitted cell thermal range.
Boundary fault test shows expected cutoff and recovery behavior.
Test
System
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
-
36. ELE-009 - Electrical UID: ELE-009 STATUS: Draft DOMAIN: Electrical PARENT: SYS-005 RELATIONS (Parent): RELATIONS (Child): STATEMENT: The BMS shall support a documented balancing strategy.
ACCEPTANCE: Balancing activation, inhibition, current and thermal budget tested.
METHOD: Test
VMODEL_LEVEL: Subsystem
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
TEST_IDS: TR-011
EXECUTION: Not Run
Cell balancing heat shall be represented in BMS thermal budget.
Worst-case balancing condition analysed and design review approved.
Analysis
Subsystem
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
-
5. STK-005 - Stakeholder UID: STK-005 STATUS: Draft DOMAIN: Stakeholder RELATIONS (Child): - SYS-010 SYS-010 - System (derives_from)
- FW-010 FW-010 - Firmware (derives_from)
- CAD-001 CAD-001 - CAD (derives_from)
- CAD-007 CAD-007 - CAD (derives_from)
- SIM-001 SIM-001 - Simulation (derives_from)
- SIM-002 SIM-002 - Simulation (derives_from)
- SIM-003 SIM-003 - Simulation (derives_from)
- SIM-004 SIM-004 - Simulation (derives_from)
- SIM-005 SIM-005 - Simulation (derives_from)
- SIM-010 SIM-010 - Simulation (derives_from)
- PLT-004 PLT-004 - Platform (derives_from)
- PLT-006 PLT-006 - Platform (derives_from)
- PLT-010 PLT-010 - Platform (derives_from)
- PLT-011 PLT-011 - Platform (derives_from)
- PLT-013 PLT-013 - Platform (derives_from)
- VER-001 VER-001 - Verification (derives_from)
- VER-002 VER-002 - Verification (derives_from)
- VER-003 VER-003 - Verification (derives_from)
- VER-004 VER-004 - Verification (derives_from)
- VER-005 VER-005 - Verification (derives_from)
- VER-006 VER-006 - Verification (derives_from)
- VER-007 VER-007 - Verification (derives_from)
- VER-008 VER-008 - Verification (derives_from)
- VER-009 VER-009 - Verification (derives_from)
- VER-010 VER-010 - Verification (derives_from)
- MFG-003 MFG-003 - Manufacturing (derives_from)
- MFG-006 MFG-006 - Manufacturing (derives_from)
STATEMENT: The platform shall trace design decisions to requirements and verification evidence.
ACCEPTANCE: Sample 10 requirements traced bidirectionally through implementation and test reports.
METHOD: Inspection
VMODEL_LEVEL: Validation
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
The master model shall generate the declared pack geometry from controlled parameters.
Regenerate 4S nominal variant without manual topology repair.
Demo
Model
V1-12V
Must
Unassigned
Engineering target - proposed
TR-015
Not Run
-
7. STK-007 - Stakeholder UID: STK-007 STATUS: Draft DOMAIN: Stakeholder RELATIONS (Child): - CAD-002 CAD-002 - CAD (derives_from)
- SCL-001 SCL-001 - Scale-up (derives_from)
- SCL-002 SCL-002 - Scale-up (derives_from)
- SCL-003 SCL-003 - Scale-up (derives_from)
- SCL-004 SCL-004 - Scale-up (derives_from)
- SCL-005 SCL-005 - Scale-up (derives_from)
- SCL-006 SCL-006 - Scale-up (derives_from)
- SCL-007 SCL-007 - Scale-up (derives_from)
- SCL-008 SCL-008 - Scale-up (derives_from)
STATEMENT: The product family shall support 24 V, 48 V and 72 V-class variants through controlled reuse.
ACCEPTANCE: Family architecture defines reusable and variant-specific assets with no safety assumptions inherited implicitly.
METHOD: Review
VMODEL_LEVEL: Validation
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
The CAD generator shall support independent series count and cell dimensions within permitted families.
Parameterized 4S/8S/16S geometries generated; invalid combinations rejected.
Test
Model
V1-12V
Must
Unassigned
Engineering target - proposed
TR-016
Not Run
-
11. SYS-001 - System UID: SYS-001 STATUS: Draft DOMAIN: System PARENT: STK-001 RELATIONS (Parent): RELATIONS (Child): STATEMENT: The V1 pack shall contain four LFP cells connected in series.
ACCEPTANCE: As-built cell count=4 and measured polarity/topology matches schematic.
METHOD: Inspection
VMODEL_LEVEL: System
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
TEST_IDS: TR-001
EXECUTION: Not Run
Each CAD cell shall reference an approved part geometry and tolerance set.
Part ID and dimensions match supplier drawing and imported material record.
Inspection
Model
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
-
37. ELE-010 - Electrical UID: ELE-010 STATUS: Draft DOMAIN: Electrical PARENT: SYS-002 RELATIONS (Parent): RELATIONS (Child): STATEMENT: Battery positive and negative polarity shall be unambiguous at external terminals.
ACCEPTANCE: Drawing, labels and as-built inspection agree.
METHOD: Inspection
VMODEL_LEVEL: Subsystem
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
HAZARD_IDS: HZ-004
EXECUTION: Not Run
The CAD assembly shall include terminals, busbars, BMS board, restraints and enclosure.
Released exploded assembly lists every defined subassembly.
Inspection
Model
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
-
6. STK-006 - Stakeholder UID: STK-006 STATUS: Draft DOMAIN: Stakeholder RELATIONS (Child): - CAD-005 CAD-005 - CAD (derives_from)
- BOM-001 BOM-001 - BOM (derives_from)
- BOM-002 BOM-002 - BOM (derives_from)
- BOM-003 BOM-003 - BOM (derives_from)
- BOM-004 BOM-004 - BOM (derives_from)
- BOM-005 BOM-005 - BOM (derives_from)
- BOM-006 BOM-006 - BOM (derives_from)
- BOM-007 BOM-007 - BOM (derives_from)
- MFG-001 MFG-001 - Manufacturing (derives_from)
- MFG-004 MFG-004 - Manufacturing (derives_from)
STATEMENT: The project shall maintain a costed production BOM and approved alternatives.
ACCEPTANCE: 100% of released purchasable parts have source, quantity, cost and lifecycle status.
METHOD: Inspection
VMODEL_LEVEL: Validation
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
CAD part quantities shall be reconciled with the engineering BOM.
All released CAD component IDs map to counted BOM positions.
Test
Model
V1-12V
Must
Unassigned
Engineering target - proposed
TR-017
Not Run
-
4. STK-004 - Stakeholder UID: STK-004 STATUS: Draft DOMAIN: Stakeholder RELATIONS (Child): - CAD-006 CAD-006 - CAD (derives_from)
- SIM-009 SIM-009 - Simulation (derives_from)
- PLT-001 PLT-001 - Platform (derives_from)
- PLT-002 PLT-002 - Platform (derives_from)
- PLT-003 PLT-003 - Platform (derives_from)
- PLT-005 PLT-005 - Platform (derives_from)
- PLT-007 PLT-007 - Platform (derives_from)
- PLT-008 PLT-008 - Platform (derives_from)
- PLT-009 PLT-009 - Platform (derives_from)
- PLT-012 PLT-012 - Platform (derives_from)
- PLT-014 PLT-014 - Platform (derives_from)
STATEMENT: The engineering platform shall allow remote access to released engineering designs.
ACCEPTANCE: Authorized browser can retrieve released CAD view, requirements, BOM, and reports.
METHOD: Demo
VMODEL_LEVEL: Validation
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
The build pipeline shall publish a browser-inspectable 3D derivative.
GLB/glTF derivative opens in target browsers with part IDs and units intact.
Test
Platform
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
-
5. STK-005 - Stakeholder UID: STK-005 STATUS: Draft DOMAIN: Stakeholder RELATIONS (Child): - SYS-010 SYS-010 - System (derives_from)
- FW-010 FW-010 - Firmware (derives_from)
- CAD-001 CAD-001 - CAD (derives_from)
- CAD-007 CAD-007 - CAD (derives_from)
- SIM-001 SIM-001 - Simulation (derives_from)
- SIM-002 SIM-002 - Simulation (derives_from)
- SIM-003 SIM-003 - Simulation (derives_from)
- SIM-004 SIM-004 - Simulation (derives_from)
- SIM-005 SIM-005 - Simulation (derives_from)
- SIM-010 SIM-010 - Simulation (derives_from)
- PLT-004 PLT-004 - Platform (derives_from)
- PLT-006 PLT-006 - Platform (derives_from)
- PLT-010 PLT-010 - Platform (derives_from)
- PLT-011 PLT-011 - Platform (derives_from)
- PLT-013 PLT-013 - Platform (derives_from)
- VER-001 VER-001 - Verification (derives_from)
- VER-002 VER-002 - Verification (derives_from)
- VER-003 VER-003 - Verification (derives_from)
- VER-004 VER-004 - Verification (derives_from)
- VER-005 VER-005 - Verification (derives_from)
- VER-006 VER-006 - Verification (derives_from)
- VER-007 VER-007 - Verification (derives_from)
- VER-008 VER-008 - Verification (derives_from)
- VER-009 VER-009 - Verification (derives_from)
- VER-010 VER-010 - Verification (derives_from)
- MFG-003 MFG-003 - Manufacturing (derives_from)
- MFG-006 MFG-006 - Manufacturing (derives_from)
STATEMENT: The platform shall trace design decisions to requirements and verification evidence.
ACCEPTANCE: Sample 10 requirements traced bidirectionally through implementation and test reports.
METHOD: Inspection
VMODEL_LEVEL: Validation
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
CAD outputs shall identify generator version and input parameter revision.
Manifest links source file, hash, parameter set and derived file hash.
Inspection
Platform
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
-
53. MEC-003 - Mechanical UID: MEC-003 STATUS: Draft DOMAIN: Mechanical PARENT: SYS-007 RELATIONS (Parent): RELATIONS (Child): STATEMENT: Electrical insulation shall prevent accidental busbar-enclosure contact in all specified tolerances.
ACCEPTANCE: CAD clearance check and physical inspection against frozen spacing standard.
METHOD: Inspection
VMODEL_LEVEL: Subsystem
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
HAZARD_IDS: HZ-003
EXECUTION: Not Run
CAD automation shall detect electrical/physical clearance rule violations.
Synthetic interference test produces blocked release and exception record.
Test
Model
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
-
5. STK-005 - Stakeholder UID: STK-005 STATUS: Draft DOMAIN: Stakeholder RELATIONS (Child): - SYS-010 SYS-010 - System (derives_from)
- FW-010 FW-010 - Firmware (derives_from)
- CAD-001 CAD-001 - CAD (derives_from)
- CAD-007 CAD-007 - CAD (derives_from)
- SIM-001 SIM-001 - Simulation (derives_from)
- SIM-002 SIM-002 - Simulation (derives_from)
- SIM-003 SIM-003 - Simulation (derives_from)
- SIM-004 SIM-004 - Simulation (derives_from)
- SIM-005 SIM-005 - Simulation (derives_from)
- SIM-010 SIM-010 - Simulation (derives_from)
- PLT-004 PLT-004 - Platform (derives_from)
- PLT-006 PLT-006 - Platform (derives_from)
- PLT-010 PLT-010 - Platform (derives_from)
- PLT-011 PLT-011 - Platform (derives_from)
- PLT-013 PLT-013 - Platform (derives_from)
- VER-001 VER-001 - Verification (derives_from)
- VER-002 VER-002 - Verification (derives_from)
- VER-003 VER-003 - Verification (derives_from)
- VER-004 VER-004 - Verification (derives_from)
- VER-005 VER-005 - Verification (derives_from)
- VER-006 VER-006 - Verification (derives_from)
- VER-007 VER-007 - Verification (derives_from)
- VER-008 VER-008 - Verification (derives_from)
- VER-009 VER-009 - Verification (derives_from)
- VER-010 VER-010 - Verification (derives_from)
- MFG-003 MFG-003 - Manufacturing (derives_from)
- MFG-006 MFG-006 - Manufacturing (derives_from)
STATEMENT: The platform shall trace design decisions to requirements and verification evidence.
ACCEPTANCE: Sample 10 requirements traced bidirectionally through implementation and test reports.
METHOD: Inspection
VMODEL_LEVEL: Validation
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
The digital twin shall expose a 4-cell electrical equivalent-circuit model.
Model responds deterministically to frozen input scenario with baseline output.
Test
Model
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
-
5. STK-005 - Stakeholder UID: STK-005 STATUS: Draft DOMAIN: Stakeholder RELATIONS (Child): - SYS-010 SYS-010 - System (derives_from)
- FW-010 FW-010 - Firmware (derives_from)
- CAD-001 CAD-001 - CAD (derives_from)
- CAD-007 CAD-007 - CAD (derives_from)
- SIM-001 SIM-001 - Simulation (derives_from)
- SIM-002 SIM-002 - Simulation (derives_from)
- SIM-003 SIM-003 - Simulation (derives_from)
- SIM-004 SIM-004 - Simulation (derives_from)
- SIM-005 SIM-005 - Simulation (derives_from)
- SIM-010 SIM-010 - Simulation (derives_from)
- PLT-004 PLT-004 - Platform (derives_from)
- PLT-006 PLT-006 - Platform (derives_from)
- PLT-010 PLT-010 - Platform (derives_from)
- PLT-011 PLT-011 - Platform (derives_from)
- PLT-013 PLT-013 - Platform (derives_from)
- VER-001 VER-001 - Verification (derives_from)
- VER-002 VER-002 - Verification (derives_from)
- VER-003 VER-003 - Verification (derives_from)
- VER-004 VER-004 - Verification (derives_from)
- VER-005 VER-005 - Verification (derives_from)
- VER-006 VER-006 - Verification (derives_from)
- VER-007 VER-007 - Verification (derives_from)
- VER-008 VER-008 - Verification (derives_from)
- VER-009 VER-009 - Verification (derives_from)
- VER-010 VER-010 - Verification (derives_from)
- MFG-003 MFG-003 - Manufacturing (derives_from)
- MFG-006 MFG-006 - Manufacturing (derives_from)
STATEMENT: The platform shall trace design decisions to requirements and verification evidence.
ACCEPTANCE: Sample 10 requirements traced bidirectionally through implementation and test reports.
METHOD: Inspection
VMODEL_LEVEL: Validation
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
Each model run shall record parameter set, solver version and boundary conditions.
100% sampled runs reproduce metadata manifest and result hashes.
Inspection
Model
V1-12V
Must
Unassigned
Engineering target - proposed
HZ-011
Not Run
-
5. STK-005 - Stakeholder UID: STK-005 STATUS: Draft DOMAIN: Stakeholder RELATIONS (Child): - SYS-010 SYS-010 - System (derives_from)
- FW-010 FW-010 - Firmware (derives_from)
- CAD-001 CAD-001 - CAD (derives_from)
- CAD-007 CAD-007 - CAD (derives_from)
- SIM-001 SIM-001 - Simulation (derives_from)
- SIM-002 SIM-002 - Simulation (derives_from)
- SIM-003 SIM-003 - Simulation (derives_from)
- SIM-004 SIM-004 - Simulation (derives_from)
- SIM-005 SIM-005 - Simulation (derives_from)
- SIM-010 SIM-010 - Simulation (derives_from)
- PLT-004 PLT-004 - Platform (derives_from)
- PLT-006 PLT-006 - Platform (derives_from)
- PLT-010 PLT-010 - Platform (derives_from)
- PLT-011 PLT-011 - Platform (derives_from)
- PLT-013 PLT-013 - Platform (derives_from)
- VER-001 VER-001 - Verification (derives_from)
- VER-002 VER-002 - Verification (derives_from)
- VER-003 VER-003 - Verification (derives_from)
- VER-004 VER-004 - Verification (derives_from)
- VER-005 VER-005 - Verification (derives_from)
- VER-006 VER-006 - Verification (derives_from)
- VER-007 VER-007 - Verification (derives_from)
- VER-008 VER-008 - Verification (derives_from)
- VER-009 VER-009 - Verification (derives_from)
- VER-010 VER-010 - Verification (derives_from)
- MFG-003 MFG-003 - Manufacturing (derives_from)
- MFG-006 MFG-006 - Manufacturing (derives_from)
STATEMENT: The platform shall trace design decisions to requirements and verification evidence.
ACCEPTANCE: Sample 10 requirements traced bidirectionally through implementation and test reports.
METHOD: Inspection
VMODEL_LEVEL: Validation
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
The simulator shall distinguish model predictions from measured test data.
UI and exported report mark data origin at sample and series level.
Test
Platform
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
-
5. STK-005 - Stakeholder UID: STK-005 STATUS: Draft DOMAIN: Stakeholder RELATIONS (Child): - SYS-010 SYS-010 - System (derives_from)
- FW-010 FW-010 - Firmware (derives_from)
- CAD-001 CAD-001 - CAD (derives_from)
- CAD-007 CAD-007 - CAD (derives_from)
- SIM-001 SIM-001 - Simulation (derives_from)
- SIM-002 SIM-002 - Simulation (derives_from)
- SIM-003 SIM-003 - Simulation (derives_from)
- SIM-004 SIM-004 - Simulation (derives_from)
- SIM-005 SIM-005 - Simulation (derives_from)
- SIM-010 SIM-010 - Simulation (derives_from)
- PLT-004 PLT-004 - Platform (derives_from)
- PLT-006 PLT-006 - Platform (derives_from)
- PLT-010 PLT-010 - Platform (derives_from)
- PLT-011 PLT-011 - Platform (derives_from)
- PLT-013 PLT-013 - Platform (derives_from)
- VER-001 VER-001 - Verification (derives_from)
- VER-002 VER-002 - Verification (derives_from)
- VER-003 VER-003 - Verification (derives_from)
- VER-004 VER-004 - Verification (derives_from)
- VER-005 VER-005 - Verification (derives_from)
- VER-006 VER-006 - Verification (derives_from)
- VER-007 VER-007 - Verification (derives_from)
- VER-008 VER-008 - Verification (derives_from)
- VER-009 VER-009 - Verification (derives_from)
- VER-010 VER-010 - Verification (derives_from)
- MFG-003 MFG-003 - Manufacturing (derives_from)
- MFG-006 MFG-006 - Manufacturing (derives_from)
STATEMENT: The platform shall trace design decisions to requirements and verification evidence.
ACCEPTANCE: Sample 10 requirements traced bidirectionally through implementation and test reports.
METHOD: Inspection
VMODEL_LEVEL: Validation
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
The pack model shall report voltage, current, SOC, power and accumulated energy.
Numerical conservation/reference checks and display unit tests pass.
Test
Model
V1-12V
Must
Unassigned
Engineering target - proposed
TR-018
Not Run
-
5. STK-005 - Stakeholder UID: STK-005 STATUS: Draft DOMAIN: Stakeholder RELATIONS (Child): - SYS-010 SYS-010 - System (derives_from)
- FW-010 FW-010 - Firmware (derives_from)
- CAD-001 CAD-001 - CAD (derives_from)
- CAD-007 CAD-007 - CAD (derives_from)
- SIM-001 SIM-001 - Simulation (derives_from)
- SIM-002 SIM-002 - Simulation (derives_from)
- SIM-003 SIM-003 - Simulation (derives_from)
- SIM-004 SIM-004 - Simulation (derives_from)
- SIM-005 SIM-005 - Simulation (derives_from)
- SIM-010 SIM-010 - Simulation (derives_from)
- PLT-004 PLT-004 - Platform (derives_from)
- PLT-006 PLT-006 - Platform (derives_from)
- PLT-010 PLT-010 - Platform (derives_from)
- PLT-011 PLT-011 - Platform (derives_from)
- PLT-013 PLT-013 - Platform (derives_from)
- VER-001 VER-001 - Verification (derives_from)
- VER-002 VER-002 - Verification (derives_from)
- VER-003 VER-003 - Verification (derives_from)
- VER-004 VER-004 - Verification (derives_from)
- VER-005 VER-005 - Verification (derives_from)
- VER-006 VER-006 - Verification (derives_from)
- VER-007 VER-007 - Verification (derives_from)
- VER-008 VER-008 - Verification (derives_from)
- VER-009 VER-009 - Verification (derives_from)
- VER-010 VER-010 - Verification (derives_from)
- MFG-003 MFG-003 - Manufacturing (derives_from)
- MFG-006 MFG-006 - Manufacturing (derives_from)
STATEMENT: The platform shall trace design decisions to requirements and verification evidence.
ACCEPTANCE: Sample 10 requirements traced bidirectionally through implementation and test reports.
METHOD: Inspection
VMODEL_LEVEL: Validation
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
The pack model shall evaluate per-cell imbalance.
Unbalanced cell synthetic case generates distinct cell states and alerts.
Test
Model
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
-
64. THM-005 - Thermal UID: THM-005 STATUS: Draft DOMAIN: Thermal PARENT: SYS-003 RELATIONS (Parent): RELATIONS (Child): STATEMENT: Thermal simulation accuracy shall be assessed against measured pack temperatures.
ACCEPTANCE: Correlation error and uncertainty reported across >= 3 agreed load profiles.
METHOD: Test
VMODEL_LEVEL: System
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
TEST_IDS: TR-012
HAZARD_IDS: HZ-011
EXECUTION: Not Run
The simulation pipeline shall support parameter calibration without overwriting original measurement data.
Calibrated model version and input dataset hashes recorded separately.
Inspection
Model
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
-
55. MEC-005 - Mechanical UID: MEC-005 STATUS: Draft DOMAIN: Mechanical PARENT: SYS-009 RELATIONS (Parent): RELATIONS (Child): STATEMENT: The mounting design shall avoid unacceptable resonances in the operational vibration profile.
ACCEPTANCE: Modal test correlated to model; resonant response compared to approved limits.
METHOD: Test
VMODEL_LEVEL: Subsystem
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
TEST_IDS: TR-013
HAZARD_IDS: HZ-009, HZ-010
EXECUTION: Not Run
The structural model shall support eigenfrequency/modal analysis.
Solver exports frequencies and modes with mesh, materials, constraints manifest.
Demo
Model
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
-
54. MEC-004 - Mechanical UID: MEC-004 STATUS: Draft DOMAIN: Mechanical PARENT: SYS-009 RELATIONS (Parent): RELATIONS (Child): STATEMENT: The enclosure shall withstand the approved static mounting loads.
ACCEPTANCE: FEA and representative physical fixture test meet displacement/stress criteria.
METHOD: Test
VMODEL_LEVEL: Subsystem
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
HAZARD_IDS: HZ-010
EXECUTION: Not Run
The structural solver shall support mesh convergence assessment.
At least three controlled mesh densities compared for critical response.
Analysis
Model
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
-
4. STK-004 - Stakeholder UID: STK-004 STATUS: Draft DOMAIN: Stakeholder RELATIONS (Child): - CAD-006 CAD-006 - CAD (derives_from)
- SIM-009 SIM-009 - Simulation (derives_from)
- PLT-001 PLT-001 - Platform (derives_from)
- PLT-002 PLT-002 - Platform (derives_from)
- PLT-003 PLT-003 - Platform (derives_from)
- PLT-005 PLT-005 - Platform (derives_from)
- PLT-007 PLT-007 - Platform (derives_from)
- PLT-008 PLT-008 - Platform (derives_from)
- PLT-009 PLT-009 - Platform (derives_from)
- PLT-012 PLT-012 - Platform (derives_from)
- PLT-014 PLT-014 - Platform (derives_from)
STATEMENT: The engineering platform shall allow remote access to released engineering designs.
ACCEPTANCE: Authorized browser can retrieve released CAD view, requirements, BOM, and reports.
METHOD: Demo
VMODEL_LEVEL: Validation
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
Interactive simulation shall return a useful lightweight response within the target UI budget.
95th percentile local scenario calculation <2 seconds on target test workstation.
Test
Platform
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
-
5. STK-005 - Stakeholder UID: STK-005 STATUS: Draft DOMAIN: Stakeholder RELATIONS (Child): - SYS-010 SYS-010 - System (derives_from)
- FW-010 FW-010 - Firmware (derives_from)
- CAD-001 CAD-001 - CAD (derives_from)
- CAD-007 CAD-007 - CAD (derives_from)
- SIM-001 SIM-001 - Simulation (derives_from)
- SIM-002 SIM-002 - Simulation (derives_from)
- SIM-003 SIM-003 - Simulation (derives_from)
- SIM-004 SIM-004 - Simulation (derives_from)
- SIM-005 SIM-005 - Simulation (derives_from)
- SIM-010 SIM-010 - Simulation (derives_from)
- PLT-004 PLT-004 - Platform (derives_from)
- PLT-006 PLT-006 - Platform (derives_from)
- PLT-010 PLT-010 - Platform (derives_from)
- PLT-011 PLT-011 - Platform (derives_from)
- PLT-013 PLT-013 - Platform (derives_from)
- VER-001 VER-001 - Verification (derives_from)
- VER-002 VER-002 - Verification (derives_from)
- VER-003 VER-003 - Verification (derives_from)
- VER-004 VER-004 - Verification (derives_from)
- VER-005 VER-005 - Verification (derives_from)
- VER-006 VER-006 - Verification (derives_from)
- VER-007 VER-007 - Verification (derives_from)
- VER-008 VER-008 - Verification (derives_from)
- VER-009 VER-009 - Verification (derives_from)
- VER-010 VER-010 - Verification (derives_from)
- MFG-003 MFG-003 - Manufacturing (derives_from)
- MFG-006 MFG-006 - Manufacturing (derives_from)
STATEMENT: The platform shall trace design decisions to requirements and verification evidence.
ACCEPTANCE: Sample 10 requirements traced bidirectionally through implementation and test reports.
METHOD: Inspection
VMODEL_LEVEL: Validation
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
Invalid model parameters shall be rejected before execution.
Schema/physics guards reject negative resistance, zero mass, bad series count.
Test
Platform
V1-12V
Must
Unassigned
Engineering target - proposed
TR-019
Not Run
-
4. STK-004 - Stakeholder UID: STK-004 STATUS: Draft DOMAIN: Stakeholder RELATIONS (Child): - CAD-006 CAD-006 - CAD (derives_from)
- SIM-009 SIM-009 - Simulation (derives_from)
- PLT-001 PLT-001 - Platform (derives_from)
- PLT-002 PLT-002 - Platform (derives_from)
- PLT-003 PLT-003 - Platform (derives_from)
- PLT-005 PLT-005 - Platform (derives_from)
- PLT-007 PLT-007 - Platform (derives_from)
- PLT-008 PLT-008 - Platform (derives_from)
- PLT-009 PLT-009 - Platform (derives_from)
- PLT-012 PLT-012 - Platform (derives_from)
- PLT-014 PLT-014 - Platform (derives_from)
STATEMENT: The engineering platform shall allow remote access to released engineering designs.
ACCEPTANCE: Authorized browser can retrieve released CAD view, requirements, BOM, and reports.
METHOD: Demo
VMODEL_LEVEL: Validation
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
Authorized users shall access released projects through modern browsers.
Desktop and mobile browser acceptance matrix passes.
Test
Platform
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
-
4. STK-004 - Stakeholder UID: STK-004 STATUS: Draft DOMAIN: Stakeholder RELATIONS (Child): - CAD-006 CAD-006 - CAD (derives_from)
- SIM-009 SIM-009 - Simulation (derives_from)
- PLT-001 PLT-001 - Platform (derives_from)
- PLT-002 PLT-002 - Platform (derives_from)
- PLT-003 PLT-003 - Platform (derives_from)
- PLT-005 PLT-005 - Platform (derives_from)
- PLT-007 PLT-007 - Platform (derives_from)
- PLT-008 PLT-008 - Platform (derives_from)
- PLT-009 PLT-009 - Platform (derives_from)
- PLT-012 PLT-012 - Platform (derives_from)
- PLT-014 PLT-014 - Platform (derives_from)
STATEMENT: The engineering platform shall allow remote access to released engineering designs.
ACCEPTANCE: Authorized browser can retrieve released CAD view, requirements, BOM, and reports.
METHOD: Demo
VMODEL_LEVEL: Validation
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
Project access shall require authenticated identity and role authorization.
Negative tests deny unauthenticated and cross-project access.
Test
Platform
V1-12V
Must
Unassigned
Engineering target - proposed
TR-020
Not Run
-
4. STK-004 - Stakeholder UID: STK-004 STATUS: Draft DOMAIN: Stakeholder RELATIONS (Child): - CAD-006 CAD-006 - CAD (derives_from)
- SIM-009 SIM-009 - Simulation (derives_from)
- PLT-001 PLT-001 - Platform (derives_from)
- PLT-002 PLT-002 - Platform (derives_from)
- PLT-003 PLT-003 - Platform (derives_from)
- PLT-005 PLT-005 - Platform (derives_from)
- PLT-007 PLT-007 - Platform (derives_from)
- PLT-008 PLT-008 - Platform (derives_from)
- PLT-009 PLT-009 - Platform (derives_from)
- PLT-012 PLT-012 - Platform (derives_from)
- PLT-014 PLT-014 - Platform (derives_from)
STATEMENT: The engineering platform shall allow remote access to released engineering designs.
ACCEPTANCE: Authorized browser can retrieve released CAD view, requirements, BOM, and reports.
METHOD: Demo
VMODEL_LEVEL: Validation
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
Large CAD and simulation artifacts shall be stored in Google Cloud Storage.
Artifact upload/download integrity hash matches and metadata indexed.
Test
Platform
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
-
5. STK-005 - Stakeholder UID: STK-005 STATUS: Draft DOMAIN: Stakeholder RELATIONS (Child): - SYS-010 SYS-010 - System (derives_from)
- FW-010 FW-010 - Firmware (derives_from)
- CAD-001 CAD-001 - CAD (derives_from)
- CAD-007 CAD-007 - CAD (derives_from)
- SIM-001 SIM-001 - Simulation (derives_from)
- SIM-002 SIM-002 - Simulation (derives_from)
- SIM-003 SIM-003 - Simulation (derives_from)
- SIM-004 SIM-004 - Simulation (derives_from)
- SIM-005 SIM-005 - Simulation (derives_from)
- SIM-010 SIM-010 - Simulation (derives_from)
- PLT-004 PLT-004 - Platform (derives_from)
- PLT-006 PLT-006 - Platform (derives_from)
- PLT-010 PLT-010 - Platform (derives_from)
- PLT-011 PLT-011 - Platform (derives_from)
- PLT-013 PLT-013 - Platform (derives_from)
- VER-001 VER-001 - Verification (derives_from)
- VER-002 VER-002 - Verification (derives_from)
- VER-003 VER-003 - Verification (derives_from)
- VER-004 VER-004 - Verification (derives_from)
- VER-005 VER-005 - Verification (derives_from)
- VER-006 VER-006 - Verification (derives_from)
- VER-007 VER-007 - Verification (derives_from)
- VER-008 VER-008 - Verification (derives_from)
- VER-009 VER-009 - Verification (derives_from)
- VER-010 VER-010 - Verification (derives_from)
- MFG-003 MFG-003 - Manufacturing (derives_from)
- MFG-006 MFG-006 - Manufacturing (derives_from)
STATEMENT: The platform shall trace design decisions to requirements and verification evidence.
ACCEPTANCE: Sample 10 requirements traced bidirectionally through implementation and test reports.
METHOD: Inspection
VMODEL_LEVEL: Validation
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
Requirement documents shall be managed as Git-versioned text sources.
A change is traceable to commit, author, diff and review decision.
Inspection
Platform
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
-
4. STK-004 - Stakeholder UID: STK-004 STATUS: Draft DOMAIN: Stakeholder RELATIONS (Child): - CAD-006 CAD-006 - CAD (derives_from)
- SIM-009 SIM-009 - Simulation (derives_from)
- PLT-001 PLT-001 - Platform (derives_from)
- PLT-002 PLT-002 - Platform (derives_from)
- PLT-003 PLT-003 - Platform (derives_from)
- PLT-005 PLT-005 - Platform (derives_from)
- PLT-007 PLT-007 - Platform (derives_from)
- PLT-008 PLT-008 - Platform (derives_from)
- PLT-009 PLT-009 - Platform (derives_from)
- PLT-012 PLT-012 - Platform (derives_from)
- PLT-014 PLT-014 - Platform (derives_from)
STATEMENT: The engineering platform shall allow remote access to released engineering designs.
ACCEPTANCE: Authorized browser can retrieve released CAD view, requirements, BOM, and reports.
METHOD: Demo
VMODEL_LEVEL: Validation
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
The UI shall display read-only released CAD model derivatives.
Released revision loads and independent user cannot mutate master CAD.
Test
Platform
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
-
5. STK-005 - Stakeholder UID: STK-005 STATUS: Draft DOMAIN: Stakeholder RELATIONS (Child): - SYS-010 SYS-010 - System (derives_from)
- FW-010 FW-010 - Firmware (derives_from)
- CAD-001 CAD-001 - CAD (derives_from)
- CAD-007 CAD-007 - CAD (derives_from)
- SIM-001 SIM-001 - Simulation (derives_from)
- SIM-002 SIM-002 - Simulation (derives_from)
- SIM-003 SIM-003 - Simulation (derives_from)
- SIM-004 SIM-004 - Simulation (derives_from)
- SIM-005 SIM-005 - Simulation (derives_from)
- SIM-010 SIM-010 - Simulation (derives_from)
- PLT-004 PLT-004 - Platform (derives_from)
- PLT-006 PLT-006 - Platform (derives_from)
- PLT-010 PLT-010 - Platform (derives_from)
- PLT-011 PLT-011 - Platform (derives_from)
- PLT-013 PLT-013 - Platform (derives_from)
- VER-001 VER-001 - Verification (derives_from)
- VER-002 VER-002 - Verification (derives_from)
- VER-003 VER-003 - Verification (derives_from)
- VER-004 VER-004 - Verification (derives_from)
- VER-005 VER-005 - Verification (derives_from)
- VER-006 VER-006 - Verification (derives_from)
- VER-007 VER-007 - Verification (derives_from)
- VER-008 VER-008 - Verification (derives_from)
- VER-009 VER-009 - Verification (derives_from)
- VER-010 VER-010 - Verification (derives_from)
- MFG-003 MFG-003 - Manufacturing (derives_from)
- MFG-006 MFG-006 - Manufacturing (derives_from)
STATEMENT: The platform shall trace design decisions to requirements and verification evidence.
ACCEPTANCE: Sample 10 requirements traced bidirectionally through implementation and test reports.
METHOD: Inspection
VMODEL_LEVEL: Validation
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
Each simulation result shall reference immutable input and executable versions.
Run manifest contains source commit, params checksum, solver version.
Inspection
Platform
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
-
4. STK-004 - Stakeholder UID: STK-004 STATUS: Draft DOMAIN: Stakeholder RELATIONS (Child): - CAD-006 CAD-006 - CAD (derives_from)
- SIM-009 SIM-009 - Simulation (derives_from)
- PLT-001 PLT-001 - Platform (derives_from)
- PLT-002 PLT-002 - Platform (derives_from)
- PLT-003 PLT-003 - Platform (derives_from)
- PLT-005 PLT-005 - Platform (derives_from)
- PLT-007 PLT-007 - Platform (derives_from)
- PLT-008 PLT-008 - Platform (derives_from)
- PLT-009 PLT-009 - Platform (derives_from)
- PLT-012 PLT-012 - Platform (derives_from)
- PLT-014 PLT-014 - Platform (derives_from)
STATEMENT: The engineering platform shall allow remote access to released engineering designs.
ACCEPTANCE: Authorized browser can retrieve released CAD view, requirements, BOM, and reports.
METHOD: Demo
VMODEL_LEVEL: Validation
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
Long simulation jobs shall execute outside synchronous web requests.
Job survives browser disconnect; status and result remain retrievable.
Test
Platform
V1-12V
Must
Unassigned
Engineering target - proposed
TR-021
Not Run
-
4. STK-004 - Stakeholder UID: STK-004 STATUS: Draft DOMAIN: Stakeholder RELATIONS (Child): - CAD-006 CAD-006 - CAD (derives_from)
- SIM-009 SIM-009 - Simulation (derives_from)
- PLT-001 PLT-001 - Platform (derives_from)
- PLT-002 PLT-002 - Platform (derives_from)
- PLT-003 PLT-003 - Platform (derives_from)
- PLT-005 PLT-005 - Platform (derives_from)
- PLT-007 PLT-007 - Platform (derives_from)
- PLT-008 PLT-008 - Platform (derives_from)
- PLT-009 PLT-009 - Platform (derives_from)
- PLT-012 PLT-012 - Platform (derives_from)
- PLT-014 PLT-014 - Platform (derives_from)
STATEMENT: The engineering platform shall allow remote access to released engineering designs.
ACCEPTANCE: Authorized browser can retrieve released CAD view, requirements, BOM, and reports.
METHOD: Demo
VMODEL_LEVEL: Validation
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
Cloud storage objects shall be recoverable under the approved backup policy.
Documented restore drill recovers deliberately removed test dataset.
Test
Platform
V1-12V
Must
Unassigned
Engineering target - proposed
TR-022
HZ-015
Not Run
-
4. STK-004 - Stakeholder UID: STK-004 STATUS: Draft DOMAIN: Stakeholder RELATIONS (Child): - CAD-006 CAD-006 - CAD (derives_from)
- SIM-009 SIM-009 - Simulation (derives_from)
- PLT-001 PLT-001 - Platform (derives_from)
- PLT-002 PLT-002 - Platform (derives_from)
- PLT-003 PLT-003 - Platform (derives_from)
- PLT-005 PLT-005 - Platform (derives_from)
- PLT-007 PLT-007 - Platform (derives_from)
- PLT-008 PLT-008 - Platform (derives_from)
- PLT-009 PLT-009 - Platform (derives_from)
- PLT-012 PLT-012 - Platform (derives_from)
- PLT-014 PLT-014 - Platform (derives_from)
STATEMENT: The engineering platform shall allow remote access to released engineering designs.
ACCEPTANCE: Authorized browser can retrieve released CAD view, requirements, BOM, and reports.
METHOD: Demo
VMODEL_LEVEL: Validation
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
Remote application secrets shall not be embedded in downloaded browser assets.
Security review and secret scanning identify no exposed credentials.
Inspection
Platform
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
-
5. STK-005 - Stakeholder UID: STK-005 STATUS: Draft DOMAIN: Stakeholder RELATIONS (Child): - SYS-010 SYS-010 - System (derives_from)
- FW-010 FW-010 - Firmware (derives_from)
- CAD-001 CAD-001 - CAD (derives_from)
- CAD-007 CAD-007 - CAD (derives_from)
- SIM-001 SIM-001 - Simulation (derives_from)
- SIM-002 SIM-002 - Simulation (derives_from)
- SIM-003 SIM-003 - Simulation (derives_from)
- SIM-004 SIM-004 - Simulation (derives_from)
- SIM-005 SIM-005 - Simulation (derives_from)
- SIM-010 SIM-010 - Simulation (derives_from)
- PLT-004 PLT-004 - Platform (derives_from)
- PLT-006 PLT-006 - Platform (derives_from)
- PLT-010 PLT-010 - Platform (derives_from)
- PLT-011 PLT-011 - Platform (derives_from)
- PLT-013 PLT-013 - Platform (derives_from)
- VER-001 VER-001 - Verification (derives_from)
- VER-002 VER-002 - Verification (derives_from)
- VER-003 VER-003 - Verification (derives_from)
- VER-004 VER-004 - Verification (derives_from)
- VER-005 VER-005 - Verification (derives_from)
- VER-006 VER-006 - Verification (derives_from)
- VER-007 VER-007 - Verification (derives_from)
- VER-008 VER-008 - Verification (derives_from)
- VER-009 VER-009 - Verification (derives_from)
- VER-010 VER-010 - Verification (derives_from)
- MFG-003 MFG-003 - Manufacturing (derives_from)
- MFG-006 MFG-006 - Manufacturing (derives_from)
STATEMENT: The platform shall trace design decisions to requirements and verification evidence.
ACCEPTANCE: Sample 10 requirements traced bidirectionally through implementation and test reports.
METHOD: Inspection
VMODEL_LEVEL: Validation
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
The system shall maintain immutable release manifests.
Release includes refs/hashes for requirements, PCB, CAD, FW, BOM, test evidence.
Test
Platform
V1-12V
Must
Unassigned
Engineering target - proposed
TR-024
HZ-015
Not Run
-
5. STK-005 - Stakeholder UID: STK-005 STATUS: Draft DOMAIN: Stakeholder RELATIONS (Child): - SYS-010 SYS-010 - System (derives_from)
- FW-010 FW-010 - Firmware (derives_from)
- CAD-001 CAD-001 - CAD (derives_from)
- CAD-007 CAD-007 - CAD (derives_from)
- SIM-001 SIM-001 - Simulation (derives_from)
- SIM-002 SIM-002 - Simulation (derives_from)
- SIM-003 SIM-003 - Simulation (derives_from)
- SIM-004 SIM-004 - Simulation (derives_from)
- SIM-005 SIM-005 - Simulation (derives_from)
- SIM-010 SIM-010 - Simulation (derives_from)
- PLT-004 PLT-004 - Platform (derives_from)
- PLT-006 PLT-006 - Platform (derives_from)
- PLT-010 PLT-010 - Platform (derives_from)
- PLT-011 PLT-011 - Platform (derives_from)
- PLT-013 PLT-013 - Platform (derives_from)
- VER-001 VER-001 - Verification (derives_from)
- VER-002 VER-002 - Verification (derives_from)
- VER-003 VER-003 - Verification (derives_from)
- VER-004 VER-004 - Verification (derives_from)
- VER-005 VER-005 - Verification (derives_from)
- VER-006 VER-006 - Verification (derives_from)
- VER-007 VER-007 - Verification (derives_from)
- VER-008 VER-008 - Verification (derives_from)
- VER-009 VER-009 - Verification (derives_from)
- VER-010 VER-010 - Verification (derives_from)
- MFG-003 MFG-003 - Manufacturing (derives_from)
- MFG-006 MFG-006 - Manufacturing (derives_from)
STATEMENT: The platform shall trace design decisions to requirements and verification evidence.
ACCEPTANCE: Sample 10 requirements traced bidirectionally through implementation and test reports.
METHOD: Inspection
VMODEL_LEVEL: Validation
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
The UI shall link each failed test to its governing requirement.
Select failed test and navigate to matching requirement ID and commit.
Demo
Platform
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
-
4. STK-004 - Stakeholder UID: STK-004 STATUS: Draft DOMAIN: Stakeholder RELATIONS (Child): - CAD-006 CAD-006 - CAD (derives_from)
- SIM-009 SIM-009 - Simulation (derives_from)
- PLT-001 PLT-001 - Platform (derives_from)
- PLT-002 PLT-002 - Platform (derives_from)
- PLT-003 PLT-003 - Platform (derives_from)
- PLT-005 PLT-005 - Platform (derives_from)
- PLT-007 PLT-007 - Platform (derives_from)
- PLT-008 PLT-008 - Platform (derives_from)
- PLT-009 PLT-009 - Platform (derives_from)
- PLT-012 PLT-012 - Platform (derives_from)
- PLT-014 PLT-014 - Platform (derives_from)
STATEMENT: The engineering platform shall allow remote access to released engineering designs.
ACCEPTANCE: Authorized browser can retrieve released CAD view, requirements, BOM, and reports.
METHOD: Demo
VMODEL_LEVEL: Validation
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
The platform shall refuse hazardous remote physical-bench actuation without local enable.
Authorization negative test and physical local interlock demonstration pass.
Test
Platform
V1-12V
Must
Unassigned
Engineering target - proposed
TR-023
HZ-013
Not Run
-
5. STK-005 - Stakeholder UID: STK-005 STATUS: Draft DOMAIN: Stakeholder RELATIONS (Child): - SYS-010 SYS-010 - System (derives_from)
- FW-010 FW-010 - Firmware (derives_from)
- CAD-001 CAD-001 - CAD (derives_from)
- CAD-007 CAD-007 - CAD (derives_from)
- SIM-001 SIM-001 - Simulation (derives_from)
- SIM-002 SIM-002 - Simulation (derives_from)
- SIM-003 SIM-003 - Simulation (derives_from)
- SIM-004 SIM-004 - Simulation (derives_from)
- SIM-005 SIM-005 - Simulation (derives_from)
- SIM-010 SIM-010 - Simulation (derives_from)
- PLT-004 PLT-004 - Platform (derives_from)
- PLT-006 PLT-006 - Platform (derives_from)
- PLT-010 PLT-010 - Platform (derives_from)
- PLT-011 PLT-011 - Platform (derives_from)
- PLT-013 PLT-013 - Platform (derives_from)
- VER-001 VER-001 - Verification (derives_from)
- VER-002 VER-002 - Verification (derives_from)
- VER-003 VER-003 - Verification (derives_from)
- VER-004 VER-004 - Verification (derives_from)
- VER-005 VER-005 - Verification (derives_from)
- VER-006 VER-006 - Verification (derives_from)
- VER-007 VER-007 - Verification (derives_from)
- VER-008 VER-008 - Verification (derives_from)
- VER-009 VER-009 - Verification (derives_from)
- VER-010 VER-010 - Verification (derives_from)
- MFG-003 MFG-003 - Manufacturing (derives_from)
- MFG-006 MFG-006 - Manufacturing (derives_from)
STATEMENT: The platform shall trace design decisions to requirements and verification evidence.
ACCEPTANCE: Sample 10 requirements traced bidirectionally through implementation and test reports.
METHOD: Inspection
VMODEL_LEVEL: Validation
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
The platform shall preserve source measurements separately from derived simulation results.
Original datasets content-addressed; transformations separately versioned.
Inspection
Platform
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
-
4. STK-004 - Stakeholder UID: STK-004 STATUS: Draft DOMAIN: Stakeholder RELATIONS (Child): - CAD-006 CAD-006 - CAD (derives_from)
- SIM-009 SIM-009 - Simulation (derives_from)
- PLT-001 PLT-001 - Platform (derives_from)
- PLT-002 PLT-002 - Platform (derives_from)
- PLT-003 PLT-003 - Platform (derives_from)
- PLT-005 PLT-005 - Platform (derives_from)
- PLT-007 PLT-007 - Platform (derives_from)
- PLT-008 PLT-008 - Platform (derives_from)
- PLT-009 PLT-009 - Platform (derives_from)
- PLT-012 PLT-012 - Platform (derives_from)
- PLT-014 PLT-014 - Platform (derives_from)
STATEMENT: The engineering platform shall allow remote access to released engineering designs.
ACCEPTANCE: Authorized browser can retrieve released CAD view, requirements, BOM, and reports.
METHOD: Demo
VMODEL_LEVEL: Validation
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
Users shall see run state, errors, and diagnostic references for failed jobs.
Forced solver failure yields log link, failure code, and no false 'passed' state.
Test
Platform
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
-
5. STK-005 - Stakeholder UID: STK-005 STATUS: Draft DOMAIN: Stakeholder RELATIONS (Child): - SYS-010 SYS-010 - System (derives_from)
- FW-010 FW-010 - Firmware (derives_from)
- CAD-001 CAD-001 - CAD (derives_from)
- CAD-007 CAD-007 - CAD (derives_from)
- SIM-001 SIM-001 - Simulation (derives_from)
- SIM-002 SIM-002 - Simulation (derives_from)
- SIM-003 SIM-003 - Simulation (derives_from)
- SIM-004 SIM-004 - Simulation (derives_from)
- SIM-005 SIM-005 - Simulation (derives_from)
- SIM-010 SIM-010 - Simulation (derives_from)
- PLT-004 PLT-004 - Platform (derives_from)
- PLT-006 PLT-006 - Platform (derives_from)
- PLT-010 PLT-010 - Platform (derives_from)
- PLT-011 PLT-011 - Platform (derives_from)
- PLT-013 PLT-013 - Platform (derives_from)
- VER-001 VER-001 - Verification (derives_from)
- VER-002 VER-002 - Verification (derives_from)
- VER-003 VER-003 - Verification (derives_from)
- VER-004 VER-004 - Verification (derives_from)
- VER-005 VER-005 - Verification (derives_from)
- VER-006 VER-006 - Verification (derives_from)
- VER-007 VER-007 - Verification (derives_from)
- VER-008 VER-008 - Verification (derives_from)
- VER-009 VER-009 - Verification (derives_from)
- VER-010 VER-010 - Verification (derives_from)
- MFG-003 MFG-003 - Manufacturing (derives_from)
- MFG-006 MFG-006 - Manufacturing (derives_from)
STATEMENT: The platform shall trace design decisions to requirements and verification evidence.
ACCEPTANCE: Sample 10 requirements traced bidirectionally through implementation and test reports.
METHOD: Inspection
VMODEL_LEVEL: Validation
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
Every approved engineering requirement shall have a verification method and acceptance criterion.
No approved requirements have blank method, criterion, or verification ID.
Inspection
Process
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
-
5. STK-005 - Stakeholder UID: STK-005 STATUS: Draft DOMAIN: Stakeholder RELATIONS (Child): - SYS-010 SYS-010 - System (derives_from)
- FW-010 FW-010 - Firmware (derives_from)
- CAD-001 CAD-001 - CAD (derives_from)
- CAD-007 CAD-007 - CAD (derives_from)
- SIM-001 SIM-001 - Simulation (derives_from)
- SIM-002 SIM-002 - Simulation (derives_from)
- SIM-003 SIM-003 - Simulation (derives_from)
- SIM-004 SIM-004 - Simulation (derives_from)
- SIM-005 SIM-005 - Simulation (derives_from)
- SIM-010 SIM-010 - Simulation (derives_from)
- PLT-004 PLT-004 - Platform (derives_from)
- PLT-006 PLT-006 - Platform (derives_from)
- PLT-010 PLT-010 - Platform (derives_from)
- PLT-011 PLT-011 - Platform (derives_from)
- PLT-013 PLT-013 - Platform (derives_from)
- VER-001 VER-001 - Verification (derives_from)
- VER-002 VER-002 - Verification (derives_from)
- VER-003 VER-003 - Verification (derives_from)
- VER-004 VER-004 - Verification (derives_from)
- VER-005 VER-005 - Verification (derives_from)
- VER-006 VER-006 - Verification (derives_from)
- VER-007 VER-007 - Verification (derives_from)
- VER-008 VER-008 - Verification (derives_from)
- VER-009 VER-009 - Verification (derives_from)
- VER-010 VER-010 - Verification (derives_from)
- MFG-003 MFG-003 - Manufacturing (derives_from)
- MFG-006 MFG-006 - Manufacturing (derives_from)
STATEMENT: The platform shall trace design decisions to requirements and verification evidence.
ACCEPTANCE: Sample 10 requirements traced bidirectionally through implementation and test reports.
METHOD: Inspection
VMODEL_LEVEL: Validation
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
Safety-critical requirements shall have a hazard link and review approval.
100% safety-tagged requirements linked to at least one risk or safety rationale.
Inspection
Process
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
-
5. STK-005 - Stakeholder UID: STK-005 STATUS: Draft DOMAIN: Stakeholder RELATIONS (Child): - SYS-010 SYS-010 - System (derives_from)
- FW-010 FW-010 - Firmware (derives_from)
- CAD-001 CAD-001 - CAD (derives_from)
- CAD-007 CAD-007 - CAD (derives_from)
- SIM-001 SIM-001 - Simulation (derives_from)
- SIM-002 SIM-002 - Simulation (derives_from)
- SIM-003 SIM-003 - Simulation (derives_from)
- SIM-004 SIM-004 - Simulation (derives_from)
- SIM-005 SIM-005 - Simulation (derives_from)
- SIM-010 SIM-010 - Simulation (derives_from)
- PLT-004 PLT-004 - Platform (derives_from)
- PLT-006 PLT-006 - Platform (derives_from)
- PLT-010 PLT-010 - Platform (derives_from)
- PLT-011 PLT-011 - Platform (derives_from)
- PLT-013 PLT-013 - Platform (derives_from)
- VER-001 VER-001 - Verification (derives_from)
- VER-002 VER-002 - Verification (derives_from)
- VER-003 VER-003 - Verification (derives_from)
- VER-004 VER-004 - Verification (derives_from)
- VER-005 VER-005 - Verification (derives_from)
- VER-006 VER-006 - Verification (derives_from)
- VER-007 VER-007 - Verification (derives_from)
- VER-008 VER-008 - Verification (derives_from)
- VER-009 VER-009 - Verification (derives_from)
- VER-010 VER-010 - Verification (derives_from)
- MFG-003 MFG-003 - Manufacturing (derives_from)
- MFG-006 MFG-006 - Manufacturing (derives_from)
STATEMENT: The platform shall trace design decisions to requirements and verification evidence.
ACCEPTANCE: Sample 10 requirements traced bidirectionally through implementation and test reports.
METHOD: Inspection
VMODEL_LEVEL: Validation
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
Test cases shall identify setup, stimuli, expected result, actual result and artifacts.
Sample tests contain all fields and independent rerun possible.
Inspection
Process
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
-
5. STK-005 - Stakeholder UID: STK-005 STATUS: Draft DOMAIN: Stakeholder RELATIONS (Child): - SYS-010 SYS-010 - System (derives_from)
- FW-010 FW-010 - Firmware (derives_from)
- CAD-001 CAD-001 - CAD (derives_from)
- CAD-007 CAD-007 - CAD (derives_from)
- SIM-001 SIM-001 - Simulation (derives_from)
- SIM-002 SIM-002 - Simulation (derives_from)
- SIM-003 SIM-003 - Simulation (derives_from)
- SIM-004 SIM-004 - Simulation (derives_from)
- SIM-005 SIM-005 - Simulation (derives_from)
- SIM-010 SIM-010 - Simulation (derives_from)
- PLT-004 PLT-004 - Platform (derives_from)
- PLT-006 PLT-006 - Platform (derives_from)
- PLT-010 PLT-010 - Platform (derives_from)
- PLT-011 PLT-011 - Platform (derives_from)
- PLT-013 PLT-013 - Platform (derives_from)
- VER-001 VER-001 - Verification (derives_from)
- VER-002 VER-002 - Verification (derives_from)
- VER-003 VER-003 - Verification (derives_from)
- VER-004 VER-004 - Verification (derives_from)
- VER-005 VER-005 - Verification (derives_from)
- VER-006 VER-006 - Verification (derives_from)
- VER-007 VER-007 - Verification (derives_from)
- VER-008 VER-008 - Verification (derives_from)
- VER-009 VER-009 - Verification (derives_from)
- VER-010 VER-010 - Verification (derives_from)
- MFG-003 MFG-003 - Manufacturing (derives_from)
- MFG-006 MFG-006 - Manufacturing (derives_from)
STATEMENT: The platform shall trace design decisions to requirements and verification evidence.
ACCEPTANCE: Sample 10 requirements traced bidirectionally through implementation and test reports.
METHOD: Inspection
VMODEL_LEVEL: Validation
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
Verification results shall distinguish Passed, Failed, Blocked and Not Run.
Report schema validation rejects ambiguous status labels.
Test
Process
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
-
5. STK-005 - Stakeholder UID: STK-005 STATUS: Draft DOMAIN: Stakeholder RELATIONS (Child): - SYS-010 SYS-010 - System (derives_from)
- FW-010 FW-010 - Firmware (derives_from)
- CAD-001 CAD-001 - CAD (derives_from)
- CAD-007 CAD-007 - CAD (derives_from)
- SIM-001 SIM-001 - Simulation (derives_from)
- SIM-002 SIM-002 - Simulation (derives_from)
- SIM-003 SIM-003 - Simulation (derives_from)
- SIM-004 SIM-004 - Simulation (derives_from)
- SIM-005 SIM-005 - Simulation (derives_from)
- SIM-010 SIM-010 - Simulation (derives_from)
- PLT-004 PLT-004 - Platform (derives_from)
- PLT-006 PLT-006 - Platform (derives_from)
- PLT-010 PLT-010 - Platform (derives_from)
- PLT-011 PLT-011 - Platform (derives_from)
- PLT-013 PLT-013 - Platform (derives_from)
- VER-001 VER-001 - Verification (derives_from)
- VER-002 VER-002 - Verification (derives_from)
- VER-003 VER-003 - Verification (derives_from)
- VER-004 VER-004 - Verification (derives_from)
- VER-005 VER-005 - Verification (derives_from)
- VER-006 VER-006 - Verification (derives_from)
- VER-007 VER-007 - Verification (derives_from)
- VER-008 VER-008 - Verification (derives_from)
- VER-009 VER-009 - Verification (derives_from)
- VER-010 VER-010 - Verification (derives_from)
- MFG-003 MFG-003 - Manufacturing (derives_from)
- MFG-006 MFG-006 - Manufacturing (derives_from)
STATEMENT: The platform shall trace design decisions to requirements and verification evidence.
ACCEPTANCE: Sample 10 requirements traced bidirectionally through implementation and test reports.
METHOD: Inspection
VMODEL_LEVEL: Validation
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
The system shall prohibit release on unresolved critical verification failures.
Synthetic critical failure blocks release gate automatically.
Test
Process
V1-12V
Must
Unassigned
Engineering target - proposed
TR-025
Not Run
-
5. STK-005 - Stakeholder UID: STK-005 STATUS: Draft DOMAIN: Stakeholder RELATIONS (Child): - SYS-010 SYS-010 - System (derives_from)
- FW-010 FW-010 - Firmware (derives_from)
- CAD-001 CAD-001 - CAD (derives_from)
- CAD-007 CAD-007 - CAD (derives_from)
- SIM-001 SIM-001 - Simulation (derives_from)
- SIM-002 SIM-002 - Simulation (derives_from)
- SIM-003 SIM-003 - Simulation (derives_from)
- SIM-004 SIM-004 - Simulation (derives_from)
- SIM-005 SIM-005 - Simulation (derives_from)
- SIM-010 SIM-010 - Simulation (derives_from)
- PLT-004 PLT-004 - Platform (derives_from)
- PLT-006 PLT-006 - Platform (derives_from)
- PLT-010 PLT-010 - Platform (derives_from)
- PLT-011 PLT-011 - Platform (derives_from)
- PLT-013 PLT-013 - Platform (derives_from)
- VER-001 VER-001 - Verification (derives_from)
- VER-002 VER-002 - Verification (derives_from)
- VER-003 VER-003 - Verification (derives_from)
- VER-004 VER-004 - Verification (derives_from)
- VER-005 VER-005 - Verification (derives_from)
- VER-006 VER-006 - Verification (derives_from)
- VER-007 VER-007 - Verification (derives_from)
- VER-008 VER-008 - Verification (derives_from)
- VER-009 VER-009 - Verification (derives_from)
- VER-010 VER-010 - Verification (derives_from)
- MFG-003 MFG-003 - Manufacturing (derives_from)
- MFG-006 MFG-006 - Manufacturing (derives_from)
STATEMENT: The platform shall trace design decisions to requirements and verification evidence.
ACCEPTANCE: Sample 10 requirements traced bidirectionally through implementation and test reports.
METHOD: Inspection
VMODEL_LEVEL: Validation
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
Test equipment shall be linked to calibration status and uncertainty.
Each measurement-based test has instrument ID, calibration date, uncertainty.
Inspection
Process
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
-
5. STK-005 - Stakeholder UID: STK-005 STATUS: Draft DOMAIN: Stakeholder RELATIONS (Child): - SYS-010 SYS-010 - System (derives_from)
- FW-010 FW-010 - Firmware (derives_from)
- CAD-001 CAD-001 - CAD (derives_from)
- CAD-007 CAD-007 - CAD (derives_from)
- SIM-001 SIM-001 - Simulation (derives_from)
- SIM-002 SIM-002 - Simulation (derives_from)
- SIM-003 SIM-003 - Simulation (derives_from)
- SIM-004 SIM-004 - Simulation (derives_from)
- SIM-005 SIM-005 - Simulation (derives_from)
- SIM-010 SIM-010 - Simulation (derives_from)
- PLT-004 PLT-004 - Platform (derives_from)
- PLT-006 PLT-006 - Platform (derives_from)
- PLT-010 PLT-010 - Platform (derives_from)
- PLT-011 PLT-011 - Platform (derives_from)
- PLT-013 PLT-013 - Platform (derives_from)
- VER-001 VER-001 - Verification (derives_from)
- VER-002 VER-002 - Verification (derives_from)
- VER-003 VER-003 - Verification (derives_from)
- VER-004 VER-004 - Verification (derives_from)
- VER-005 VER-005 - Verification (derives_from)
- VER-006 VER-006 - Verification (derives_from)
- VER-007 VER-007 - Verification (derives_from)
- VER-008 VER-008 - Verification (derives_from)
- VER-009 VER-009 - Verification (derives_from)
- VER-010 VER-010 - Verification (derives_from)
- MFG-003 MFG-003 - Manufacturing (derives_from)
- MFG-006 MFG-006 - Manufacturing (derives_from)
STATEMENT: The platform shall trace design decisions to requirements and verification evidence.
ACCEPTANCE: Sample 10 requirements traced bidirectionally through implementation and test reports.
METHOD: Inspection
VMODEL_LEVEL: Validation
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
Requirement changes after baseline shall trigger impact analysis.
Diff lists affected architecture elements, CAD, PCB, FW and test IDs.
Demo
Process
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
-
5. STK-005 - Stakeholder UID: STK-005 STATUS: Draft DOMAIN: Stakeholder RELATIONS (Child): - SYS-010 SYS-010 - System (derives_from)
- FW-010 FW-010 - Firmware (derives_from)
- CAD-001 CAD-001 - CAD (derives_from)
- CAD-007 CAD-007 - CAD (derives_from)
- SIM-001 SIM-001 - Simulation (derives_from)
- SIM-002 SIM-002 - Simulation (derives_from)
- SIM-003 SIM-003 - Simulation (derives_from)
- SIM-004 SIM-004 - Simulation (derives_from)
- SIM-005 SIM-005 - Simulation (derives_from)
- SIM-010 SIM-010 - Simulation (derives_from)
- PLT-004 PLT-004 - Platform (derives_from)
- PLT-006 PLT-006 - Platform (derives_from)
- PLT-010 PLT-010 - Platform (derives_from)
- PLT-011 PLT-011 - Platform (derives_from)
- PLT-013 PLT-013 - Platform (derives_from)
- VER-001 VER-001 - Verification (derives_from)
- VER-002 VER-002 - Verification (derives_from)
- VER-003 VER-003 - Verification (derives_from)
- VER-004 VER-004 - Verification (derives_from)
- VER-005 VER-005 - Verification (derives_from)
- VER-006 VER-006 - Verification (derives_from)
- VER-007 VER-007 - Verification (derives_from)
- VER-008 VER-008 - Verification (derives_from)
- VER-009 VER-009 - Verification (derives_from)
- VER-010 VER-010 - Verification (derives_from)
- MFG-003 MFG-003 - Manufacturing (derives_from)
- MFG-006 MFG-006 - Manufacturing (derives_from)
STATEMENT: The platform shall trace design decisions to requirements and verification evidence.
ACCEPTANCE: Sample 10 requirements traced bidirectionally through implementation and test reports.
METHOD: Inspection
VMODEL_LEVEL: Validation
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
System validation shall be distinguished from specification verification.
V&V plan provides separate user-need acceptance and compliance evidence.
Review
Process
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
-
5. STK-005 - Stakeholder UID: STK-005 STATUS: Draft DOMAIN: Stakeholder RELATIONS (Child): - SYS-010 SYS-010 - System (derives_from)
- FW-010 FW-010 - Firmware (derives_from)
- CAD-001 CAD-001 - CAD (derives_from)
- CAD-007 CAD-007 - CAD (derives_from)
- SIM-001 SIM-001 - Simulation (derives_from)
- SIM-002 SIM-002 - Simulation (derives_from)
- SIM-003 SIM-003 - Simulation (derives_from)
- SIM-004 SIM-004 - Simulation (derives_from)
- SIM-005 SIM-005 - Simulation (derives_from)
- SIM-010 SIM-010 - Simulation (derives_from)
- PLT-004 PLT-004 - Platform (derives_from)
- PLT-006 PLT-006 - Platform (derives_from)
- PLT-010 PLT-010 - Platform (derives_from)
- PLT-011 PLT-011 - Platform (derives_from)
- PLT-013 PLT-013 - Platform (derives_from)
- VER-001 VER-001 - Verification (derives_from)
- VER-002 VER-002 - Verification (derives_from)
- VER-003 VER-003 - Verification (derives_from)
- VER-004 VER-004 - Verification (derives_from)
- VER-005 VER-005 - Verification (derives_from)
- VER-006 VER-006 - Verification (derives_from)
- VER-007 VER-007 - Verification (derives_from)
- VER-008 VER-008 - Verification (derives_from)
- VER-009 VER-009 - Verification (derives_from)
- VER-010 VER-010 - Verification (derives_from)
- MFG-003 MFG-003 - Manufacturing (derives_from)
- MFG-006 MFG-006 - Manufacturing (derives_from)
STATEMENT: The platform shall trace design decisions to requirements and verification evidence.
ACCEPTANCE: Sample 10 requirements traced bidirectionally through implementation and test reports.
METHOD: Inspection
VMODEL_LEVEL: Validation
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
Fault injection shall never energize an unguarded hazardous battery bench remotely.
Interlock validation rejects remote command in unsafe configuration.
Test
Process
V1-12V
Must
Unassigned
Engineering target - proposed
HZ-013
Not Run
-
5. STK-005 - Stakeholder UID: STK-005 STATUS: Draft DOMAIN: Stakeholder RELATIONS (Child): - SYS-010 SYS-010 - System (derives_from)
- FW-010 FW-010 - Firmware (derives_from)
- CAD-001 CAD-001 - CAD (derives_from)
- CAD-007 CAD-007 - CAD (derives_from)
- SIM-001 SIM-001 - Simulation (derives_from)
- SIM-002 SIM-002 - Simulation (derives_from)
- SIM-003 SIM-003 - Simulation (derives_from)
- SIM-004 SIM-004 - Simulation (derives_from)
- SIM-005 SIM-005 - Simulation (derives_from)
- SIM-010 SIM-010 - Simulation (derives_from)
- PLT-004 PLT-004 - Platform (derives_from)
- PLT-006 PLT-006 - Platform (derives_from)
- PLT-010 PLT-010 - Platform (derives_from)
- PLT-011 PLT-011 - Platform (derives_from)
- PLT-013 PLT-013 - Platform (derives_from)
- VER-001 VER-001 - Verification (derives_from)
- VER-002 VER-002 - Verification (derives_from)
- VER-003 VER-003 - Verification (derives_from)
- VER-004 VER-004 - Verification (derives_from)
- VER-005 VER-005 - Verification (derives_from)
- VER-006 VER-006 - Verification (derives_from)
- VER-007 VER-007 - Verification (derives_from)
- VER-008 VER-008 - Verification (derives_from)
- VER-009 VER-009 - Verification (derives_from)
- VER-010 VER-010 - Verification (derives_from)
- MFG-003 MFG-003 - Manufacturing (derives_from)
- MFG-006 MFG-006 - Manufacturing (derives_from)
STATEMENT: The platform shall trace design decisions to requirements and verification evidence.
ACCEPTANCE: Sample 10 requirements traced bidirectionally through implementation and test reports.
METHOD: Inspection
VMODEL_LEVEL: Validation
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
Regression suites shall run on every controlled software change.
CI report records pass/fail, commit and test count for each merge.
Test
Process
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
-
6. STK-006 - Stakeholder UID: STK-006 STATUS: Draft DOMAIN: Stakeholder RELATIONS (Child): - CAD-005 CAD-005 - CAD (derives_from)
- BOM-001 BOM-001 - BOM (derives_from)
- BOM-002 BOM-002 - BOM (derives_from)
- BOM-003 BOM-003 - BOM (derives_from)
- BOM-004 BOM-004 - BOM (derives_from)
- BOM-005 BOM-005 - BOM (derives_from)
- BOM-006 BOM-006 - BOM (derives_from)
- BOM-007 BOM-007 - BOM (derives_from)
- MFG-001 MFG-001 - Manufacturing (derives_from)
- MFG-004 MFG-004 - Manufacturing (derives_from)
STATEMENT: The project shall maintain a costed production BOM and approved alternatives.
ACCEPTANCE: 100% of released purchasable parts have source, quantity, cost and lifecycle status.
METHOD: Inspection
VMODEL_LEVEL: Validation
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
Every approved purchasable part shall have a unique ID and revision.
100% released parts have part numbers, approved footprint or spec and revision.
Inspection
Process
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
-
6. STK-006 - Stakeholder UID: STK-006 STATUS: Draft DOMAIN: Stakeholder RELATIONS (Child): - CAD-005 CAD-005 - CAD (derives_from)
- BOM-001 BOM-001 - BOM (derives_from)
- BOM-002 BOM-002 - BOM (derives_from)
- BOM-003 BOM-003 - BOM (derives_from)
- BOM-004 BOM-004 - BOM (derives_from)
- BOM-005 BOM-005 - BOM (derives_from)
- BOM-006 BOM-006 - BOM (derives_from)
- BOM-007 BOM-007 - BOM (derives_from)
- MFG-001 MFG-001 - Manufacturing (derives_from)
- MFG-004 MFG-004 - Manufacturing (derives_from)
STATEMENT: The project shall maintain a costed production BOM and approved alternatives.
ACCEPTANCE: 100% of released purchasable parts have source, quantity, cost and lifecycle status.
METHOD: Inspection
VMODEL_LEVEL: Validation
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
The BOM shall separate cell, BMS, enclosure, harness and assembly cost.
Cost rollup correctly sums subassembly and unit totals.
Test
Process
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
-
6. STK-006 - Stakeholder UID: STK-006 STATUS: Draft DOMAIN: Stakeholder RELATIONS (Child): - CAD-005 CAD-005 - CAD (derives_from)
- BOM-001 BOM-001 - BOM (derives_from)
- BOM-002 BOM-002 - BOM (derives_from)
- BOM-003 BOM-003 - BOM (derives_from)
- BOM-004 BOM-004 - BOM (derives_from)
- BOM-005 BOM-005 - BOM (derives_from)
- BOM-006 BOM-006 - BOM (derives_from)
- BOM-007 BOM-007 - BOM (derives_from)
- MFG-001 MFG-001 - Manufacturing (derives_from)
- MFG-004 MFG-004 - Manufacturing (derives_from)
STATEMENT: The project shall maintain a costed production BOM and approved alternatives.
ACCEPTANCE: 100% of released purchasable parts have source, quantity, cost and lifecycle status.
METHOD: Inspection
VMODEL_LEVEL: Validation
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
Unit cost shall be calculated at prototype, 100 and 10000-unit quantities.
Cost rollup produces price breaks with quote dates and currency.
Test
Process
V1-12V
Must
Unassigned
Engineering target - proposed
TR-026
Not Run
-
6. STK-006 - Stakeholder UID: STK-006 STATUS: Draft DOMAIN: Stakeholder RELATIONS (Child): - CAD-005 CAD-005 - CAD (derives_from)
- BOM-001 BOM-001 - BOM (derives_from)
- BOM-002 BOM-002 - BOM (derives_from)
- BOM-003 BOM-003 - BOM (derives_from)
- BOM-004 BOM-004 - BOM (derives_from)
- BOM-005 BOM-005 - BOM (derives_from)
- BOM-006 BOM-006 - BOM (derives_from)
- BOM-007 BOM-007 - BOM (derives_from)
- MFG-001 MFG-001 - Manufacturing (derives_from)
- MFG-004 MFG-004 - Manufacturing (derives_from)
STATEMENT: The project shall maintain a costed production BOM and approved alternatives.
ACCEPTANCE: 100% of released purchasable parts have source, quantity, cost and lifecycle status.
METHOD: Inspection
VMODEL_LEVEL: Validation
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
Approved alternates shall preserve form-fit-function and qualification evidence.
Replacement cannot be marked approved without referenced validation.
Inspection
Process
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
-
6. STK-006 - Stakeholder UID: STK-006 STATUS: Draft DOMAIN: Stakeholder RELATIONS (Child): - CAD-005 CAD-005 - CAD (derives_from)
- BOM-001 BOM-001 - BOM (derives_from)
- BOM-002 BOM-002 - BOM (derives_from)
- BOM-003 BOM-003 - BOM (derives_from)
- BOM-004 BOM-004 - BOM (derives_from)
- BOM-005 BOM-005 - BOM (derives_from)
- BOM-006 BOM-006 - BOM (derives_from)
- BOM-007 BOM-007 - BOM (derives_from)
- MFG-001 MFG-001 - Manufacturing (derives_from)
- MFG-004 MFG-004 - Manufacturing (derives_from)
STATEMENT: The project shall maintain a costed production BOM and approved alternatives.
ACCEPTANCE: 100% of released purchasable parts have source, quantity, cost and lifecycle status.
METHOD: Inspection
VMODEL_LEVEL: Validation
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
The platform shall flag obsolete or single-source critical parts.
Artificial supplier change triggers lifecycle risk flag.
Test
Platform
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
-
6. STK-006 - Stakeholder UID: STK-006 STATUS: Draft DOMAIN: Stakeholder RELATIONS (Child): - CAD-005 CAD-005 - CAD (derives_from)
- BOM-001 BOM-001 - BOM (derives_from)
- BOM-002 BOM-002 - BOM (derives_from)
- BOM-003 BOM-003 - BOM (derives_from)
- BOM-004 BOM-004 - BOM (derives_from)
- BOM-005 BOM-005 - BOM (derives_from)
- BOM-006 BOM-006 - BOM (derives_from)
- BOM-007 BOM-007 - BOM (derives_from)
- MFG-001 MFG-001 - Manufacturing (derives_from)
- MFG-004 MFG-004 - Manufacturing (derives_from)
STATEMENT: The project shall maintain a costed production BOM and approved alternatives.
ACCEPTANCE: 100% of released purchasable parts have source, quantity, cost and lifecycle status.
METHOD: Inspection
VMODEL_LEVEL: Validation
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
The system shall calculate estimated landed cost using separated assumptions.
Formula validation covers price, scrap, assembly, freight and test yield.
Test
Platform
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
-
6. STK-006 - Stakeholder UID: STK-006 STATUS: Draft DOMAIN: Stakeholder RELATIONS (Child): - CAD-005 CAD-005 - CAD (derives_from)
- BOM-001 BOM-001 - BOM (derives_from)
- BOM-002 BOM-002 - BOM (derives_from)
- BOM-003 BOM-003 - BOM (derives_from)
- BOM-004 BOM-004 - BOM (derives_from)
- BOM-005 BOM-005 - BOM (derives_from)
- BOM-006 BOM-006 - BOM (derives_from)
- BOM-007 BOM-007 - BOM (derives_from)
- MFG-001 MFG-001 - Manufacturing (derives_from)
- MFG-004 MFG-004 - Manufacturing (derives_from)
STATEMENT: The project shall maintain a costed production BOM and approved alternatives.
ACCEPTANCE: 100% of released purchasable parts have source, quantity, cost and lifecycle status.
METHOD: Inspection
VMODEL_LEVEL: Validation
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
Any BOM cost comparison shall identify assumptions and quote validity.
100% review samples show quote date and currency normalization.
Inspection
Process
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
-
6. STK-006 - Stakeholder UID: STK-006 STATUS: Draft DOMAIN: Stakeholder RELATIONS (Child): - CAD-005 CAD-005 - CAD (derives_from)
- BOM-001 BOM-001 - BOM (derives_from)
- BOM-002 BOM-002 - BOM (derives_from)
- BOM-003 BOM-003 - BOM (derives_from)
- BOM-004 BOM-004 - BOM (derives_from)
- BOM-005 BOM-005 - BOM (derives_from)
- BOM-006 BOM-006 - BOM (derives_from)
- BOM-007 BOM-007 - BOM (derives_from)
- MFG-001 MFG-001 - Manufacturing (derives_from)
- MFG-004 MFG-004 - Manufacturing (derives_from)
STATEMENT: The project shall maintain a costed production BOM and approved alternatives.
ACCEPTANCE: 100% of released purchasable parts have source, quantity, cost and lifecycle status.
METHOD: Inspection
VMODEL_LEVEL: Validation
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
The pack shall have a defined assembly process with controlled order of operations.
Approved work instructions identify each critical step and hazard.
Inspection
Process
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
-
17. SYS-007 - System UID: SYS-007 STATUS: Draft DOMAIN: System PARENT: STK-003 RELATIONS (Parent): RELATIONS (Child): STATEMENT: The pack shall incorporate a coordinated fuse and electronic protection concept.
ACCEPTANCE: Safety review validates fuse ratings, FET SOA, fault energy, wiring, and disconnection behavior.
METHOD: Analysis
VMODEL_LEVEL: System
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
HAZARD_IDS: HZ-002, HZ-007
EXECUTION: Not Run
Pack terminal, fuse and busbar assembly shall have prescribed inspection checks.
EOL checklist verifies polarity, continuity and fastener records.
Test
System
V1-12V
Must
Unassigned
Engineering target - proposed
HZ-004
Not Run
-
5. STK-005 - Stakeholder UID: STK-005 STATUS: Draft DOMAIN: Stakeholder RELATIONS (Child): - SYS-010 SYS-010 - System (derives_from)
- FW-010 FW-010 - Firmware (derives_from)
- CAD-001 CAD-001 - CAD (derives_from)
- CAD-007 CAD-007 - CAD (derives_from)
- SIM-001 SIM-001 - Simulation (derives_from)
- SIM-002 SIM-002 - Simulation (derives_from)
- SIM-003 SIM-003 - Simulation (derives_from)
- SIM-004 SIM-004 - Simulation (derives_from)
- SIM-005 SIM-005 - Simulation (derives_from)
- SIM-010 SIM-010 - Simulation (derives_from)
- PLT-004 PLT-004 - Platform (derives_from)
- PLT-006 PLT-006 - Platform (derives_from)
- PLT-010 PLT-010 - Platform (derives_from)
- PLT-011 PLT-011 - Platform (derives_from)
- PLT-013 PLT-013 - Platform (derives_from)
- VER-001 VER-001 - Verification (derives_from)
- VER-002 VER-002 - Verification (derives_from)
- VER-003 VER-003 - Verification (derives_from)
- VER-004 VER-004 - Verification (derives_from)
- VER-005 VER-005 - Verification (derives_from)
- VER-006 VER-006 - Verification (derives_from)
- VER-007 VER-007 - Verification (derives_from)
- VER-008 VER-008 - Verification (derives_from)
- VER-009 VER-009 - Verification (derives_from)
- VER-010 VER-010 - Verification (derives_from)
- MFG-003 MFG-003 - Manufacturing (derives_from)
- MFG-006 MFG-006 - Manufacturing (derives_from)
STATEMENT: The platform shall trace design decisions to requirements and verification evidence.
ACCEPTANCE: Sample 10 requirements traced bidirectionally through implementation and test reports.
METHOD: Inspection
VMODEL_LEVEL: Validation
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
Each assembled pack shall carry serial and test result identity.
Physical label resolves to build record, lot, FW and test data.
Test
System
V1-12V
Must
Unassigned
Engineering target - proposed
TR-027
Not Run
-
6. STK-006 - Stakeholder UID: STK-006 STATUS: Draft DOMAIN: Stakeholder RELATIONS (Child): - CAD-005 CAD-005 - CAD (derives_from)
- BOM-001 BOM-001 - BOM (derives_from)
- BOM-002 BOM-002 - BOM (derives_from)
- BOM-003 BOM-003 - BOM (derives_from)
- BOM-004 BOM-004 - BOM (derives_from)
- BOM-005 BOM-005 - BOM (derives_from)
- BOM-006 BOM-006 - BOM (derives_from)
- BOM-007 BOM-007 - BOM (derives_from)
- MFG-001 MFG-001 - Manufacturing (derives_from)
- MFG-004 MFG-004 - Manufacturing (derives_from)
STATEMENT: The project shall maintain a costed production BOM and approved alternatives.
ACCEPTANCE: 100% of released purchasable parts have source, quantity, cost and lifecycle status.
METHOD: Inspection
VMODEL_LEVEL: Validation
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
The project shall calculate yield-adjusted production BOM cost.
Production estimate formula tests pass for multiple scrap/yield inputs.
Test
Process
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
-
3. STK-003 - Stakeholder UID: STK-003 STATUS: Draft DOMAIN: Stakeholder RELATIONS (Child): STATEMENT: The product shall prevent hazardous electrical and thermal operating states.
ACCEPTANCE: Hazard review identifies controls and verification for each unacceptable risk.
METHOD: Review
VMODEL_LEVEL: Validation
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
Release documents shall include safe shipping and handling requirements.
Reviewed handling procedure and applicable transport compliance matrix exist.
Inspection
Process
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
-
5. STK-005 - Stakeholder UID: STK-005 STATUS: Draft DOMAIN: Stakeholder RELATIONS (Child): - SYS-010 SYS-010 - System (derives_from)
- FW-010 FW-010 - Firmware (derives_from)
- CAD-001 CAD-001 - CAD (derives_from)
- CAD-007 CAD-007 - CAD (derives_from)
- SIM-001 SIM-001 - Simulation (derives_from)
- SIM-002 SIM-002 - Simulation (derives_from)
- SIM-003 SIM-003 - Simulation (derives_from)
- SIM-004 SIM-004 - Simulation (derives_from)
- SIM-005 SIM-005 - Simulation (derives_from)
- SIM-010 SIM-010 - Simulation (derives_from)
- PLT-004 PLT-004 - Platform (derives_from)
- PLT-006 PLT-006 - Platform (derives_from)
- PLT-010 PLT-010 - Platform (derives_from)
- PLT-011 PLT-011 - Platform (derives_from)
- PLT-013 PLT-013 - Platform (derives_from)
- VER-001 VER-001 - Verification (derives_from)
- VER-002 VER-002 - Verification (derives_from)
- VER-003 VER-003 - Verification (derives_from)
- VER-004 VER-004 - Verification (derives_from)
- VER-005 VER-005 - Verification (derives_from)
- VER-006 VER-006 - Verification (derives_from)
- VER-007 VER-007 - Verification (derives_from)
- VER-008 VER-008 - Verification (derives_from)
- VER-009 VER-009 - Verification (derives_from)
- VER-010 VER-010 - Verification (derives_from)
- MFG-003 MFG-003 - Manufacturing (derives_from)
- MFG-006 MFG-006 - Manufacturing (derives_from)
STATEMENT: The platform shall trace design decisions to requirements and verification evidence.
ACCEPTANCE: Sample 10 requirements traced bidirectionally through implementation and test reports.
METHOD: Inspection
VMODEL_LEVEL: Validation
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
Firmware programming and configuration shall be logged during end-of-line test.
EOL record captures image hash, settings CRC and measured calibration data.
Test
System
V1-12V
Must
Unassigned
Engineering target - proposed
Not Run
-
7. STK-007 - Stakeholder UID: STK-007 STATUS: Draft DOMAIN: Stakeholder RELATIONS (Child): - CAD-002 CAD-002 - CAD (derives_from)
- SCL-001 SCL-001 - Scale-up (derives_from)
- SCL-002 SCL-002 - Scale-up (derives_from)
- SCL-003 SCL-003 - Scale-up (derives_from)
- SCL-004 SCL-004 - Scale-up (derives_from)
- SCL-005 SCL-005 - Scale-up (derives_from)
- SCL-006 SCL-006 - Scale-up (derives_from)
- SCL-007 SCL-007 - Scale-up (derives_from)
- SCL-008 SCL-008 - Scale-up (derives_from)
STATEMENT: The product family shall support 24 V, 48 V and 72 V-class variants through controlled reuse.
ACCEPTANCE: Family architecture defines reusable and variant-specific assets with no safety assumptions inherited implicitly.
METHOD: Review
VMODEL_LEVEL: Validation
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
The family architecture shall separate hardware-dependent protection from portable firmware logic.
Design review identifies abstraction interfaces and variant-specific drivers.
Inspection
Architecture
V2+
Must
Unassigned
Engineering target - proposed
Not Run
-
7. STK-007 - Stakeholder UID: STK-007 STATUS: Draft DOMAIN: Stakeholder RELATIONS (Child): - CAD-002 CAD-002 - CAD (derives_from)
- SCL-001 SCL-001 - Scale-up (derives_from)
- SCL-002 SCL-002 - Scale-up (derives_from)
- SCL-003 SCL-003 - Scale-up (derives_from)
- SCL-004 SCL-004 - Scale-up (derives_from)
- SCL-005 SCL-005 - Scale-up (derives_from)
- SCL-006 SCL-006 - Scale-up (derives_from)
- SCL-007 SCL-007 - Scale-up (derives_from)
- SCL-008 SCL-008 - Scale-up (derives_from)
STATEMENT: The product family shall support 24 V, 48 V and 72 V-class variants through controlled reuse.
ACCEPTANCE: Family architecture defines reusable and variant-specific assets with no safety assumptions inherited implicitly.
METHOD: Review
VMODEL_LEVEL: Validation
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
The platform shall reject designs where maximum pack voltage exceeds rated components.
Static rule uses cell upper limit * series count against rated design envelope.
Test
Platform
V2+
Must
Unassigned
Engineering target - proposed
HZ-014
Not Run
-
7. STK-007 - Stakeholder UID: STK-007 STATUS: Draft DOMAIN: Stakeholder RELATIONS (Child): - CAD-002 CAD-002 - CAD (derives_from)
- SCL-001 SCL-001 - Scale-up (derives_from)
- SCL-002 SCL-002 - Scale-up (derives_from)
- SCL-003 SCL-003 - Scale-up (derives_from)
- SCL-004 SCL-004 - Scale-up (derives_from)
- SCL-005 SCL-005 - Scale-up (derives_from)
- SCL-006 SCL-006 - Scale-up (derives_from)
- SCL-007 SCL-007 - Scale-up (derives_from)
- SCL-008 SCL-008 - Scale-up (derives_from)
STATEMENT: The product family shall support 24 V, 48 V and 72 V-class variants through controlled reuse.
ACCEPTANCE: Family architecture defines reusable and variant-specific assets with no safety assumptions inherited implicitly.
METHOD: Review
VMODEL_LEVEL: Validation
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
The 8S variant shall receive its own sensing and power protection review.
8S architecture sign-off includes sensor, FET, charger, thermal and fuse design.
Review
Architecture
V2+
Must
Unassigned
Engineering target - proposed
Not Run
-
7. STK-007 - Stakeholder UID: STK-007 STATUS: Draft DOMAIN: Stakeholder RELATIONS (Child): - CAD-002 CAD-002 - CAD (derives_from)
- SCL-001 SCL-001 - Scale-up (derives_from)
- SCL-002 SCL-002 - Scale-up (derives_from)
- SCL-003 SCL-003 - Scale-up (derives_from)
- SCL-004 SCL-004 - Scale-up (derives_from)
- SCL-005 SCL-005 - Scale-up (derives_from)
- SCL-006 SCL-006 - Scale-up (derives_from)
- SCL-007 SCL-007 - Scale-up (derives_from)
- SCL-008 SCL-008 - Scale-up (derives_from)
STATEMENT: The product family shall support 24 V, 48 V and 72 V-class variants through controlled reuse.
ACCEPTANCE: Family architecture defines reusable and variant-specific assets with no safety assumptions inherited implicitly.
METHOD: Review
VMODEL_LEVEL: Validation
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
The 16S variant shall receive separate voltage/clearance and protection validation.
16S revision has independent electrical and mechanical verification plan.
Review
Architecture
V3+
Must
Unassigned
Engineering target - proposed
Not Run
-
7. STK-007 - Stakeholder UID: STK-007 STATUS: Draft DOMAIN: Stakeholder RELATIONS (Child): - CAD-002 CAD-002 - CAD (derives_from)
- SCL-001 SCL-001 - Scale-up (derives_from)
- SCL-002 SCL-002 - Scale-up (derives_from)
- SCL-003 SCL-003 - Scale-up (derives_from)
- SCL-004 SCL-004 - Scale-up (derives_from)
- SCL-005 SCL-005 - Scale-up (derives_from)
- SCL-006 SCL-006 - Scale-up (derives_from)
- SCL-007 SCL-007 - Scale-up (derives_from)
- SCL-008 SCL-008 - Scale-up (derives_from)
STATEMENT: The product family shall support 24 V, 48 V and 72 V-class variants through controlled reuse.
ACCEPTANCE: Family architecture defines reusable and variant-specific assets with no safety assumptions inherited implicitly.
METHOD: Review
VMODEL_LEVEL: Validation
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
The 72 V-class variant shall define nominal and absolute maximum voltage explicitly.
System datasheet declares chemistry, series count and maximum charged voltage.
Inspection
Architecture
V4+
Must
Unassigned
Engineering target - proposed
HZ-014
Not Run
-
7. STK-007 - Stakeholder UID: STK-007 STATUS: Draft DOMAIN: Stakeholder RELATIONS (Child): - CAD-002 CAD-002 - CAD (derives_from)
- SCL-001 SCL-001 - Scale-up (derives_from)
- SCL-002 SCL-002 - Scale-up (derives_from)
- SCL-003 SCL-003 - Scale-up (derives_from)
- SCL-004 SCL-004 - Scale-up (derives_from)
- SCL-005 SCL-005 - Scale-up (derives_from)
- SCL-006 SCL-006 - Scale-up (derives_from)
- SCL-007 SCL-007 - Scale-up (derives_from)
- SCL-008 SCL-008 - Scale-up (derives_from)
STATEMENT: The product family shall support 24 V, 48 V and 72 V-class variants through controlled reuse.
ACCEPTANCE: Family architecture defines reusable and variant-specific assets with no safety assumptions inherited implicitly.
METHOD: Review
VMODEL_LEVEL: Validation
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
Higher-voltage variants shall be assessed for isolation and precharge requirements.
Hazard/architecture review documents whether isolation and precharge are needed.
Analysis
Architecture
V4+
Must
Unassigned
Engineering target - proposed
Not Run
-
7. STK-007 - Stakeholder UID: STK-007 STATUS: Draft DOMAIN: Stakeholder RELATIONS (Child): - CAD-002 CAD-002 - CAD (derives_from)
- SCL-001 SCL-001 - Scale-up (derives_from)
- SCL-002 SCL-002 - Scale-up (derives_from)
- SCL-003 SCL-003 - Scale-up (derives_from)
- SCL-004 SCL-004 - Scale-up (derives_from)
- SCL-005 SCL-005 - Scale-up (derives_from)
- SCL-006 SCL-006 - Scale-up (derives_from)
- SCL-007 SCL-007 - Scale-up (derives_from)
- SCL-008 SCL-008 - Scale-up (derives_from)
STATEMENT: The product family shall support 24 V, 48 V and 72 V-class variants through controlled reuse.
ACCEPTANCE: Family architecture defines reusable and variant-specific assets with no safety assumptions inherited implicitly.
METHOD: Review
VMODEL_LEVEL: Validation
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
Variants shall reuse requirement/test templates only after applicability review.
Each inherited requirement lists applicable variants and any revised criterion.
Inspection
Process
V2+
Must
Unassigned
Engineering target - proposed
Not Run
-
7. STK-007 - Stakeholder UID: STK-007 STATUS: Draft DOMAIN: Stakeholder RELATIONS (Child): - CAD-002 CAD-002 - CAD (derives_from)
- SCL-001 SCL-001 - Scale-up (derives_from)
- SCL-002 SCL-002 - Scale-up (derives_from)
- SCL-003 SCL-003 - Scale-up (derives_from)
- SCL-004 SCL-004 - Scale-up (derives_from)
- SCL-005 SCL-005 - Scale-up (derives_from)
- SCL-006 SCL-006 - Scale-up (derives_from)
- SCL-007 SCL-007 - Scale-up (derives_from)
- SCL-008 SCL-008 - Scale-up (derives_from)
STATEMENT: The product family shall support 24 V, 48 V and 72 V-class variants through controlled reuse.
ACCEPTANCE: Family architecture defines reusable and variant-specific assets with no safety assumptions inherited implicitly.
METHOD: Review
VMODEL_LEVEL: Validation
RELEASE: V1-12V
PRIORITY: Must
OWNER: Unassigned
SOURCE: Engineering target - proposed
EXECUTION: Not Run
Series-connected modules shall be validated as one coordinated pack protection system.
System fault model reviews worst-case module trip, imbalance, and unintended reclose.
Analysis
System
V4+
Must
Unassigned
Engineering target - proposed
Not Run